Design Zero Register — Rulings of 2 and 3 November 2026
Every Architect ruling carried in Design Zero, the earlier records each one unlocks or supersedes, and the one line that governs the section.
| Document Number | CBT-MOD-DEC-001 |
| Design | Design Zero · 100 TPD Module |
| Document Status | DESIGN ZERO — WORKING DESIGN, UNLOCKED |
| Owner | Carbotura Inc. — Engineering; Allen Witters, Lead Systems Architect |
| Classification | ISC-2 Confidential |
| Authority | CBT-TB-PORTAL-014 (Architect, 2026-11-04) |
| Decision records | DECISIONS_2026-11-02.md, DECISIONS_2026-11-03.md (repository root) |
| Source | CRSRU_HEAT_SOURCE_DESIGN/ARCHITECT_ANSWERS_2026-11-02.md; MOD-ENV-001 §1 |
1. Rulings of 2 and 3 November 2026
Every ruling and direction of the Architect carried in Design Zero, in order, with the earlier record it unlocks or supersedes. The decision records are DECISIONS_2026-11-02.md and DECISIONS_2026-11-03.md at the repository root, each record carrying the status DESIGN ZERO — UNLOCKED.
| Date | Ruling or direction | Applied in | Unlocks, supersedes or creates | Status |
|---|---|---|---|---|
| 2026-11-02 | SOFC fuel cells on cleaned syngas, 16 to 22 MW per Module (target plus swing); shift, CO₂-removal and PSA trains deleted; CO₂ captured at the anode outlet, no afterburner (decision form Q1) | power tables; CO₂ product; PWR-FCM | ARM-2026-002 Cluster B PEM lock; ZEP TDS 8 MW per Module nameplate; D-AC-01 / ZEP-INV on the magnetron path; D-29 | Design Zero — unlocked |
| 2026-11-02 | Regenesis™ consolidated 13 → 9 frames: per-Line hot frame and recovery frame (Q3, amends D-REG-SCOPE-02); whole roster combined to cut frame count | roster | D-REG-SCOPE-02 (13 serials) — consolidated to 9; R1 envelope limits still to be set | Design Zero — unlocked |
| 2026-11-02 | DC torch, N₂ closed loop, 1,500 VDC long-arc for the first Modules; vapour-through-head microwave A2 as Gen 2 test (Q4, D-65-C) | CRSRU loads | confirms D-65-B; creates D-65-C (bus, erosion, N₂ loop, filter findings) | Design Zero — unlocked |
| 2026-11-02 | No grid, ever; no solar at York (19 acres); everything frame-contained; black-start H₂ supplied; supercritical CO₂ cycles dropped, steam cycle only | power tables; balances | D-ACM-ENERGY-01 CRSRU allowance 0.35 MW and the Z1 balance 20.48 MW per 400 TPD — re-based to the Module balances | Design Zero — unlocked |
| 2026-11-02 | 50 percent posture: 100 TPD is half of 200 TPD capability; run like a data centre, follow loads | throughput; modulation | creates D-ACM-EMS-01 (unwritten) | Design Zero — unlocked |
| 2026-11-02 | FAT and insurability per frame; 20-family common interface set; standardised controllers; every connection frame-to-frame or overhead | roster; interfaces | D-FME-01 carried; 20-family interface set and interface-panel standard new | Design Zero — unlocked |
| 2026-11-02 | Everything in sprung halls, drive-through receiving; receiving + Pregenesis™, main (Regenesis™ + MAX), PowerBlock as three halls; ISO tanks tiered two-high | buildings and layout | new site record (three halls, drive-through feedstock receiving bay, tiered tanks) | Design Zero — unlocked |
| 2026-11-03 | Carbon route W1 is the design point; hydrogen-maximum is the energy-emergency setting only (Q2 amended) | every table's design column | D-65-B function wording; D-MCR-FLOW-01 bed steam becomes a swept variable; Pregenesis™ moisture spec | Design Zero — unlocked |
| 2026-11-03 | No hot standby; the 50 percent capacity overhead is the failover | failover; heat cascade | failover logic (Module file §5, §9.5); D-ACM-EMS-01 | Design Zero — unlocked |
| 2026-11-03 | Vocabulary: the Module is a closed-loop system; the former fuel-cell and tank-handling term is retired in every sense; fuel cells, PWR-FCM, tiered tanks | whole package | TERMINOLOGY_CANON.md §12; terminology gate | Design Zero — unlocked |
| 2026-11-03 | Both Lines dispatched equally unless failover or surge; never a Line idled while the other runs | throughput floor 30 TPD; control law | D-LINE-02 and D-MCR-MOD-01 carried; control law added (Module file §9.6) | Design Zero — unlocked |
| 2026-11-03 | Aromatics dropped from the Module's product scope; full dissociation at every setting; trace condensate returns to feed | RC3 table; separator | product scope; CRSRU severity fixed at full dissociation (no severity sweep) | Design Zero — unlocked |
| 2026-11-03 | Day-1 product slate ruled: eight products from the rostered frames, metals and glass as concentrates; the graphitiser is Phase 2 as the deferrable load; the other RC3 finishing frames out of Module scope until a four-Module facility and a qualifying feed | product table; Module file section 22 | new; D-FME-01 finishing frames reduced to MAX-GRA; stages 2 to 6 as facility stages | Design Zero — unlocked |
| 2026-11-03 | Excess hydrogen to RC3 finishing as the deferrable load; 4 MEGC (4 h buffer); fuel cells derated on the headroom; black-start reserve self-replenished; H₂ as Recyclotron™ carrier now, as CRSRU plasma gas a Gen 2 test | hydrogen section; roster | Module file §6 tank count (4 MEGC); NEXUS interface item; D-65-C memo addendum (H₂ plasma gas, Gen 2 test) | Design Zero — unlocked |
2. Unlocked by Design Zero
Previously locked or recorded items and what Design Zero does to them. No amendment procedure is run on any of them, because nothing is locked until the Architect locks Design Zero.
| Previously locked or recorded item | What Design Zero does to it | Status |
|---|---|---|
| ARM-2026-002 Cluster B, PEM 128 × 250 kW | replaced by SOFC 16–22 MW | unlocked, superseded |
| ZEP TDS 8 MW per Module | replaced; 16 to 22 MW chosen | unlocked, superseded |
| D-REG-SCOPE-02, 13 serials | consolidated to 9 | unlocked; R1 limits still to be set |
| D-AC-01 / ZEP-INV | replaced on the magnetron path by DC-DC HV | unlocked, superseded |
| D-ACM-ENERGY-01, 0.35 MW CRSRU allowance | replaced by 3.35 to 4.55 MW per Line | unlocked, re-based |
| Z1 balance 20.48 MW per 400 TPD facility | replaced by the Module balances of MOD-DEF-001 §15 | unlocked, re-based |
| D-PWR-02, 1,500 VDC | carried into Design Zero unchanged | unlocked, carried |
| D-LINE-02, D-MCR-MOD-01 | carried; equal dispatch added | unlocked, carried |
| Catalog per-facility slate and revenue layering | concentrates on payables; ARM removed; stages 3 to 6 | catalog session and Corpus Zone, outside Design Zero |
3. The Architect's answers of 2026-11-02
The decision form answered in session, as recorded by the sub-session, with the carry-forwards it opened or closed.
Authority: Allen Witters — Lead Systems Architect, answering the sub-session's decision form in session
on 2026-11-02 · Classification: ISC-2 Confidential
Status: DIRECTION RECORDED BY THE SUB-SESSION. These are the Architect's selections, not decision
records. The decision records (D-65-C and the amendments named below) are to be written by the Doc Portal
session per the 2026-11-01 directive; nothing in DECISIONS_*.md has been edited here.
| # | Question | Architect's answer | Record it creates or amends |
|---|---|---|---|
| 1 | PowerBlock fuel-cell technology and sizing, no grid | SOFC on cleaned syngas, sized to target plus swing: 16 to 22 MW per Module. Deletes the shift, CO₂-removal and PSA train; CO₂ captured at the anode outlet; SOFC heat to a steam cycle (supercritical CO₂ cycles dropped by the Architect later the same day). | PowerBlock TDS re-basing: PEM lock (ARM-2026-002 Cluster B, 128 × 250 kW) superseded; 8 MW per Module nameplate superseded; NXS-Z3 routing; D-29 |
| 2 | Operating setting for the CRSRU duty and product slate | Mixed, swept by the simulator (2026-11-02); amended 2026-11-03: the carbon route W1 is the design point, hydrogen-maximum is the energy-emergency setting only, and no aromatic pass-through: the ARM family is dropped from the Module's product scope (same day, "Yes, drop aromatics") [editorial note: aromatics retired catalog-wide at Release 126 (R126)], the CRSRU runs at full dissociation severity at every setting — ruled on the RC3 finding (Module file §17): hydrogen-maximum deletes the CRB and ARM families, about half of catalog gross elemental value, to close a balance the carbon route plus the heat cascade (§16) closes by other means. Feed dried to about 5 %; bed steam swept; carbon product retained; consistent with the 50-percent-and-follow posture. | D-65-B function amended to dissociation with the water rule and the carbon-route design point; Pregenesis™ moisture target as a spec; D-MCR-FLOW-01 bed steam becomes a swept variable; simulator CRSRU zone, moisture/EAF and sweep commissioned (no severity dimension) |
| 3 | Amend D-REG-SCOPE-02 to the consolidated per-Line frames | Yes, both merges. Per Line: one hot frame (Primary Cyclone, booster, CRSRU vessel, two torches, chopper, cooling, service bay) and one recovery frame (quench boiler, topping turbine, HRSG, candle filter). Regenesis™ 13 → 9 frames; PCY and PTS become Assemblies. | D-REG-SCOPE-02 amendment; R1 envelope limits needed (two frames at the assumed 30 t); hot FAT bay at the ASI |
| 4 | CRSRU heat source for the first Modules | DC torch, N₂ closed loop, 1,500 VDC long-arc — D-65-B confirmed with the bus and erosion findings; vapour-through-head microwave (A2) carried as the Gen 2 test target. | D-65-C (confirms D-65-B, appends bus, erosion, N₂ loop, filter); D-PWR-02 unchanged; D-AC-01 and ZEP-INV superseded by DC-DC HV converters on the magnetron path (separate direction, same day) |
Carry-forwards opened or closed by these answers
| Item | State after the answers |
|---|---|
| CRSRU electrical load (D-65-B) | closed as a range, 3.35 to 4.55 MW per Line at 50 TPD, DC torch |
| Electrode erosion (D-65-B) | quantified; closes with electrode weighing at change-out |
| N₂ dilution | closed loop via the GPU N₂ product; GPU sized at ~27 % inert where a PSA remains, else the SOFC anode outlet |
| CO₂ capture | at the SOFC anode outlet, liquefied to ISO tank containers; off-take at York OPEN |
| Energy balance | closes at the hydrogen-maximum end with margin on SOFC; the mixed setting's point is the simulator sweep's output |
| Regenesis MAX™ roster | to be drawn on the SOFC basis: gas conditioning, solids, product finishing, energy frames |
| Interface families | eight NEW families, the interface-panel standard, D-48V-01 — still to rule |
| Feed buffer frame-or-silo, eddy-current separation, hot FAT bay | still to rule |
| York expanded phases on 19 acres | do not fit in this frame form; a site question |
| Design point (2026-11-03) | carbon route W1; aromatics dropped from scope; hydrogen-maximum held as the energy-emergency setting; graphitisation of the pristine carbon is the Module's deferrable load; RC3 finishing frames (§17) to be rostered by the Doc Portal under D-FME-01 |
| Product scope (2026-11-03, "Yes, rule it") | Day-1 slate of eight products from the rostered frames, metals and glass as concentrates on payables; the graphitiser is Phase 2 as the deferrable load; the other RC3 finishing frames are out of Module scope until a four-Module facility and a qualifying feed (Module file §22) |
| Excess hydrogen (2026-11-03, "Yes, adopt") | surplus hydrogen goes to the RC3 finishing loads as the deferrable load; 4 MEGC per Module for a 4 h buffer; fuel cells dispatched derated on the headroom; black-start reserve self-replenished after commissioning; hydrogen as the Recyclotron™ carrier gas now, as the CRSRU plasma gas a Gen 2 test target (D-65-C memo); facility H₂ header at York; hydrogen-as-product, derivatives and catalytic heating rejected (Module file §20) |
4. Still to rule
- R1 envelope limits for the two consolidated Regenesis™ frames at the assumed 30 t.
- Eight new interface families, the interface-panel standard, D-48V-01.
- Feed buffer frame-or-silo, eddy-current separation, hot FAT bay at the ASI.
- CO₂ off-take at York; R1 limits and hydrogen separation distances on the plot plan.
- Feed-energy reconciliation: the design-point balance reads −0.8 to +0.3 MW pending the simulator sweep.
- Locking Design Zero.