Frames and flows v5 and plot plan v6, exported from Lucid at full page size; pan and zoom in the full-screen viewer; edit links to the Lucid documents.

Doc No.CBT-MOD-DRW-001
RevisionDesign Zero
StatusDESIGN ZERO — WORKING DESIGN, UNLOCKED
ClassificationISC-2 Confidential
Baseline100 TPD Module · carbon route W1
Design Zero
DESIGN ZERO — WORKING DESIGN, UNLOCKED. Design Zero is unlocked; the Architect locks it when the time is right. Every earlier locked record this design touches is unlocked by CBT-TB-PORTAL-014, not amended. Provenance tags [RULED] [COMPUTED] [INFERRED] [OPEN] [PROPOSED] are kept; under Design Zero a [RULED] tag means ruled by the Architect for Design Zero, not locked. OPEN values are not filled.
Document Control
Document NumberCBT-MOD-DRW-001
DesignDesign Zero · 100 TPD Module
Document StatusDESIGN ZERO — WORKING DESIGN, UNLOCKED
OwnerCarbotura Inc. — Engineering; Allen Witters, Lead Systems Architect
ClassificationISC-2 Confidential
AuthorityCBT-TB-PORTAL-014 (Architect, 2026-11-04)
Lucidframes and flows v5 eafcad99-b7c2-4b74-9be4-ff110d0596c1; plot plan v6 f4b0bfee-a0bd-4349-8168-6afe51c42056

1. Frames and flows, v5

Every frame of the Module in its band (Pregenesis™, Regenesis™, Regenesis MAX™, energy and utilities, ISO tank containers), with the material, gas, steam, DC and hydrogen flows between them. Design point: carbon route W1. Labels follow the Design Zero vocabulary (fuel cells, PWR-FCM, tiered tanks, feedstock receiving bay).

DIAG-MOD-DRW-001-01100 TPD Module — Frames and Flows v5
Frames and flows
100 TPD Module — Frames and Flows v5
Lucid document eafcad99-b7c2-4b74-9be4-ff110d0596c1 (v4 558f2e67 superseded) · PNG export at full page size · edit in Lucid · use the full-screen control to pan and zoom.

2. Plot plan, v6

One Module in three sprung (tensioned-membrane) halls in line with 10 m fire gaps: Hall 1 feedstock receiving bay and Pregenesis™ (75 × 40 m), Hall 2 Regenesis™ and Regenesis MAX™ (75 × 50 m, 15 m ridge), Hall 3 PowerBlock (50 × 40 m). ISO tank containers tiered two-high on an 18 × 50 m pad; MEGC at grade. Envelope 253 × 65 m ≈ 1.64 ha per Module; four Modules sharing lanes and one tiered pad about 4.8 ha of 7.7 at York. R1 limits and hydrogen separation distances remain OPEN.

DIAG-MOD-DRW-001-02100 TPD Module — Plot Plan v6, three sprung halls
Plot plan
100 TPD Module — Plot Plan v6, three sprung halls
Lucid document f4b0bfee-a0bd-4349-8168-6afe51c42056 (plot plans v1–v5 superseded) · PNG export at full page size · edit in Lucid · use the full-screen control to pan and zoom.

3. Reading the drawings

The drawings are the Module file made visible: the roster of §4 and §10, the layout of §14, and the flows of the envelope's Sankeys (MOD-ENV-001 §4). Where a drawing and the Module file differ, the Module file is the source of record and the drawing is re-issued.