Design Zero · 100 TPD Module — Rulings Register

Design Zero Register — Rulings of 2 and 3 November 2026

Every Architect ruling carried in Design Zero, the earlier records each one unlocks or supersedes, and the one line that governs the section.

Doc No.CBT-MOD-DEC-001
RevisionDesign Zero
StatusDESIGN ZERO — WORKING DESIGN, UNLOCKED
ClassificationISC-2 Confidential
Baseline100 TPD Module · carbon route W1
Design Zero
DESIGN ZERO — WORKING DESIGN, UNLOCKED. Design Zero is unlocked; the Architect locks it when the time is right. Every earlier locked record this design touches is unlocked by CBT-TB-PORTAL-014, not amended. Provenance tags [RULED] [COMPUTED] [INFERRED] [OPEN] [PROPOSED] are kept; under Design Zero a [RULED] tag means ruled by the Architect for Design Zero, not locked. OPEN values are not filled.
Document Control
Document NumberCBT-MOD-DEC-001
DesignDesign Zero · 100 TPD Module
Document StatusDESIGN ZERO — WORKING DESIGN, UNLOCKED
OwnerCarbotura Inc. — Engineering; Allen Witters, Lead Systems Architect
ClassificationISC-2 Confidential
AuthorityCBT-TB-PORTAL-014 (Architect, 2026-11-04)
Decision recordsDECISIONS_2026-11-02.md, DECISIONS_2026-11-03.md (repository root)
SourceCRSRU_HEAT_SOURCE_DESIGN/ARCHITECT_ANSWERS_2026-11-02.md; MOD-ENV-001 §1
The governing line
Design Zero is unlocked; the Architect locks it when the time is right. Everything in this register, and every earlier record it touches, is unlocked. Locking Design Zero is the Architect's act, by a later bulletin.

1. Rulings of 2 and 3 November 2026

Every ruling and direction of the Architect carried in Design Zero, in order, with the earlier record it unlocks or supersedes. The decision records are DECISIONS_2026-11-02.md and DECISIONS_2026-11-03.md at the repository root, each record carrying the status DESIGN ZERO — UNLOCKED.

DateRuling or directionApplied inUnlocks, supersedes or createsStatus
2026-11-02SOFC fuel cells on cleaned syngas, 16 to 22 MW per Module (target plus swing); shift, CO₂-removal and PSA trains deleted; CO₂ captured at the anode outlet, no afterburner (decision form Q1)power tables; CO₂ product; PWR-FCMARM-2026-002 Cluster B PEM lock; ZEP TDS 8 MW per Module nameplate; D-AC-01 / ZEP-INV on the magnetron path; D-29Design Zero — unlocked
2026-11-02Regenesis™ consolidated 13 → 9 frames: per-Line hot frame and recovery frame (Q3, amends D-REG-SCOPE-02); whole roster combined to cut frame countrosterD-REG-SCOPE-02 (13 serials) — consolidated to 9; R1 envelope limits still to be setDesign Zero — unlocked
2026-11-02DC torch, N₂ closed loop, 1,500 VDC long-arc for the first Modules; vapour-through-head microwave A2 as Gen 2 test (Q4, D-65-C)CRSRU loadsconfirms D-65-B; creates D-65-C (bus, erosion, N₂ loop, filter findings)Design Zero — unlocked
2026-11-02No grid, ever; no solar at York (19 acres); everything frame-contained; black-start H₂ supplied; supercritical CO₂ cycles dropped, steam cycle onlypower tables; balancesD-ACM-ENERGY-01 CRSRU allowance 0.35 MW and the Z1 balance 20.48 MW per 400 TPD — re-based to the Module balancesDesign Zero — unlocked
2026-11-0250 percent posture: 100 TPD is half of 200 TPD capability; run like a data centre, follow loadsthroughput; modulationcreates D-ACM-EMS-01 (unwritten)Design Zero — unlocked
2026-11-02FAT and insurability per frame; 20-family common interface set; standardised controllers; every connection frame-to-frame or overheadroster; interfacesD-FME-01 carried; 20-family interface set and interface-panel standard newDesign Zero — unlocked
2026-11-02Everything in sprung halls, drive-through receiving; receiving + Pregenesis™, main (Regenesis™ + MAX), PowerBlock as three halls; ISO tanks tiered two-highbuildings and layoutnew site record (three halls, drive-through feedstock receiving bay, tiered tanks)Design Zero — unlocked
2026-11-03Carbon route W1 is the design point; hydrogen-maximum is the energy-emergency setting only (Q2 amended)every table's design columnD-65-B function wording; D-MCR-FLOW-01 bed steam becomes a swept variable; Pregenesis™ moisture specDesign Zero — unlocked
2026-11-03No hot standby; the 50 percent capacity overhead is the failoverfailover; heat cascadefailover logic (Module file §5, §9.5); D-ACM-EMS-01Design Zero — unlocked
2026-11-03Vocabulary: the Module is a closed-loop system; the former fuel-cell and tank-handling term is retired in every sense; fuel cells, PWR-FCM, tiered tankswhole packageTERMINOLOGY_CANON.md §12; terminology gateDesign Zero — unlocked
2026-11-03Both Lines dispatched equally unless failover or surge; never a Line idled while the other runsthroughput floor 30 TPD; control lawD-LINE-02 and D-MCR-MOD-01 carried; control law added (Module file §9.6)Design Zero — unlocked
2026-11-03Aromatics dropped from the Module's product scope; full dissociation at every setting; trace condensate returns to feedRC3 table; separatorproduct scope; CRSRU severity fixed at full dissociation (no severity sweep)Design Zero — unlocked
2026-11-03Day-1 product slate ruled: eight products from the rostered frames, metals and glass as concentrates; the graphitiser is Phase 2 as the deferrable load; the other RC3 finishing frames out of Module scope until a four-Module facility and a qualifying feedproduct table; Module file section 22new; D-FME-01 finishing frames reduced to MAX-GRA; stages 2 to 6 as facility stagesDesign Zero — unlocked
2026-11-03Excess hydrogen to RC3 finishing as the deferrable load; 4 MEGC (4 h buffer); fuel cells derated on the headroom; black-start reserve self-replenished; H₂ as Recyclotron™ carrier now, as CRSRU plasma gas a Gen 2 testhydrogen section; rosterModule file §6 tank count (4 MEGC); NEXUS interface item; D-65-C memo addendum (H₂ plasma gas, Gen 2 test)Design Zero — unlocked

2. Unlocked by Design Zero

Previously locked or recorded items and what Design Zero does to them. No amendment procedure is run on any of them, because nothing is locked until the Architect locks Design Zero.

Previously locked or recorded itemWhat Design Zero does to itStatus
ARM-2026-002 Cluster B, PEM 128 × 250 kWreplaced by SOFC 16–22 MWunlocked, superseded
ZEP TDS 8 MW per Modulereplaced; 16 to 22 MW chosenunlocked, superseded
D-REG-SCOPE-02, 13 serialsconsolidated to 9unlocked; R1 limits still to be set
D-AC-01 / ZEP-INVreplaced on the magnetron path by DC-DC HVunlocked, superseded
D-ACM-ENERGY-01, 0.35 MW CRSRU allowancereplaced by 3.35 to 4.55 MW per Lineunlocked, re-based
Z1 balance 20.48 MW per 400 TPD facilityreplaced by the Module balances of MOD-DEF-001 §15unlocked, re-based
D-PWR-02, 1,500 VDCcarried into Design Zero unchangedunlocked, carried
D-LINE-02, D-MCR-MOD-01carried; equal dispatch addedunlocked, carried
Catalog per-facility slate and revenue layeringconcentrates on payables; ARM removed; stages 3 to 6catalog session and Corpus Zone, outside Design Zero

3. The Architect's answers of 2026-11-02

The decision form answered in session, as recorded by the sub-session, with the carry-forwards it opened or closed.

Authority: Allen Witters — Lead Systems Architect, answering the sub-session's decision form in session on 2026-11-02 · Classification: ISC-2 Confidential Status: DIRECTION RECORDED BY THE SUB-SESSION. These are the Architect's selections, not decision records. The decision records (D-65-C and the amendments named below) are to be written by the Doc Portal session per the 2026-11-01 directive; nothing in DECISIONS_*.md has been edited here.

# Question Architect's answer Record it creates or amends
1 PowerBlock fuel-cell technology and sizing, no grid SOFC on cleaned syngas, sized to target plus swing: 16 to 22 MW per Module. Deletes the shift, CO₂-removal and PSA train; CO₂ captured at the anode outlet; SOFC heat to a steam cycle (supercritical CO₂ cycles dropped by the Architect later the same day). PowerBlock TDS re-basing: PEM lock (ARM-2026-002 Cluster B, 128 × 250 kW) superseded; 8 MW per Module nameplate superseded; NXS-Z3 routing; D-29
2 Operating setting for the CRSRU duty and product slate Mixed, swept by the simulator (2026-11-02); amended 2026-11-03: the carbon route W1 is the design point, hydrogen-maximum is the energy-emergency setting only, and no aromatic pass-through: the ARM family is dropped from the Module's product scope (same day, "Yes, drop aromatics") [editorial note: aromatics retired catalog-wide at Release 126 (R126)], the CRSRU runs at full dissociation severity at every setting — ruled on the RC3 finding (Module file §17): hydrogen-maximum deletes the CRB and ARM families, about half of catalog gross elemental value, to close a balance the carbon route plus the heat cascade (§16) closes by other means. Feed dried to about 5 %; bed steam swept; carbon product retained; consistent with the 50-percent-and-follow posture. D-65-B function amended to dissociation with the water rule and the carbon-route design point; Pregenesis™ moisture target as a spec; D-MCR-FLOW-01 bed steam becomes a swept variable; simulator CRSRU zone, moisture/EAF and sweep commissioned (no severity dimension)
3 Amend D-REG-SCOPE-02 to the consolidated per-Line frames Yes, both merges. Per Line: one hot frame (Primary Cyclone, booster, CRSRU vessel, two torches, chopper, cooling, service bay) and one recovery frame (quench boiler, topping turbine, HRSG, candle filter). Regenesis™ 13 → 9 frames; PCY and PTS become Assemblies. D-REG-SCOPE-02 amendment; R1 envelope limits needed (two frames at the assumed 30 t); hot FAT bay at the ASI
4 CRSRU heat source for the first Modules DC torch, N₂ closed loop, 1,500 VDC long-arc — D-65-B confirmed with the bus and erosion findings; vapour-through-head microwave (A2) carried as the Gen 2 test target. D-65-C (confirms D-65-B, appends bus, erosion, N₂ loop, filter); D-PWR-02 unchanged; D-AC-01 and ZEP-INV superseded by DC-DC HV converters on the magnetron path (separate direction, same day)

Carry-forwards opened or closed by these answers

Item State after the answers
CRSRU electrical load (D-65-B) closed as a range, 3.35 to 4.55 MW per Line at 50 TPD, DC torch
Electrode erosion (D-65-B) quantified; closes with electrode weighing at change-out
N₂ dilution closed loop via the GPU N₂ product; GPU sized at ~27 % inert where a PSA remains, else the SOFC anode outlet
CO₂ capture at the SOFC anode outlet, liquefied to ISO tank containers; off-take at York OPEN
Energy balance closes at the hydrogen-maximum end with margin on SOFC; the mixed setting's point is the simulator sweep's output
Regenesis MAX™ roster to be drawn on the SOFC basis: gas conditioning, solids, product finishing, energy frames
Interface families eight NEW families, the interface-panel standard, D-48V-01 — still to rule
Feed buffer frame-or-silo, eddy-current separation, hot FAT bay still to rule
York expanded phases on 19 acres do not fit in this frame form; a site question
Design point (2026-11-03) carbon route W1; aromatics dropped from scope; hydrogen-maximum held as the energy-emergency setting; graphitisation of the pristine carbon is the Module's deferrable load; RC3 finishing frames (§17) to be rostered by the Doc Portal under D-FME-01
Product scope (2026-11-03, "Yes, rule it") Day-1 slate of eight products from the rostered frames, metals and glass as concentrates on payables; the graphitiser is Phase 2 as the deferrable load; the other RC3 finishing frames are out of Module scope until a four-Module facility and a qualifying feed (Module file §22)
Excess hydrogen (2026-11-03, "Yes, adopt") surplus hydrogen goes to the RC3 finishing loads as the deferrable load; 4 MEGC per Module for a 4 h buffer; fuel cells dispatched derated on the headroom; black-start reserve self-replenished after commissioning; hydrogen as the Recyclotron™ carrier gas now, as the CRSRU plasma gas a Gen 2 test target (D-65-C memo); facility H₂ header at York; hydrogen-as-product, derivatives and catalytic heating rejected (Module file §20)

4. Still to rule

  • R1 envelope limits for the two consolidated Regenesis™ frames at the assumed 30 t.
  • Eight new interface families, the interface-panel standard, D-48V-01.
  • Feed buffer frame-or-silo, eddy-current separation, hot FAT bay at the ASI.
  • CO₂ off-take at York; R1 limits and hydrogen separation distances on the plot plan.
  • Feed-energy reconciliation: the design-point balance reads −0.8 to +0.3 MW pending the simulator sweep.
  • Locking Design Zero.