Design Zero · 100 TPD Module — Operating Envelope

100 TPD Module — Operating Envelope

CRSRU heat-source sub-session · 2026-11-03 · for Allen Witters, Lead Systems Architect · consolidated envelope of the Module file §1–20, rolled up 2026-11-03; light mode; diagrams, charts and the product table added · Design Zero: working design, unlocked; the Architect locks it when the time is right · provenance [RULED] [COMPUTED] [INFERRED] [OPEN]

Doc No.CBT-MOD-ENV-001
RevisionDesign Zero
StatusDESIGN ZERO — WORKING DESIGN, UNLOCKED
ClassificationISC-2 Confidential
Baseline100 TPD Module · carbon route W1
Design Zero
DESIGN ZERO — WORKING DESIGN, UNLOCKED. Design Zero is unlocked; the Architect locks it when the time is right. Every earlier locked record this design touches is unlocked by CBT-TB-PORTAL-014, not amended. Provenance tags [RULED] [COMPUTED] [INFERRED] [OPEN] [PROPOSED] are kept; under Design Zero a [RULED] tag means ruled by the Architect for Design Zero, not locked. OPEN values are not filled.
Document Control
Document NumberCBT-MOD-ENV-001
DesignDesign Zero · 100 TPD Module
Document StatusDESIGN ZERO — WORKING DESIGN, UNLOCKED
OwnerCarbotura Inc. — Engineering; Allen Witters, Lead Systems Architect
ClassificationISC-2 Confidential
AuthorityCBT-TB-PORTAL-014 (Architect, 2026-11-04)
Source of recordCRSRU_HEAT_SOURCE_DESIGN/OPERATING_ENVELOPE.html on main; Plotly 2.27.0 self-hosted at assets/js/vendor/
Product datacatalog session products.json (the 116-entry file less the 13 aromatics entries retired at Release 126: 103 products; tier and chain carried verbatim)

Consolidated operating envelope of the 100 TPD Module, rolled up from the CRSRU heat-source sub-session on the Architect's direction of 2026-11-03. Per Module: two Lines dispatched equally, four Recyclotron™ reactors, SOFC PowerBlock on syngas, no grid, closed loop. The carbon route W1 is the design point; the mixed and hydrogen-maximum columns are the swept and emergency settings. Everything scales with throughput except the floors and the fuel-cell cap. Source of record: MODULE_100TPD_DEFINITION.md.

1. Rulings in force

Architect rulings and directions carried in this envelope, in order. This is Design Zero: everything is unlocked, including the earlier locked records these rulings replace, until the Architect locks it. The Module file carries each ruling where it is applied.

DateRuling or directionApplied in
2026-11-02SOFC fuel cells on cleaned syngas, 16 to 22 MW per Module (target plus swing); shift, CO₂-removal and PSA trains deleted; CO₂ captured at the anode outlet, no afterburner (decision form Q1)power tables; CO₂ product; PWR-FCM
2026-11-02Regenesis™ consolidated 13 → 9 frames: per-Line hot frame and recovery frame (Q3, amends D-REG-SCOPE-02); whole roster combined to cut frame countroster
2026-11-02DC torch, N₂ closed loop, 1,500 VDC long-arc for the first Modules; vapour-through-head microwave A2 as Gen 2 test (Q4, D-65-C)CRSRU loads
2026-11-02No grid, ever; no solar at York (19 acres); everything frame-contained; black-start H₂ supplied; supercritical CO₂ cycles dropped, steam cycle onlypower tables; balances
2026-11-0250 percent posture: 100 TPD is half of 200 TPD capability; run like a data centre, follow loadsthroughput; modulation
2026-11-02FAT and insurability per frame; 20-family common interface set; standardised controllers; every connection frame-to-frame or overheadroster; interfaces
2026-11-02Everything in sprung halls, drive-through receiving; receiving + Pregenesis™, main (Regenesis™ + MAX), PowerBlock as three halls; ISO tanks tiered two-highbuildings and layout
2026-11-03Carbon route W1 is the design point; hydrogen-maximum is the energy-emergency setting only (Q2 amended)every table's design column
2026-11-03No hot standby; the 50 percent capacity overhead is the failoverfailover; heat cascade
2026-11-03Vocabulary: the Module is a closed-loop system; the former fuel-cell and tank-handling term is retired in every sense; fuel cells, PWR-FCM, tiered tankswhole package
2026-11-03Both Lines dispatched equally unless failover or surge; never a Line idled while the other runsthroughput floor 30 TPD; control law
2026-11-03Aromatics dropped from the Module's product scope; full dissociation at every setting; trace condensate returns to feedRC3 table; separator
2026-11-03Day-1 product slate ruled: eight products from the rostered frames, metals and glass as concentrates; the graphitiser is Phase 2 as the deferrable load; the other RC3 finishing frames out of Module scope until a four-Module facility and a qualifying feedproduct table; Module file section 22
2026-11-03Excess hydrogen to RC3 finishing as the deferrable load; 4 MEGC (4 h buffer); fuel cells derated on the headroom; black-start reserve self-replenished; H₂ as Recyclotron™ carrier now, as CRSRU plasma gas a Gen 2 testhydrogen section; roster

2. The Module in one table

ItemValue
Fresh feed100 TPD as received, mineral included: 23.7 % moisture, 10.2 % mineral, 66.1 % organic; dried to 5 % in Pregenesis™
Lines2 × 50 TPD sustained, both duty, each rated for 100 TPD; dispatched equally; failover from the 2× headroom, no standby units
Recyclotrons™4, all duty, 25 TPD at 300 kW on the design point; 50 TPD at 600 kW capability; 1.2 MW uprate ceiling
Operating settingcarbon route W1 design point: feed dried to 5 %, no bed steam, carbon product retained; hydrogen-maximum held as the emergency setting; aromatics out of scope
Products per day at 100 TPDcarbon black 8.9 t (pristine, vapour-derived) and bed char 9.4 t; Mineral Phase 10.2 t; liquid CO₂ 51 to 71 t; product water 20 to 75 t surplus; hydrogen 7.8 to 8.9 t made and consumed as internal fuel, never a product
PowerSOFC fuel cells 16 to 22 MW installed (PWR-FCM, 12 to 15 frames), quench topping turbines and an SOFC steam cycle; 1,500 VDC zone bus, 800 VDC device links, DC-native; no grid; BESS 5 MWh / 2 MW; H₂ buffer 4 MEGC, 4 h
Balance at 100 TPD−0.5 MW on the design point, +0.3 MW with the heat cascade, about −1 MW with full RC3 finishing (closed by 65 % fuel cells or a calorific floor on the feed)
Buildingsthree sprung halls in line with 10 m fire gaps: receiving + Pregenesis™ 75 × 40 m, main 75 × 50 m (15 m ridge), PowerBlock 50 × 40 m; coolers and the tiered tank pad outside; 1.64 ha per Module, four at York about 4.8 ha of 7.7
Frames36 to 46 per Module on the consolidated roster; 42 to 55 with RC3 finishing
Near-zeroCO₂ captured and liquefied; nothing oxidised outside the fuel cells; the separator, the condensate and the cold-gas trace all return to the process; the only bulk stream leaving the fence is liquid CO₂ to off-take

3. Evolution in stages

One design read at four points in time. Each stage is reached by a decision already on the record or named in its last row; nothing in a later stage is assumed by an earlier one.

Stage 1 — Day-1 ModuleStage 2 — Phase 2, graphitiserStage 3 — four-Module facility (York)Stage 4 — Gen 2 heat source
Triggerthe rulings of 2 and 3 Novemberthe Phase 2 ruling; MAX-GRA sizedthe 400 TPD contract at York; a finishing hall shared by four Modulesthe Gen 2 tests: H₂ as plasma gas, A2 microwave, 65 % fuel cells
Throughput100 TPD target, both Lines equal; 120–165 sustained on the swing rating; 200 peaksame400 TPD target; 480–660 sustained on the same frames and landsame frames, higher margin
Products8 carbon black, bed char, industrial CO₂, ferrous, non-ferrous concentrate, aggregate concentrate, SCM powder, industrial DI water12 adds standard and high-purity graphite and the classified carbon-black gradesabout 50 the RC3 floor less the ash-derived products, through the shared finishing hallsame slate; the RC4 carbon products reachable from the graphite line when a market justifies them
Catalog tiersRC1 and RC2; water at RC3adds carbon at RC3RC3 floor across five families—
Frames per Module36–46+1 to 2 (MAX-GRA, classification)+6 to 9 in the finishing hall, shared: +2 per Module-equivalent−2 to −3 (N₂ loop, generator and T75 deleted)
Added electric load0+1.1 to 1.9 MW, deferrable+2 to 3.5 MW per Module-equivalent, batched−0.3 MW compression; +0.4 MW fuel-cell output
Balance on the design point−0.8 to +0.3 MWabout −1 MW; closed by 65 % fuel cells or the calorific floor−1.7 to −3.2 MW per Module-equivalent; needs the Stage 4 levers or the calorific floorabout +0.5 to +1 MW
Hydrogeninternal fuel; 4 MEGC, 4 h; surplus to the black-start reserve and derated fuel cellssurplus to the graphitisation block, 22:00 to 10:00facility Z3 H₂ header pooling four Modules into the finishing hallH₂ as Recyclotron™ carrier and CRSRU plasma gas; no N₂ loop
Heatcascade items 1 to 7plus the graphitiser's recovery to the 40 bar headershared steam header and thermal store across Modules—
Buildingsthree sprung halls per Module, tiered tank pad, 1.64 hathe graphitiser in Hall 2's MAX baysfour Modules in line, shared fire lanes, one tiered pad, one finishing hall; about 4.8 to 5.5 ha of 7.7—
Needs ruledD-65-C, Q2 amendments, D-REG-SCOPE-02, PowerBlock re-basing, D-ACM-EMS-01, product-scope recordMAX-GRA specification under D-FME-01finishing-hall frames under D-FME-01; concentrate-to-refined per family; catalog concentrate pricingD-65-C Gen 2 addendum; fuel-cell specification at 65 %

Advanced stages: reaching RC4 and RC5

Two facility stages on the shared finishing hall of Stage 3. Neither changes the Module, its balances, its dispatch rule or the hydrogen rule; hydrogen is used in fence as a reductant and a CVD atmosphere and is still never a product. Product IDs, chains and volumes are the catalog's on the 100 TPD basis; the lines, units and loads are this package's estimates (Module file section 24).

Stage 5 — RC4 Specialized Circular MaterialStage 6 — RC5 Premium Circular Product
TriggerStage 3 finishing hall running; market pull for the advanced carbon lineStage 5 lines running; the Gen 2 heat source for the fullerene slipstream; certified QC
Products34 advanced carbon (spheroidised and synthetic graphite, graphene oxide, carbon-fibre precursor, MWCNT by CVD on the Module's own CO, nanoporous and templated carbons); battery metals; ash-derived REE and heavies; glass and silica; deeper water polish; beverage CO₂, specialty gases, neon; specialty filler17 graphene and nanocarbon (rGO by hydrogen reduction, graphene, SWCNT, fullerenes from a CRSRU plasma slipstream); ultra-pure W, Bi, Ga, In; ultra-pure silica; UHP N₂, xenon, krypton; pharmaceutical and ultra-pure water; low-activation aggregate
Catalog volume at 100 TPD24.2 t/d5.8 t/d, most lines in kilograms per day
Units added+8 to 12 in the shared hall+6 to 8, a cleanroom-class bay and a QC laboratory
Added load, Module scale, shared across four+1.8 to 2.7 MW+0.9 to 1.1 MW
Hydrogen and CO useCO as the CNT carbon source; hydrogen in CVD atmosphereshydrogen as the GO reductant; both internal, never a product
Feed dependencebattery metals need a battery fraction and a battery pick in the receiving bay; ash REE and heavies need the Enhancement Admix setting; carbon, water, glass and gas lines need noneultra-pure metals need electronics, LED/LCD and pharma fractions: a facility toll line, not a Module line
Never deliveredthe mixed gas and pure CO (the Module's fuel)same
Needs ruledfinishing-hall partition under D-FME-01; the battery pick as a safety specification; the admix setting; catalog tiers and yields confirmeda market pull per RC5 line before its unit is bought; Gen 2 slipstream test; certification path
Stage 1 is complete on paper and is what this envelope defines. Stage 2 is one frame and one control line, where the hydrogen surplus and the batch posture go to work. Stage 3 is a facility decision, not a Module decision: the finishing frames pay only when four Modules feed one hall. Stage 4 is the heat-source programme already in the D-65-C memo, and the stage that turns the design-point balance positive without a calorific floor on the feed.

4. Flow diagrams: materials, energy and each utility

Sankey diagrams of the design point, carbon route at 100 TPD, both Lines equal, with the heat cascade. The first combines everything on an energy basis; the rest are one stream each in its own unit. Widths are to scale within each diagram; hover a link for its value.

Overall, energy basis: everything on one diagram, MW (LHV for chemical energy), carbon route at 100 TPD with the heat cascade

How to read it. Mass streams are drawn at their chemical energy (lower heating value), so the feed enters at 19.4 MW, the carbon products leave at 6.9 MW and the syngas carries 13.2 MW to the fuel cells; CO₂, water and the Mineral Phase carry no chemical energy and do not appear. The bus is drawn twice to keep the diagram acyclic: the loads it feeds on the left (9.8 MW) and the generation it collects on the right (10.15 MW) are the same bus; the difference is the 0.35 MW margin. Electricity that goes into the reactors and the torches is stored in the syngas as chemical energy by the endothermic dissociation, which is why the syngas carries more than the feed's share. The heat pool collects every rejected stream (fuel-cell heat 5.0, CRSRU and torch cooling 6.6, magnetron, drive and dryer-vapour heat 2.95) and returns 1.1 MW as process heat and 1.95 MW as electricity through the steam cycle, the topping turbines and the cascade; 11.3 MW is rejected to air. Reconciliation finding: closing this diagram needs 19.4 MW of feed chemical energy, which is 25 MJ/kg on the 66.1 t/d of dry, ash-free organics; typical reference feed is 20 to 23 MJ/kg. At 22 MJ/kg the syngas to the fuel cells would be about 11 MW and the electric output about 6.8 MW, widening the design-point deficit by about 1.4 MW. That is the calorific floor on the feed of the Module file, now in numbers, and it is carried as section 21 there.

Materials, per Module per day, carbon route at 100 TPD (t/d)

Dried feed includes the 10.2 t of mineral that passes through the reactors to the Mineral Phase and 10 to 20 t/d of recycled admix, internal; the 74 t of oxygen is drawn from cathode air and leaves bound in the CO₂ and water. Class 4; element basis.

Electricity at the 1,500 VDC bus, carbon route at 100 TPD with the heat cascade (MW)

Heat, per Module at 100 TPD: where 6 to 10 MW of rejected heat goes after the cascade (MW, midpoints)

Steam, per Module at 100 TPD (t/h, 40 bar / 400 °C header)

Water, per Module per day at 100 TPD (t/d): the Module is a net producer

Nitrogen, per Module (Nm³/h): a closed loop with a small make-up

Carbon dioxide, per Module per day at 100 TPD (t/d): captured at the anode outlet, liquefied on recovered heat

Hydrogen, per Module at 100 TPD (kg/h): internal fuel, never a product

Steam, water and nitrogen figures are Class 4 midpoints consistent with the tables; the N₂ loop, the hydrogen carrier and the thermal store are circulations drawn at their make-up or draw, not their inventory.

5. Throughput

LevelModuleLineRecyclotron™Set by
Floor30 TPD (both Lines at their floor; equal dispatch)~15 TPD, about 15 % of capability6 to 8 TPDtorch pilot arc and N₂ loop minimum
Target, sustained100 TPD5025 at 300 kW (carbon) to ~700 kW (H₂-max)D-LINE-02, the 50-percent posture
Sustained ceiling, fuel cells 16–22 MW120–165 H₂-max · 140–190 mixed · 165–200 carbonhalf30 to 50fuel-cell capacity
Peak, 1–2 h on BESS + H₂ buffer200 TPD (H₂-max ~170, reactor uprate ceiling)10050 at 600 kWframe ratings, reactor power cap
One Line out100 TPD on the other Line's 2× rating, refractory-life limited10050failover, §5

6. Average applied power by tonnage, MW at the 1,500 VDC bus

Line dispatch: equal. Both Lines run at the same setpoint at all times; the split departs from equal only in failover (one Line carries the Module on its 2× rating) and never by idling a Line. In surge both Lines rise together (Architect, 2026-11-03).

Design point: carbon route W1 (Architect, 2026-11-03). Mixed and hydrogen-maximum columns are the swept and the energy-emergency settings.

Load = 0.8 MW fixed + variable per tonne. Generation = SOFC electric (capped at the 22 MW target-plus-swing installation) + topping turbines + SOFC steam cycle. With cascade adds the heat-cascade credit of section 8. Grey italics: above the Recyclotron™ uprate ceiling for that setting.

TPDCarbon route W1Mixed (midpoint)Hydrogen-maximumHeat rejected before cascade, MW
loadgenbalancewith cascadeloadgenbalancewith cascadeloadgenbalancewith cascade
30 floor3.52.8-0.7-0.54.03.4-0.6-0.34.64.1-0.5-0.11.8 – 3.0
253.02.3-0.7-0.53.52.9-0.6-0.33.93.4-0.5-0.21.5 – 2.5
505.34.7-0.6-0.26.15.7-0.4+0.17.06.8-0.3+0.43.0 – 5.0
757.57.0-0.5+0.18.88.6-0.3+0.510.210.1-0.1+1.04.5 – 7.5
1009.89.4-0.4+0.411.511.4-0.1+1.013.313.5+0.2+1.66.0 – 10.0
12512.111.7-0.4+0.614.214.2+0.1+1.416.416.9+0.4+2.27.5 – 12.5
15014.314.0-0.3+0.916.917.1+0.2+1.919.620.2+0.7+2.89.0 – 15.0
17516.616.4-0.2+1.219.519.9+0.4+2.422.723.6+0.9+3.410.5 – 17.5
20018.818.7-0.1+1.522.222.8+0.6+2.825.825.2-0.6+2.012.0 – 20.0
The balance stays within ±0.7 MW across the range. Below about 50 TPD the fixed 0.8 MW dominates and every setting runs slightly negative on the 5 MWh BESS and the 1 h hydrogen buffer, so the floor is a transient, not a dwelling point. From 75 TPD up the balance is a near-constant fraction of load (−4 to +4 percent); at the 22 MW fuel-cell cap, reached only by hydrogen-maximum near 200 TPD, every added tonne is paid from the stores. With the cascade the carbon route is positive from 75 TPD and the Module carries 0.4 to 3.4 MW of margin at 100 TPD and above.

Load at the bus by throughput (MW)

Balance with the heat cascade by throughput (MW)

Stores: BESS 2 × 2.5 MWh / 2 × 1 MW · H₂ buffer 4 MEGC, 2 to 3.2 t, 4 h of fuel for the fuel cells plus one black start (adopted 2026-11-03) · bus floor with both Lines at their floor (30 TPD) about 3.5 to 4.5 MW · fuel-cell frames modular, no practical minimum.

7. Utilities

UtilityAt 100 TPDAt 200 TPD peakForm and note
Heat rejected to air6 to 10 MW (4.5 to 7.5 after the cascade)12 to 20 MWcascaded NXS-Z2 loop 95 → 60 → 40 °C, air-cooled condenser; no cooling towers, no water consumed
Steam40 bar / 400 °C from two quench boilers and the SOFC HRSG; process draw 25 to 50 t/d at 3 bar50 to 100 t/ddrying 0.7 MW th, bed steam 0.5 to 1.5 MW (swept), preheats 0.4 MW
Waternet producer: 70 to 125 t/d made in the fuel cells, 25 to 50 t/d to steam, 20 to 75 t/d surplus140 to 250 t/d madeno raw-water intake at steady state; DI make-up for the closed loops only; UTL-WTR 125 t/d
N₂loop 1,500 Nm³/h circulating (700 to 3,800 across the enthalpy sensitivity); make-up 80 to 150 Nm³/h, 2 to 4 t/dloop 3,000 Nm³/h; make-up 4 to 8 t/dmembrane generator 100 to 200 Nm³/h, liquid T75 backup
CO₂ out51 to 140 t/d liquid, −20 °C / 20 bar100 to 280 t/dliquefaction by absorption refrigeration on recovered heat (cascade item 1); 2 days in four tiered T50 pairs
Hydrogen7.8 to 14 t/d made and consumed internally16 to 28 t/dnever a product; buffer 1 h
Solids outcarbon 0 to 18 t/d; mineral 10.2 t/d plus admix purge; acid-gas sorbent ~1 t/ddouble2-day buffers in 20 ft bulk units
Admix recycle10 to 20 t/d internal20 to 40bottom solids or WTE-derived Enhancement Admix, 0 to 25 %
Oily waterdryer condensate 19 t/d with 50 to 300 kg/d of fats, oils and light hydrocarbons; receiving-floor leachate 1 to 3 m³/ddoublecoalescing-plate separator and flotation inside UTL-WTR with a Hall 1 sump; the oil and float go back to PRE-ADX as feed, the water to the polish; nothing leaves the fence (Module file section 19)
Instrument and process air, APSnot sizedOPEN with the APS sizing
Controls48 VDC bus, redundant controllersD-48V-01 pending

8. The 6 to 10 MW of rejected heat — a cascade, not a cooler

The high-grade heat is already taken (process heat first, then the steam cycle, §12). What is still rejected is medium and low grade. On a no-grid Module the smart use is the one that displaces an electric load the Module already carries: a megawatt of load displaced is worth more than a megawatt of heat recovered.

8.1 Where it is, per Module at 100 TPD

StreamGradeMWToday
SOFC cathode air after recuperator and HRSG150 to 250 °C1 to 1.5cathode air outlet, recuperated
SOFC fuel cell coolant and enclosure loop (NXS-Z2)85 to 95 °C3 to 5dry coolers
Steam-cycle condenser50 to 60 °C3 to 3.5air-cooled condenser
Torch and power-electronics cooling35 to 50 °C1.5 to 2.6dry coolers

8.2 The cascade, ranked by electric value

#UseHeat takenGrade neededElectric displaced or made, per 100 TPDWhy it is not tradition
1Absorption refrigeration for CO₂ liquefaction (ammonia–water, −25 °C evaporator) and BESS / power-electronics cooling1.2 to 2.8 MW90 to 150 °C0.3 to 0.7 MW, the whole liquefaction compressor loadturns the largest electric utility load into a heat load; the CO₂ product becomes free to liquefy
2N₂ torch-gas, admix and dried-feed preheat to 300–500 °C from the cathode tail0.3 to 0.5 MW150 to 500 °C0.15 to 0.3 MW of torch electricevery joule put into the plasma gas thermally is a joule the torch does not make
3Anode outlet as Recyclotron™ bed gas: 850 °C CO₂ + H₂O into the bed, C + CO₂ → 2 CO and C + H₂O → CO + H₂ (chemistry lever for the simulator sweep)up to 2 MW plus the reactants800 to 900 °Cmoves energy from the magnetrons to the fuel-cell outlet; shifts the split toward hydrogenuses the heat and the CO₂ chemically inside the fence; consumes carbon, so a setting, not a default
4Organic Rankine cycle on what is left of the 85–95 °C loop2 to 3 MW85 to 95 °C0.2 to 0.3 MWthe traditional item, last in the cascade not first
5Thermal storage, hot-water or packed-bed, 90–400 °C, 10–20 MWh, between HRSG and turbinebuffers—makes the steam cycle's 1.2–1.5 MW dispatchable against the H₂ inventorythe data-centre posture needs a dispatchable source; this is the cheapest one on site
6Feed pre-conditioning: condenser warm air through the 24 h feed buffer and under the receiving-bay slab0.2 to 0.3 MW50 to 60 °C0.1 MW off the dryers; frost-free receiving baythe lowest grade finds its only sink in the feed
7Sprung-hall heating in winter, unit heaters on the 85 °C loop0.5 to 1 MW seasonal85 °Cno electric heating of three hallsthe halls are the heat sink the building decision created

8.3 What the cascade does

Carbon routeMixedHydrogen-maximum
Electric displaced or made, per 100 TPD0.8 MW1.1 MW1.4 MW
Balance, §12.5−0.5 MW≈ 0+0.3 MW
Balance with the cascade+0.3 MW+1.1 MW+1.7 MW
Heat still rejected4.5 MW6 MW7.5 MW, at lower grade
The carbon route closes without a calorific floor on the feed, and every setting carries margin for load-following. The heat is still rejected in the end, as all heat is; it is rejected after it has done the liquefaction and the preheating that electricity was doing.

Roster: PWR-HRS gains the absorption chiller and the thermal store; MAX-CO2 loses its compressor; NXS-Z2 becomes a cascaded loop. Item 3 is a simulator setting (decision form Q2), not adopted. Hall heating is a specification line for the three halls. No hot standby (Architect, 2026-11-03): every frame runs at 50 percent of capability and the headroom is the failover; nothing is held warm and idle.

9. Batchable loads and parasitic energy

About a third of the electric load can be moved within the day, which is the modulation lever that matters. The parasitic heat pool is 1.4 to 2.5 MW more than section 8 counts, but it is low grade and worth a few hundred kilowatts, not megawatts. Per Module at 100 TPD, carbon route.

9.1 Deferrable loads, ranked by swing

#LoadAverage MWBuffer that lets it batchWindowSwing
1Graphitisation of the pristine carbon1.1 to 1.9product keeps; 2-day carbon bufferhours to dayssized 2×, run half the hours: up to 3.8 MW
2Shredder and hammermill, a 16-hour duty at 200 TPD capability0.3 to 0.524 h dried-feed buffer plus the receiving bayhours0.6 to 1.0 MW
3Hydromet metals finishing0.3 to 0.52-day Mineral Phase buffer; liquor tanksdayswhole load
4CO₂ liquefaction, where it stays electric0.3 to 0.7low-pressure gas holder, 1 to 2 h; with absorption refrigeration it batches against the thermal store1 to 2 h0.3 to 0.7 MW
5H₂ buffer compression to 250 bar (buffer flow only)0.15 to 0.3the buffer itselfhourswhole load; the natural sink when H₂ inventory is high
6Admix pulveriser (VRM)0.15 to 0.252-day admix bufferdayswhole load
7N₂ generator0.1 to 0.2liquid T75 and loop receiverhourswhole load
8Carbon activation, classification, pelletising0.1 to 0.22-day solids buffersdayswhole load
9Water treatment and DI polishing0.05 to 0.1T11 tanks, 1 dayhourswhole load
10Dry-cooler and condenser fans0.2 to 0.4none; ambient sets the duty, so the condenser gives more at nightcontinuous±0.1 MW; argues for night batching
Deferrable within the day2.7 to 4.9 MW of 9.825 to 40 % of load, hours-scale (13 to 25 % before RC3 finishing is rostered)

9.2 Modulation hierarchy

TimescaleWhat movesRangeSignal
SecondsBESS (2 MW, 5 MWh); fan speeds±2 MWbus voltage, HVIL
MinutesRecyclotron throughput and the torches that follow the vapour (24:1 reactor envelope, Line floor 15 %)5 to 7 MWH₂ inventory first, feed inventory second
Minutes to an hourSOFC fuel cells, 2 to 5 % per minute thermally; steam cycle via the thermal store3 to 5 MWH₂ inventory
Hoursthe deferrable loads above2.7 to 4.9 MWday-ahead schedule against H₂, feed and ambient
Daysfeed 24 h, admix, solids and CO₂ 2 daysthroughput ±20 % across the weekfeedstock arrivals
Control law addition: batch loads run when the H₂ buffer is above setpoint and stop when it is below, before the throughput setpoint is touched, so the reactors and torches see the slowest and smallest excursions.

9.3 Parasitic energy not yet in the ledger

SourceGradeMWWorthHarvest
Magnetron anode cooling, Gen 1 at 60 to 70 % efficiency, 4 reactors50 to 70 °C0.4 to 1.0feed pre-conditioning, hall heat; too cool for the chiller unless the return runs at 80 °C at the cost of magnetron lifeone loop with the torch cooling → feed-buffer warm air, receiving-bay slab
Dryer vapour latent heat, 19 t/d of water evaporated100 °C condensing0.5the one parasitic stream warm enough for the absorption chillercondensing coil on the dryer off-gas into the 85 to 95 °C loop; MVR does not pay on a steam-rich Module
DC-DC converters, drives, BESS round trip40 to 60 °C0.2 to 0.5lowliquid-cooled electronics on the same loop
Reflected microwave power, EAF 0.10 to 0.1560 °C0.1 to 0.3best harvested by not making itreflected-power tuning loop first
Hot solids: char and Mineral Phase at 600 °C, carbon black at 250 °C250 to 600 °C0.15small but high gradescrew cooler on the bottom-solids outlet → admix or N₂ preheat
H₂ buffer let-down expander; thermoelectrics on hot shells—0.02 to 0.05 eachnot worth a frameleave
Total new to the ledger40 to 100 °C1.4 to 2.5 MW heat0.15 to 0.3 MW electric-equivalent

The largest parasitic item is not a heat stream: it is the reflected microwave power and the water in the feed, which the Recyclotron parasitic ledger shows taking most of the microwave energy on as-received feed. Drying to 5 % and dosing admix by the reflected-power loop are worth more than every harvest in this table.

10. Excess hydrogen: how much, and what to do with it

Hydrogen is Island-Mode internal fuel, never a product. 1 t of H₂ is 33.3 MWh LHV, about 20.6 MWh electric through the fuel cells; a 1 MW surplus for a day is about 1.2 t of H₂ not needed.

10.1 Table of excesses, per Module

Setting, 100 TPDH₂ madeElectric balanceH₂ surplus / deficitShare
Carbon route, design point, no cascade7.8–8.9 t/d−0.5 MW−0.6 t/d−7 %
Carbon route, with the heat cascade7.8–8.9 t/d+0.3 MW+0.35 t/d+4 %
Carbon route, cascade, RC3 finishing on7.8–8.9 t/dabout −1 MW−1.2 t/d−14 %
Mixed, cascade~11 t/d+1.1 MW+1.3 t/d+12 %
Mixed, cascade, RC3 finishing on~11 t/d≈ 0≈ 0—
Hydrogen-maximum (emergency), cascade~14 t/d+1.7 MW+2.0 t/d+14 %
200 TPD surge, carbon route, cascade15.6–17.8 t/d+1.5 MW+1.8 t/d+11 %, 1–2 h
Under batch scheduling on the design point, surplus accumulates at about 70 kg/h for 12 hours (0.8 to 1.1 t) and is drawn down in the next 12. The two-MEGC buffer is just enough for that cycle and leaves nothing for black start or surge: two more MEGC, tiered, give the 4 h buffer the batch posture wants. The steady-state excess is a few percent of production and goes negative once RC3 finishing runs; because the supply-to-load ratio is fixed, 0.35 t/d of surplus buys about 3 TPD of throughput, not 30. Excess hydrogen does not buy tonnage.

10.2 Matrix of uses, ranked

#UseH₂ it takesYieldsIn fence, no oxidation, not a productVerdict
1Refining depth: electricity for the RC3 finishing loads as the batch loadsthe surplus and more1 t of surplus H₂ graphitises 4 to 7 t of pristine carbon to RC3 graphite, feeding the RC4 carbon productsyesfirst call
2Replenish the black-start reserve from the Module's own H₂0.6 t once, top-upsno external energy supply after commissioningyesdo it; the first 0.6 t of any surplus
3Derate the fuel cells: more frames at lower current density0.2–0.4 t/d62 → 64–65 % efficiency and longer frame lifeyesdo it on the headroom
4Extend the buffer to 4 h, two more tiered MEGC0.15–0.3 MW compressiondeeper load-following, surge beyond the BESS, black start without the reserveyesdo it; enables item 1
5H₂ as the Recyclotron bed carrier and sweep gas instead of N₂circulatesless tar, less N₂ make-up, cleaner vapour to the CRSRUyesadopt; a circulation, not a sink
6H₂ as the CRSRU plasma gas instead of the N₂ loop (Gen 2)circulates, joins the syngasdeletes the N₂ loop, the 27 % inert fraction, the N₂ generator and T75; electrode erosion in H₂ plasma is the riskyesGen 2 test target alongside A2; does not reopen D-65-C
7Direct H₂ reduction of Mineral Phase oxides as the front end of the MTL line0.1–0.3 t/dmetal from oxide in fence, water the only by-product; lifts MTL toward RC3 with less reagentyesa line in the hydromet frame
8Raise throughputall of itabout +3 TPD per 0.35 t/d; every tonne brings its own loadyesnot a use; the ratio is fixed
9Catalytic hydrogen heaters—water only, but oxidation equipment; the fuel cell does it at twice the valuenorejected
10Ammonia, methane (Sabatier), hydrogenated products—hydrogen as a product in disguise; methanation returns captured CO₂ to a fuelnorejected
11Pool across Modules through a facility H₂ headerpooledfour Modules at York feed one finishing hall; item 1 at facility scaleyesthe facility form of item 1
12Grid, sale, pipeline——nonever
The call, adopted by the Architect 2026-11-03. Excess hydrogen does not increase capacity in tonnes; it increases capacity in refining depth. Send it to the RC3 finishing loads as the deferrable load, with a 4 h buffer so the batch cycle and a black start both fit, run the fuel cells derated on the headroom in between, use hydrogen as the Recyclotron carrier now and test it as the plasma gas for Gen 2, and replenish the black-start reserve internally. Everything that makes hydrogen a product or oxidises it outside the fuel cell stays rejected.

10.3 Graphitisation batch cycle schedule

Carbon route at 100 TPD, both Lines equal; 8.9 t/d of pristine carbon; one continuous vertical induction graphitiser sized at 2× average (750 kg/h, 2.6 to 3.8 MW); hot zone held at about 1,200 °C between blocks on 0.1 to 0.15 MW rather than cycled to cold, which would destroy the susceptor in months. The hold is the running state of a deferrable load, not a standby unit.

TimeBlockGraphitiserOther batch loadsModule balanceH₂ buffer
22:00–06:00Production, first 8 h750 kg/h, 2.6–3.8 MWshredder off, hydromet off, night fan dutyabout −2.2 MWdischarging, 1.3 t over the block
06:00–10:00Production, last 4 h or stop on the gateas aboveshredder on at 06:00about −2.8 MWdischarging to the 25 % gate
10:00–18:00Hold1,200 °C hold, 0.1–0.15 MW; lot cooling and classificationshredder on; hydromet day shift; activation block on steamabout +0.8 MWcharging
18:00–22:00Holdhold; next lot stagedshredder on to 22:00about +1.4 MWcharging to the 60 % gate
Energy available for graphitisationBlockGraphitised per dayOf 8.9 t/d
design-point surplus with the cascade alone, +0.3 MW3 h1.5–2 t20 %; the rest ships as carbon black at RC2
plus 65 % fuel cells and the graphitiser's own heat recovery7–8 h5–6 t60–70 %
full 12 h block, all carbon to RC312 h8.9 t100 %; needs about 1 MW more than the Module makes at 100 TPD (the calorific floor on the feed)
Gate in the control law: a block starts at 22:00 if the H₂ buffer is above 60 % and the dried-feed buffer above 12 h, and ends at 10:00 or at 25 % buffer, whichever is first. Six blocks a week and one 24 h maintenance window; the block is the first load shed in surge and in Line failover, and restarts from the hold in under an hour. At 100 TPD on the design point the Module graphitises roughly two-thirds of its pristine carbon from its own energy and ships the rest at RC2, unless the feed carries the calorific floor.

11. Downstream to RC3 — not included; what it would add

The Module definition and every table above stop at the Module boundary: carbon black and bed char, Mineral Phase, liquid CO₂, product water, hydrogen as internal fuel. The RC3 tier of the RevCon™ ladder (Optimized Circular Materials, 26 products, about 69.4 TPD per 100 TPD in the catalog after the four aromatics products (11.25 TPD) left it at Release 126) needs finishing trains that are not in the roster, the balances or the halls.

FamilyRC3 productsModule stream todayFinishing not yet rosteredAdded load at 100 TPD
CRB carbon006, 007, 008 high-purity graphite, 019pristine carbon black 8.9 t/d (vapour-derived); bed char 9.4 t/dgraphitisation 2,800 °C, 3–5 kWh/kg (MAX-GRA); steam activation of char (MAX-ACT); classification and pelletising1.1 to 1.9 MW + 0.3–0.5 MW thermal
MTL metals and REE010, 012, 013, 014, 015, 033, 050Mineral Phase 10.2 t/ddoré, REE-oxide and minor-metal concentrates: leach, SX, precipitation; 2–3 frames, reagents, 20–40 t/d water0.3 to 0.5 MW
GLS glass005, 006, 007, 012in the Mineral Phaseoptical and density sort, cullet wash, silica polish0.1 MW
GAS industrial gases006, 007, 008, 016, 017liquid CO₂ 51–140 t/d; loop N₂ onlyair-separation products: an ASU frame, 100–300 Nm³/h class0.3 to 0.6 MW
WTR water004, 005, 006, FC-00120–75 t/d surplus; UTL-WTR 125 t/dmembrane and resin polish inside UTL-WTR0.05 MW
MTL minerals (MIN merged)003, 004Mineral Phase bulkgrading and bagging; largely included—
Total26 products6 to 9 frames, one hot2 to 3.5 MW electric

11.1 Balances with RC3 finishing

Carbon routeMixedHydrogen-maximum
Balance with the heat cascade+0.3 MW+1.1 MW+1.7 MW
RC3 finishing load−2.0 to −3.5 MW−1.5 to −2.5 MW−0.8 to −1.2 MW (no graphite: no carbon)
Balance with RC3 finishing−1.7 to −3.2 MW−0.4 to −1.4 MW+0.5 to +0.9 MW, but no CRB products
With graphitisation as the deferrable load and its heat in the cascadeabout −1 MW≈ 0—
Graphitisation is the Module's deferrable load. Batch, interruptible, product keeps: run it when the H₂ inventory is high, stop it when low. It is the natural follow-loads sink the data-centre posture was missing, and its >1,000 °C rejection is 0.8 to 1.2 MW back into the cascade. With both, the carbon route sits near −1 MW with the full RC3 slate, closed by 65-percent fuel cells or a calorific floor on the feed.

11.2 The conflict to rule on

Hydrogen-maximum sends the carbon to the fuel cells and reforms the aromatics, which removes the CRB family (34 % of catalog gross elemental value on the catalog of 2026-11-03, and the graphite that feeds the ~$85 M/yr RC4 carbon products at 400 TPD); the aromatics it also reformed (14 % on that catalog) have since left the catalog (R126). Ruled by the Architect, 2026-11-03: the carbon route W1 is the design point; hydrogen-maximum is the energy-emergency setting only. Amended the same day: aromatics are dropped from the Module's product scope; the CRSRU runs at full dissociation severity at every setting, no pass-through setting in the sweep, the trace condensate returns to feed through the separator. The carbon-route column is now the design column in every table above; fuel cells stay at target plus swing because the emergency setting still has to run; graphitisation is the deferrable load. If RC3 finishing is included: +6 to 9 frames (Module 42 to 55), a 15 m extension of Hall 2 or a fourth finishing hall on the spine, a reagent utility family, and finished-product storage on the pad.

11.3 Refining lines defined, by family, and the RC tier reached

FamilyRefining line definedProductRC tier reachedWhat RC3 needs
CRB carbonMAX-CSP separation and bagging; MAX-ACT and MAX-GRA as placeholderscarbon black CRB-002; bed char CRB-001RC2 (RC1 char)graphitisation sized (the deferrable load) → high-purity graphite CRB-008 RC3, feeding the RC4 graphene products; activation sized
MTL metals and mineralsPRE-SEP ferrous and eddy-current; MAX-CSP density and magnetic separation; grading and baggingferrous and non-ferrous MTL-001/002; mineral aggregate and SCM MIN-003/004RC1 metals; RC3 mineral aggregatehydromet: leach, SX, precipitation, 2–3 frames → seven MTL RC3 products
GLS glassnone; glass stays in the Mineral Phaseglass feedstock GLS-001RC1optical and density sort, cullet wash, silica polish; 1 frame
GAS industrial gasesMAX-GAS liquefaction of the anode-outlet CO₂ by absorption refrigeration; loop N₂ onlyliquid industrial CO₂, 51–140 t/dRC2, industrial grade (tier to be confirmed)ASU frame for the RC3 GAS products; CO₂ purification for a higher-grade CO₂
WTR waterUTL-WTR 125 t/d polish of fuel-cell water and product waterfuel-cell water WTR-FC-001; product waterRC3 with the polishnothing beyond the polish; semiconductor grade is a 97 % RC4 pull-in

Refining reaches RC3 today for water and the mineral aggregate, RC2 for carbon black and CO₂, and RC1 for metals and glass. The carbon line is the one that matters: its RC3 step is already a placeholder on the roster, carries most of the catalog value, and is the deferrable load.

The catalog session owns product definitions and yields; the mapping to frame IDs is the Doc Portal's under D-FME-01. This section is the flag, not the ruling.

12. Product table: OmniCrude™ streams as floors, RevCon™ products in process order

The Circular Materials Catalog (RevCon™ RC1 to RC5): 54 manufactured materials at baseline (RC1–RC3), up to 103 with additional refining equipment (RC4–RC5), laid out with the OmniCrude™ streams as floors and refinement running left to right in process order; within a cell the products are the chain for that stream and tier. Colour is the stage at which this design delivers the product (Module file sections 23 and 24): Stage 1, the Day-1 Module, the ruled slate of 8; Stage 2, the Phase 2 graphitiser and carbon classification, 4; Stage 3, the four-Module facility with its shared finishing hall, 38; Stage 5, RC4 lines on the finishing hall, 34; Stage 6, RC5 lines in a cleanroom-class bay, 17; grey, 2 never delivered: the mixed gas and pure CO that are the Module's fuel. Hover a tile for the catalog basis and precursor. Tiers and chains are the catalog's; the stage flags are this package's, for the catalog session to confirm.

OmniCrude™ streamRC1 Circular Raw MaterialRC2 Functional ConversionRC3 Optimized Circular MaterialsRC4 Specialized Circular MaterialRC5 Premium Circular Product
OmniCrude™ Vapor
pristine carbon from the CRSRU (carbon black and the graphite line)
CRB-002Carbon Black
CRB-005Standard Graphite
CRB-006Conductive Carbon
CRB-007High-Grade Carbon Black
CRB-008High-Purity Graphite
CRB-009Carbon Fiber Precursor
CRB-010Graphene Oxide
CRB-011Multi-Walled CNTs
CRB-012Synthetic Graphite
CRB-018Spheroidized Graphite
CRB-021Mesoporous Templated Carbon
CRB-013Reduced Graphene Oxide
CRB-014Multi-Layer Graphene
CRB-015Single-Layer Graphene
CRB-016Single-Walled CNTs
CRB-017Fullerenes (C60/C70)
OmniCrude™ Gas (syngas)
CO₂ at the fuel-cell anode outlet; CO and the mixed gas are internal fuel
GAS-001Mixed Gas
GAS-003Carbon Dioxide, Industrial
GAS-006High-Purity Nitrogen
GAS-007High-Purity Oxygen
GAS-016Pure Carbon Monoxide
GAS-017Beverage-Grade CO₂
OmniCrude™ Solids (bed char)
char and its activation line
CRB-001Raw Carbon Char
CRB-003Activated Carbon
CRB-004Biochar
CRB-019Hard Carbon (Na-ion)
CRB-020Nanoporous Activated Carbon
OmniCrude™ Mineral Phase
minerals, glass, ash-derived REE and heavy metals
GLS-001Mixed Glass Cullet
GLS-002Glass Powder
MIN-001Mineral Aggregate
GLS-003Color-Sorted Cullet
GLS-004Glass Aggregate
MIN-002Pozzolanic SCM Powder
GLS-005Recycled Container Glass
GLS-006Glass Beads
GLS-007Foam Glass
GLS-012Foam Glass Cellular Block
MIN-003Geopolymer Precursor
MIN-004Precipitated Calcium Carbonate
GLS-008High-Quality Cullet
GLS-009Specialty Glass Powder
GLS-011Photocatalytic Silica-TiO₂
MIN-005Specialty Mineral Filler
MTL-016Cerium (REE)
MTL-017Lanthanum (REE)
MTL-018Neodymium (REE)
MTL-019Yttrium (REE)
MTL-020Praseodymium (REE)
MTL-021Gadolinium (REE)
MTL-028Mercury
MTL-029Cadmium
MTL-030Arsenic
MTL-031Antimony
MTL-032Boron
MTL-051Lead, Battery-Grade
GLS-010Ultra-Pure Silica
MIN-006Low-Activation Aggregate
Recovered metals (PRE-SEP)
ferrous and non-ferrous from Pregenesis™ separation; refined metals through the hydromet frame
MTL-001Iron / Steel
MTL-002Mixed Non-Ferrous
MTL-003Aluminum
MTL-004Copper
MTL-005Zinc
MTL-006Lead
MTL-007Nickel
MTL-008Tin
MTL-009Manganese
MTL-045Black Mass Concentrate
MTL-010Chromium
MTL-012Silver
MTL-013Gold
MTL-014Platinum
MTL-015Palladium
MTL-033Cobalt
MTL-050Iron Oxide Pigments
MTL-044Lithium Carbonate
MTL-046Cobalt Sulfate
MTL-047Nickel Sulfate
MTL-048Lithium Hydroxide
MTL-040Tungsten, Ultra-Pure
MTL-041Bismuth, Ultra-Pure
MTL-042Gallium, Semiconductor
MTL-043Indium, Semiconductor
Water
fuel-cell water and product water
WTR-001Treated Wastewater
WTR-002Gray Water
WTR-003Filtered Water
WTR-004Softened Water
WTR-005Distilled Water
WTR-006Purified Water (USP)
WTR-FC-001FC Water — Industrial DI
WTR-007Deionized Water
WTR-008Semiconductor Grade Water
WTR-FC-002FC Water — Semiconductor
WTR-009Pharmaceutical Grade Water
WTR-010Ultra-Pure Water
WTR-FC-003FC Water — Ultra-Pure
Air (ASU, not from feedstock)
air-separation products; an ASU frame is part of the RC3 finishing set
GAS-004Nitrogen, Industrial
GAS-005Oxygen, Industrial
GAS-008Argon
GAS-010Specialty Gas Mixtures
GAS-011Neon
GAS-013Ultra-High Purity Nitrogen
GAS-014Xenon
GAS-015Krypton

13. Roster, buildings and layout

13.1 Frames per Module, consolidated roster

ProtocolFramesContents
Pregenesis™7PRE-RCV, PRE-SHR, PRE-SEP (ferrous + eddy-current), PRE-DRY × 2, PRE-ADX, PRE-SIL dried-feed buffer (frame-or-silo OPEN)
Regenesis™9 (locked roster, amended 13 → 9)REG-FDS shared; per Line: REG-MCR × 2, REG-CRS hot frame (PCY, booster, CRSRU, two torches, chopper, N₂ loop), REG-QBR recovery frame (quench boiler, topping turbine, HRSG, candle filter)
Regenesis MAX™3 + finishingMAX-GAS A and B (acid-gas sorbent, CO₂ liquefaction by absorption), MAX-CSP solids; MAX-ACT and MAX-GRA placeholders; RC3 finishing adds 6 to 9 (graphitiser, activation, classification, hydromet × 3, glass sort, ASU, water polish)
Energy and utilities15 to 21PWR-FCM × 12 to 15, PWR-HRS (HRSG, turbine, absorption chiller, thermal store), PWR-ACC, PWR-BES, NXS-ELC (with the batch scheduler), NXS-THM (cascaded loops), UTL (APS, water treatment with the separator, N₂)
ISO tanks and bulk units4 MEGC at grade; 5 to 13 CO₂ T50 tiered; 1 N₂ T75; 2 water T11 and 2 condensate/DI T11 tiered; 3 to 4 solids bulk unitscertified units, swapped as units; tiered two-high on ISO 1161 corners

13.2 The three halls

HallContentsSizeHeight
1 Receiving + Pregenesis™drive-through receiving lane with doors on both long walls, 20 × 20 m feedstock receiving bay, PRE-RCV, two rows of Pregenesis frames; Hall 1 sump for the separator75 × 40 m7 m eave
2 Main: Regenesis™ + MAXFDS at the head; Lines A and B mirrored about the spine; MAX bays; frame-swap gable doors; H₂ detection and relief at the ridge75 × 50 m15 m ridge
3 PowerBlockfuel-cell frames in two rows, HRSG, switch frame, BESS, thermal, utilities; coolers outside the south wall50 × 40 m7 m eave
Gaps and crossings10 m fire gaps; the dried-feed bridge (Z4) across gap 1; the syngas header, 1,500 VDC bus and steam lines across gap 2; NEXUS spine on one rack line through all three——
Tank padoutside the PowerBlock gable, 18 × 50 m, tanks tiered two-high, H₂ MEGC at grade in a separation zone (distances OPEN)——

Drawings: frames, flows and balances v5 — lucid.app/lucidchart/eafcad99…; plot plan v6 — lucid.app/lucidchart/f4b0bfee…. Interfaces: the 20-family common set (8 NEW), standardised controllers on 48 VDC, every connection frame-to-frame or overhead, the feed bridge as a site-level Z4 item, a facility Z3 H₂ header at York.

14. Open items

ItemOwner
Decision records for the 2026-11-02 form answers and the 2026-11-03 rulings: D-65-C, Q2 amendments (carbon route, aromatics), D-REG-SCOPE-02, PowerBlock re-basing, D-ACM-EMS-01 turndown envelope with the equal-dispatch and batch-load linesDoc Portal
RC3 finishing frames under D-FME-01; MAX-GRA as a continuous vertical induction graphitiser with a hold stateDoc Portal
Catalog product-ID and tier mapping of the Module's streams, the tier of liquid industrial CO₂, and the removal of the aromatics from the dissociation-basis slate (done at Release 126)catalog session; Corpus Zone
R1 frame envelope limits (the two merged frames at the assumed 30 t)Doc Portal / ASI
Hydrogen separation distances; MEGC tiering; fire-code review of hydrogen and SOFC fuel cells under membrane roofssite and code review
Closing the −1 MW on the design point with full RC3 finishing: 65-percent fuel cells or a calorific floor on the feedArchitect
Instrument and process air with the APS sizing; D-48V-01 controls bus; feed buffer frame-or-silo; hot FAT bay at the ASI; CO₂ off-take at YorkDoc Portal / site
Simulator: CRSRU zone, moisture and EAF sweep (no severity dimension); hydrogen as plasma gas and A2 as Gen 2 test targets, electrode erosion in H₂ plasma to measuresimulator; Gen 2 programme