100 TPD Module — Operating Envelope
CRSRU heat-source sub-session · 2026-11-03 · for Allen Witters, Lead Systems Architect · consolidated envelope of the Module file §1–20, rolled up 2026-11-03; light mode; diagrams, charts and the product table added · Design Zero: working design, unlocked; the Architect locks it when the time is right · provenance [RULED] [COMPUTED] [INFERRED] [OPEN]
| Document Number | CBT-MOD-ENV-001 |
| Design | Design Zero · 100 TPD Module |
| Document Status | DESIGN ZERO — WORKING DESIGN, UNLOCKED |
| Owner | Carbotura Inc. — Engineering; Allen Witters, Lead Systems Architect |
| Classification | ISC-2 Confidential |
| Authority | CBT-TB-PORTAL-014 (Architect, 2026-11-04) |
| Source of record | CRSRU_HEAT_SOURCE_DESIGN/OPERATING_ENVELOPE.html on main; Plotly 2.27.0 self-hosted at assets/js/vendor/ |
| Product data | catalog session products.json (the 116-entry file less the 13 aromatics entries retired at Release 126: 103 products; tier and chain carried verbatim) |
- 1. Rulings in force
- 2. The Module in one table
- 3. Evolution in stages
- 4. Flow diagrams: materials, energy and each utility
- 5. Throughput
- 6. Average applied power by tonnage, MW at the 1,500 VDC bus
- 7. Utilities
- 8. The 6 to 10 MW of rejected heat — a cascade, not a cooler
- 9. Batchable loads and parasitic energy
- 10. Excess hydrogen: how much, and what to do with it
- 11. Downstream to RC3 — not included; what it would add
- 12. Product table: OmniCrude™ streams as floors, RevCon™ products in process order
- 13. Roster, buildings and layout
- 14. Open items
Consolidated operating envelope of the 100 TPD Module, rolled up from the CRSRU heat-source sub-session on the Architect's direction of 2026-11-03. Per Module: two Lines dispatched equally, four Recyclotron™ reactors, SOFC PowerBlock on syngas, no grid, closed loop. The carbon route W1 is the design point; the mixed and hydrogen-maximum columns are the swept and emergency settings. Everything scales with throughput except the floors and the fuel-cell cap. Source of record: MODULE_100TPD_DEFINITION.md.
1. Rulings in force
Architect rulings and directions carried in this envelope, in order. This is Design Zero: everything is unlocked, including the earlier locked records these rulings replace, until the Architect locks it. The Module file carries each ruling where it is applied.
| Date | Ruling or direction | Applied in |
|---|---|---|
| 2026-11-02 | SOFC fuel cells on cleaned syngas, 16 to 22 MW per Module (target plus swing); shift, CO₂-removal and PSA trains deleted; CO₂ captured at the anode outlet, no afterburner (decision form Q1) | power tables; CO₂ product; PWR-FCM |
| 2026-11-02 | Regenesis™ consolidated 13 → 9 frames: per-Line hot frame and recovery frame (Q3, amends D-REG-SCOPE-02); whole roster combined to cut frame count | roster |
| 2026-11-02 | DC torch, N₂ closed loop, 1,500 VDC long-arc for the first Modules; vapour-through-head microwave A2 as Gen 2 test (Q4, D-65-C) | CRSRU loads |
| 2026-11-02 | No grid, ever; no solar at York (19 acres); everything frame-contained; black-start H₂ supplied; supercritical CO₂ cycles dropped, steam cycle only | power tables; balances |
| 2026-11-02 | 50 percent posture: 100 TPD is half of 200 TPD capability; run like a data centre, follow loads | throughput; modulation |
| 2026-11-02 | FAT and insurability per frame; 20-family common interface set; standardised controllers; every connection frame-to-frame or overhead | roster; interfaces |
| 2026-11-02 | Everything in sprung halls, drive-through receiving; receiving + Pregenesis™, main (Regenesis™ + MAX), PowerBlock as three halls; ISO tanks tiered two-high | buildings and layout |
| 2026-11-03 | Carbon route W1 is the design point; hydrogen-maximum is the energy-emergency setting only (Q2 amended) | every table's design column |
| 2026-11-03 | No hot standby; the 50 percent capacity overhead is the failover | failover; heat cascade |
| 2026-11-03 | Vocabulary: the Module is a closed-loop system; the former fuel-cell and tank-handling term is retired in every sense; fuel cells, PWR-FCM, tiered tanks | whole package |
| 2026-11-03 | Both Lines dispatched equally unless failover or surge; never a Line idled while the other runs | throughput floor 30 TPD; control law |
| 2026-11-03 | Aromatics dropped from the Module's product scope; full dissociation at every setting; trace condensate returns to feed | RC3 table; separator |
| 2026-11-03 | Day-1 product slate ruled: eight products from the rostered frames, metals and glass as concentrates; the graphitiser is Phase 2 as the deferrable load; the other RC3 finishing frames out of Module scope until a four-Module facility and a qualifying feed | product table; Module file section 22 |
| 2026-11-03 | Excess hydrogen to RC3 finishing as the deferrable load; 4 MEGC (4 h buffer); fuel cells derated on the headroom; black-start reserve self-replenished; H₂ as Recyclotron™ carrier now, as CRSRU plasma gas a Gen 2 test | hydrogen section; roster |
2. The Module in one table
| Item | Value |
|---|---|
| Fresh feed | 100 TPD as received, mineral included: 23.7 % moisture, 10.2 % mineral, 66.1 % organic; dried to 5 % in Pregenesis™ |
| Lines | 2 × 50 TPD sustained, both duty, each rated for 100 TPD; dispatched equally; failover from the 2× headroom, no standby units |
| Recyclotrons™ | 4, all duty, 25 TPD at 300 kW on the design point; 50 TPD at 600 kW capability; 1.2 MW uprate ceiling |
| Operating setting | carbon route W1 design point: feed dried to 5 %, no bed steam, carbon product retained; hydrogen-maximum held as the emergency setting; aromatics out of scope |
| Products per day at 100 TPD | carbon black 8.9 t (pristine, vapour-derived) and bed char 9.4 t; Mineral Phase 10.2 t; liquid CO₂ 51 to 71 t; product water 20 to 75 t surplus; hydrogen 7.8 to 8.9 t made and consumed as internal fuel, never a product |
| Power | SOFC fuel cells 16 to 22 MW installed (PWR-FCM, 12 to 15 frames), quench topping turbines and an SOFC steam cycle; 1,500 VDC zone bus, 800 VDC device links, DC-native; no grid; BESS 5 MWh / 2 MW; H₂ buffer 4 MEGC, 4 h |
| Balance at 100 TPD | −0.5 MW on the design point, +0.3 MW with the heat cascade, about −1 MW with full RC3 finishing (closed by 65 % fuel cells or a calorific floor on the feed) |
| Buildings | three sprung halls in line with 10 m fire gaps: receiving + Pregenesis™ 75 × 40 m, main 75 × 50 m (15 m ridge), PowerBlock 50 × 40 m; coolers and the tiered tank pad outside; 1.64 ha per Module, four at York about 4.8 ha of 7.7 |
| Frames | 36 to 46 per Module on the consolidated roster; 42 to 55 with RC3 finishing |
| Near-zero | CO₂ captured and liquefied; nothing oxidised outside the fuel cells; the separator, the condensate and the cold-gas trace all return to the process; the only bulk stream leaving the fence is liquid CO₂ to off-take |
3. Evolution in stages
One design read at four points in time. Each stage is reached by a decision already on the record or named in its last row; nothing in a later stage is assumed by an earlier one.
| Stage 1 — Day-1 Module | Stage 2 — Phase 2, graphitiser | Stage 3 — four-Module facility (York) | Stage 4 — Gen 2 heat source | |
|---|---|---|---|---|
| Trigger | the rulings of 2 and 3 November | the Phase 2 ruling; MAX-GRA sized | the 400 TPD contract at York; a finishing hall shared by four Modules | the Gen 2 tests: H₂ as plasma gas, A2 microwave, 65 % fuel cells |
| Throughput | 100 TPD target, both Lines equal; 120–165 sustained on the swing rating; 200 peak | same | 400 TPD target; 480–660 sustained on the same frames and land | same frames, higher margin |
| Products | 8 carbon black, bed char, industrial CO₂, ferrous, non-ferrous concentrate, aggregate concentrate, SCM powder, industrial DI water | 12 adds standard and high-purity graphite and the classified carbon-black grades | about 50 the RC3 floor less the ash-derived products, through the shared finishing hall | same slate; the RC4 carbon products reachable from the graphite line when a market justifies them |
| Catalog tiers | RC1 and RC2; water at RC3 | adds carbon at RC3 | RC3 floor across five families | — |
| Frames per Module | 36–46 | +1 to 2 (MAX-GRA, classification) | +6 to 9 in the finishing hall, shared: +2 per Module-equivalent | −2 to −3 (N₂ loop, generator and T75 deleted) |
| Added electric load | 0 | +1.1 to 1.9 MW, deferrable | +2 to 3.5 MW per Module-equivalent, batched | −0.3 MW compression; +0.4 MW fuel-cell output |
| Balance on the design point | −0.8 to +0.3 MW | about −1 MW; closed by 65 % fuel cells or the calorific floor | −1.7 to −3.2 MW per Module-equivalent; needs the Stage 4 levers or the calorific floor | about +0.5 to +1 MW |
| Hydrogen | internal fuel; 4 MEGC, 4 h; surplus to the black-start reserve and derated fuel cells | surplus to the graphitisation block, 22:00 to 10:00 | facility Z3 H₂ header pooling four Modules into the finishing hall | H₂ as Recyclotron™ carrier and CRSRU plasma gas; no N₂ loop |
| Heat | cascade items 1 to 7 | plus the graphitiser's recovery to the 40 bar header | shared steam header and thermal store across Modules | — |
| Buildings | three sprung halls per Module, tiered tank pad, 1.64 ha | the graphitiser in Hall 2's MAX bays | four Modules in line, shared fire lanes, one tiered pad, one finishing hall; about 4.8 to 5.5 ha of 7.7 | — |
| Needs ruled | D-65-C, Q2 amendments, D-REG-SCOPE-02, PowerBlock re-basing, D-ACM-EMS-01, product-scope record | MAX-GRA specification under D-FME-01 | finishing-hall frames under D-FME-01; concentrate-to-refined per family; catalog concentrate pricing | D-65-C Gen 2 addendum; fuel-cell specification at 65 % |
Advanced stages: reaching RC4 and RC5
Two facility stages on the shared finishing hall of Stage 3. Neither changes the Module, its balances, its dispatch rule or the hydrogen rule; hydrogen is used in fence as a reductant and a CVD atmosphere and is still never a product. Product IDs, chains and volumes are the catalog's on the 100 TPD basis; the lines, units and loads are this package's estimates (Module file section 24).
| Stage 5 — RC4 Specialized Circular Material | Stage 6 — RC5 Premium Circular Product | |
|---|---|---|
| Trigger | Stage 3 finishing hall running; market pull for the advanced carbon line | Stage 5 lines running; the Gen 2 heat source for the fullerene slipstream; certified QC |
| Products | 34 advanced carbon (spheroidised and synthetic graphite, graphene oxide, carbon-fibre precursor, MWCNT by CVD on the Module's own CO, nanoporous and templated carbons); battery metals; ash-derived REE and heavies; glass and silica; deeper water polish; beverage CO₂, specialty gases, neon; specialty filler | 17 graphene and nanocarbon (rGO by hydrogen reduction, graphene, SWCNT, fullerenes from a CRSRU plasma slipstream); ultra-pure W, Bi, Ga, In; ultra-pure silica; UHP N₂, xenon, krypton; pharmaceutical and ultra-pure water; low-activation aggregate |
| Catalog volume at 100 TPD | 24.2 t/d | 5.8 t/d, most lines in kilograms per day |
| Units added | +8 to 12 in the shared hall | +6 to 8, a cleanroom-class bay and a QC laboratory |
| Added load, Module scale, shared across four | +1.8 to 2.7 MW | +0.9 to 1.1 MW |
| Hydrogen and CO use | CO as the CNT carbon source; hydrogen in CVD atmospheres | hydrogen as the GO reductant; both internal, never a product |
| Feed dependence | battery metals need a battery fraction and a battery pick in the receiving bay; ash REE and heavies need the Enhancement Admix setting; carbon, water, glass and gas lines need none | ultra-pure metals need electronics, LED/LCD and pharma fractions: a facility toll line, not a Module line |
| Never delivered | the mixed gas and pure CO (the Module's fuel) | same |
| Needs ruled | finishing-hall partition under D-FME-01; the battery pick as a safety specification; the admix setting; catalog tiers and yields confirmed | a market pull per RC5 line before its unit is bought; Gen 2 slipstream test; certification path |
4. Flow diagrams: materials, energy and each utility
Sankey diagrams of the design point, carbon route at 100 TPD, both Lines equal, with the heat cascade. The first combines everything on an energy basis; the rest are one stream each in its own unit. Widths are to scale within each diagram; hover a link for its value.
Overall, energy basis: everything on one diagram, MW (LHV for chemical energy), carbon route at 100 TPD with the heat cascade
How to read it. Mass streams are drawn at their chemical energy (lower heating value), so the feed enters at 19.4 MW, the carbon products leave at 6.9 MW and the syngas carries 13.2 MW to the fuel cells; CO₂, water and the Mineral Phase carry no chemical energy and do not appear. The bus is drawn twice to keep the diagram acyclic: the loads it feeds on the left (9.8 MW) and the generation it collects on the right (10.15 MW) are the same bus; the difference is the 0.35 MW margin. Electricity that goes into the reactors and the torches is stored in the syngas as chemical energy by the endothermic dissociation, which is why the syngas carries more than the feed's share. The heat pool collects every rejected stream (fuel-cell heat 5.0, CRSRU and torch cooling 6.6, magnetron, drive and dryer-vapour heat 2.95) and returns 1.1 MW as process heat and 1.95 MW as electricity through the steam cycle, the topping turbines and the cascade; 11.3 MW is rejected to air. Reconciliation finding: closing this diagram needs 19.4 MW of feed chemical energy, which is 25 MJ/kg on the 66.1 t/d of dry, ash-free organics; typical reference feed is 20 to 23 MJ/kg. At 22 MJ/kg the syngas to the fuel cells would be about 11 MW and the electric output about 6.8 MW, widening the design-point deficit by about 1.4 MW. That is the calorific floor on the feed of the Module file, now in numbers, and it is carried as section 21 there.
Materials, per Module per day, carbon route at 100 TPD (t/d)
Dried feed includes the 10.2 t of mineral that passes through the reactors to the Mineral Phase and 10 to 20 t/d of recycled admix, internal; the 74 t of oxygen is drawn from cathode air and leaves bound in the CO₂ and water. Class 4; element basis.
Electricity at the 1,500 VDC bus, carbon route at 100 TPD with the heat cascade (MW)
Heat, per Module at 100 TPD: where 6 to 10 MW of rejected heat goes after the cascade (MW, midpoints)
Steam, per Module at 100 TPD (t/h, 40 bar / 400 °C header)
Water, per Module per day at 100 TPD (t/d): the Module is a net producer
Nitrogen, per Module (Nm³/h): a closed loop with a small make-up
Carbon dioxide, per Module per day at 100 TPD (t/d): captured at the anode outlet, liquefied on recovered heat
Hydrogen, per Module at 100 TPD (kg/h): internal fuel, never a product
Steam, water and nitrogen figures are Class 4 midpoints consistent with the tables; the N₂ loop, the hydrogen carrier and the thermal store are circulations drawn at their make-up or draw, not their inventory.
5. Throughput
| Level | Module | Line | Recyclotron™ | Set by |
|---|---|---|---|---|
| Floor | 30 TPD (both Lines at their floor; equal dispatch) | ~15 TPD, about 15 % of capability | 6 to 8 TPD | torch pilot arc and N₂ loop minimum |
| Target, sustained | 100 TPD | 50 | 25 at 300 kW (carbon) to ~700 kW (H₂-max) | D-LINE-02, the 50-percent posture |
| Sustained ceiling, fuel cells 16–22 MW | 120–165 H₂-max · 140–190 mixed · 165–200 carbon | half | 30 to 50 | fuel-cell capacity |
| Peak, 1–2 h on BESS + H₂ buffer | 200 TPD (H₂-max ~170, reactor uprate ceiling) | 100 | 50 at 600 kW | frame ratings, reactor power cap |
| One Line out | 100 TPD on the other Line's 2× rating, refractory-life limited | 100 | 50 | failover, §5 |
6. Average applied power by tonnage, MW at the 1,500 VDC bus
Line dispatch: equal. Both Lines run at the same setpoint at all times; the split departs from equal only in failover (one Line carries the Module on its 2× rating) and never by idling a Line. In surge both Lines rise together (Architect, 2026-11-03).
Design point: carbon route W1 (Architect, 2026-11-03). Mixed and hydrogen-maximum columns are the swept and the energy-emergency settings.
Load = 0.8 MW fixed + variable per tonne. Generation = SOFC electric (capped at the 22 MW target-plus-swing installation) + topping turbines + SOFC steam cycle. With cascade adds the heat-cascade credit of section 8. Grey italics: above the Recyclotron™ uprate ceiling for that setting.
| TPD | Carbon route W1 | Mixed (midpoint) | Hydrogen-maximum | Heat rejected before cascade, MW | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| load | gen | balance | with cascade | load | gen | balance | with cascade | load | gen | balance | with cascade | ||
| 30 floor | 3.5 | 2.8 | -0.7 | -0.5 | 4.0 | 3.4 | -0.6 | -0.3 | 4.6 | 4.1 | -0.5 | -0.1 | 1.8 – 3.0 |
| 25 | 3.0 | 2.3 | -0.7 | -0.5 | 3.5 | 2.9 | -0.6 | -0.3 | 3.9 | 3.4 | -0.5 | -0.2 | 1.5 – 2.5 |
| 50 | 5.3 | 4.7 | -0.6 | -0.2 | 6.1 | 5.7 | -0.4 | +0.1 | 7.0 | 6.8 | -0.3 | +0.4 | 3.0 – 5.0 |
| 75 | 7.5 | 7.0 | -0.5 | +0.1 | 8.8 | 8.6 | -0.3 | +0.5 | 10.2 | 10.1 | -0.1 | +1.0 | 4.5 – 7.5 |
| 100 | 9.8 | 9.4 | -0.4 | +0.4 | 11.5 | 11.4 | -0.1 | +1.0 | 13.3 | 13.5 | +0.2 | +1.6 | 6.0 – 10.0 |
| 125 | 12.1 | 11.7 | -0.4 | +0.6 | 14.2 | 14.2 | +0.1 | +1.4 | 16.4 | 16.9 | +0.4 | +2.2 | 7.5 – 12.5 |
| 150 | 14.3 | 14.0 | -0.3 | +0.9 | 16.9 | 17.1 | +0.2 | +1.9 | 19.6 | 20.2 | +0.7 | +2.8 | 9.0 – 15.0 |
| 175 | 16.6 | 16.4 | -0.2 | +1.2 | 19.5 | 19.9 | +0.4 | +2.4 | 22.7 | 23.6 | +0.9 | +3.4 | 10.5 – 17.5 |
| 200 | 18.8 | 18.7 | -0.1 | +1.5 | 22.2 | 22.8 | +0.6 | +2.8 | 25.8 | 25.2 | -0.6 | +2.0 | 12.0 – 20.0 |
Load at the bus by throughput (MW)
Balance with the heat cascade by throughput (MW)
Stores: BESS 2 × 2.5 MWh / 2 × 1 MW · H₂ buffer 4 MEGC, 2 to 3.2 t, 4 h of fuel for the fuel cells plus one black start (adopted 2026-11-03) · bus floor with both Lines at their floor (30 TPD) about 3.5 to 4.5 MW · fuel-cell frames modular, no practical minimum.
7. Utilities
| Utility | At 100 TPD | At 200 TPD peak | Form and note |
|---|---|---|---|
| Heat rejected to air | 6 to 10 MW (4.5 to 7.5 after the cascade) | 12 to 20 MW | cascaded NXS-Z2 loop 95 → 60 → 40 °C, air-cooled condenser; no cooling towers, no water consumed |
| Steam | 40 bar / 400 °C from two quench boilers and the SOFC HRSG; process draw 25 to 50 t/d at 3 bar | 50 to 100 t/d | drying 0.7 MW th, bed steam 0.5 to 1.5 MW (swept), preheats 0.4 MW |
| Water | net producer: 70 to 125 t/d made in the fuel cells, 25 to 50 t/d to steam, 20 to 75 t/d surplus | 140 to 250 t/d made | no raw-water intake at steady state; DI make-up for the closed loops only; UTL-WTR 125 t/d |
| N₂ | loop 1,500 Nm³/h circulating (700 to 3,800 across the enthalpy sensitivity); make-up 80 to 150 Nm³/h, 2 to 4 t/d | loop 3,000 Nm³/h; make-up 4 to 8 t/d | membrane generator 100 to 200 Nm³/h, liquid T75 backup |
| CO₂ out | 51 to 140 t/d liquid, −20 °C / 20 bar | 100 to 280 t/d | liquefaction by absorption refrigeration on recovered heat (cascade item 1); 2 days in four tiered T50 pairs |
| Hydrogen | 7.8 to 14 t/d made and consumed internally | 16 to 28 t/d | never a product; buffer 1 h |
| Solids out | carbon 0 to 18 t/d; mineral 10.2 t/d plus admix purge; acid-gas sorbent ~1 t/d | double | 2-day buffers in 20 ft bulk units |
| Admix recycle | 10 to 20 t/d internal | 20 to 40 | bottom solids or WTE-derived Enhancement Admix, 0 to 25 % |
| Oily water | dryer condensate 19 t/d with 50 to 300 kg/d of fats, oils and light hydrocarbons; receiving-floor leachate 1 to 3 m³/d | double | coalescing-plate separator and flotation inside UTL-WTR with a Hall 1 sump; the oil and float go back to PRE-ADX as feed, the water to the polish; nothing leaves the fence (Module file section 19) |
| Instrument and process air, APS | not sized | OPEN with the APS sizing | |
| Controls | 48 VDC bus, redundant controllers | D-48V-01 pending |
8. The 6 to 10 MW of rejected heat — a cascade, not a cooler
The high-grade heat is already taken (process heat first, then the steam cycle, §12). What is still rejected is medium and low grade. On a no-grid Module the smart use is the one that displaces an electric load the Module already carries: a megawatt of load displaced is worth more than a megawatt of heat recovered.
8.1 Where it is, per Module at 100 TPD
| Stream | Grade | MW | Today |
|---|---|---|---|
| SOFC cathode air after recuperator and HRSG | 150 to 250 °C | 1 to 1.5 | cathode air outlet, recuperated |
| SOFC fuel cell coolant and enclosure loop (NXS-Z2) | 85 to 95 °C | 3 to 5 | dry coolers |
| Steam-cycle condenser | 50 to 60 °C | 3 to 3.5 | air-cooled condenser |
| Torch and power-electronics cooling | 35 to 50 °C | 1.5 to 2.6 | dry coolers |
8.2 The cascade, ranked by electric value
| # | Use | Heat taken | Grade needed | Electric displaced or made, per 100 TPD | Why it is not tradition |
|---|---|---|---|---|---|
| 1 | Absorption refrigeration for CO₂ liquefaction (ammonia–water, −25 °C evaporator) and BESS / power-electronics cooling | 1.2 to 2.8 MW | 90 to 150 °C | 0.3 to 0.7 MW, the whole liquefaction compressor load | turns the largest electric utility load into a heat load; the CO₂ product becomes free to liquefy |
| 2 | N₂ torch-gas, admix and dried-feed preheat to 300–500 °C from the cathode tail | 0.3 to 0.5 MW | 150 to 500 °C | 0.15 to 0.3 MW of torch electric | every joule put into the plasma gas thermally is a joule the torch does not make |
| 3 | Anode outlet as Recyclotron™ bed gas: 850 °C CO₂ + H₂O into the bed, C + CO₂ → 2 CO and C + H₂O → CO + H₂ (chemistry lever for the simulator sweep) | up to 2 MW plus the reactants | 800 to 900 °C | moves energy from the magnetrons to the fuel-cell outlet; shifts the split toward hydrogen | uses the heat and the CO₂ chemically inside the fence; consumes carbon, so a setting, not a default |
| 4 | Organic Rankine cycle on what is left of the 85–95 °C loop | 2 to 3 MW | 85 to 95 °C | 0.2 to 0.3 MW | the traditional item, last in the cascade not first |
| 5 | Thermal storage, hot-water or packed-bed, 90–400 °C, 10–20 MWh, between HRSG and turbine | buffers | — | makes the steam cycle's 1.2–1.5 MW dispatchable against the H₂ inventory | the data-centre posture needs a dispatchable source; this is the cheapest one on site |
| 6 | Feed pre-conditioning: condenser warm air through the 24 h feed buffer and under the receiving-bay slab | 0.2 to 0.3 MW | 50 to 60 °C | 0.1 MW off the dryers; frost-free receiving bay | the lowest grade finds its only sink in the feed |
| 7 | Sprung-hall heating in winter, unit heaters on the 85 °C loop | 0.5 to 1 MW seasonal | 85 °C | no electric heating of three halls | the halls are the heat sink the building decision created |
8.3 What the cascade does
| Carbon route | Mixed | Hydrogen-maximum | |
|---|---|---|---|
| Electric displaced or made, per 100 TPD | 0.8 MW | 1.1 MW | 1.4 MW |
| Balance, §12.5 | −0.5 MW | ≈ 0 | +0.3 MW |
| Balance with the cascade | +0.3 MW | +1.1 MW | +1.7 MW |
| Heat still rejected | 4.5 MW | 6 MW | 7.5 MW, at lower grade |
Roster: PWR-HRS gains the absorption chiller and the thermal store; MAX-CO2 loses its compressor; NXS-Z2 becomes a cascaded loop. Item 3 is a simulator setting (decision form Q2), not adopted. Hall heating is a specification line for the three halls. No hot standby (Architect, 2026-11-03): every frame runs at 50 percent of capability and the headroom is the failover; nothing is held warm and idle.
9. Batchable loads and parasitic energy
About a third of the electric load can be moved within the day, which is the modulation lever that matters. The parasitic heat pool is 1.4 to 2.5 MW more than section 8 counts, but it is low grade and worth a few hundred kilowatts, not megawatts. Per Module at 100 TPD, carbon route.
9.1 Deferrable loads, ranked by swing
| # | Load | Average MW | Buffer that lets it batch | Window | Swing |
|---|---|---|---|---|---|
| 1 | Graphitisation of the pristine carbon | 1.1 to 1.9 | product keeps; 2-day carbon buffer | hours to days | sized 2×, run half the hours: up to 3.8 MW |
| 2 | Shredder and hammermill, a 16-hour duty at 200 TPD capability | 0.3 to 0.5 | 24 h dried-feed buffer plus the receiving bay | hours | 0.6 to 1.0 MW |
| 3 | Hydromet metals finishing | 0.3 to 0.5 | 2-day Mineral Phase buffer; liquor tanks | days | whole load |
| 4 | CO₂ liquefaction, where it stays electric | 0.3 to 0.7 | low-pressure gas holder, 1 to 2 h; with absorption refrigeration it batches against the thermal store | 1 to 2 h | 0.3 to 0.7 MW |
| 5 | H₂ buffer compression to 250 bar (buffer flow only) | 0.15 to 0.3 | the buffer itself | hours | whole load; the natural sink when H₂ inventory is high |
| 6 | Admix pulveriser (VRM) | 0.15 to 0.25 | 2-day admix buffer | days | whole load |
| 7 | N₂ generator | 0.1 to 0.2 | liquid T75 and loop receiver | hours | whole load |
| 8 | Carbon activation, classification, pelletising | 0.1 to 0.2 | 2-day solids buffers | days | whole load |
| 9 | Water treatment and DI polishing | 0.05 to 0.1 | T11 tanks, 1 day | hours | whole load |
| 10 | Dry-cooler and condenser fans | 0.2 to 0.4 | none; ambient sets the duty, so the condenser gives more at night | continuous | ±0.1 MW; argues for night batching |
| Deferrable within the day | 2.7 to 4.9 MW of 9.8 | 25 to 40 % of load, hours-scale (13 to 25 % before RC3 finishing is rostered) |
9.2 Modulation hierarchy
| Timescale | What moves | Range | Signal |
|---|---|---|---|
| Seconds | BESS (2 MW, 5 MWh); fan speeds | ±2 MW | bus voltage, HVIL |
| Minutes | Recyclotron throughput and the torches that follow the vapour (24:1 reactor envelope, Line floor 15 %) | 5 to 7 MW | H₂ inventory first, feed inventory second |
| Minutes to an hour | SOFC fuel cells, 2 to 5 % per minute thermally; steam cycle via the thermal store | 3 to 5 MW | H₂ inventory |
| Hours | the deferrable loads above | 2.7 to 4.9 MW | day-ahead schedule against H₂, feed and ambient |
| Days | feed 24 h, admix, solids and CO₂ 2 days | throughput ±20 % across the week | feedstock arrivals |
9.3 Parasitic energy not yet in the ledger
| Source | Grade | MW | Worth | Harvest |
|---|---|---|---|---|
| Magnetron anode cooling, Gen 1 at 60 to 70 % efficiency, 4 reactors | 50 to 70 °C | 0.4 to 1.0 | feed pre-conditioning, hall heat; too cool for the chiller unless the return runs at 80 °C at the cost of magnetron life | one loop with the torch cooling → feed-buffer warm air, receiving-bay slab |
| Dryer vapour latent heat, 19 t/d of water evaporated | 100 °C condensing | 0.5 | the one parasitic stream warm enough for the absorption chiller | condensing coil on the dryer off-gas into the 85 to 95 °C loop; MVR does not pay on a steam-rich Module |
| DC-DC converters, drives, BESS round trip | 40 to 60 °C | 0.2 to 0.5 | low | liquid-cooled electronics on the same loop |
| Reflected microwave power, EAF 0.10 to 0.15 | 60 °C | 0.1 to 0.3 | best harvested by not making it | reflected-power tuning loop first |
| Hot solids: char and Mineral Phase at 600 °C, carbon black at 250 °C | 250 to 600 °C | 0.15 | small but high grade | screw cooler on the bottom-solids outlet → admix or N₂ preheat |
| H₂ buffer let-down expander; thermoelectrics on hot shells | — | 0.02 to 0.05 each | not worth a frame | leave |
| Total new to the ledger | 40 to 100 °C | 1.4 to 2.5 MW heat | 0.15 to 0.3 MW electric-equivalent |
The largest parasitic item is not a heat stream: it is the reflected microwave power and the water in the feed, which the Recyclotron parasitic ledger shows taking most of the microwave energy on as-received feed. Drying to 5 % and dosing admix by the reflected-power loop are worth more than every harvest in this table.
10. Excess hydrogen: how much, and what to do with it
Hydrogen is Island-Mode internal fuel, never a product. 1 t of H₂ is 33.3 MWh LHV, about 20.6 MWh electric through the fuel cells; a 1 MW surplus for a day is about 1.2 t of H₂ not needed.
10.1 Table of excesses, per Module
| Setting, 100 TPD | H₂ made | Electric balance | H₂ surplus / deficit | Share |
|---|---|---|---|---|
| Carbon route, design point, no cascade | 7.8–8.9 t/d | −0.5 MW | −0.6 t/d | −7 % |
| Carbon route, with the heat cascade | 7.8–8.9 t/d | +0.3 MW | +0.35 t/d | +4 % |
| Carbon route, cascade, RC3 finishing on | 7.8–8.9 t/d | about −1 MW | −1.2 t/d | −14 % |
| Mixed, cascade | ~11 t/d | +1.1 MW | +1.3 t/d | +12 % |
| Mixed, cascade, RC3 finishing on | ~11 t/d | ≈ 0 | ≈ 0 | — |
| Hydrogen-maximum (emergency), cascade | ~14 t/d | +1.7 MW | +2.0 t/d | +14 % |
| 200 TPD surge, carbon route, cascade | 15.6–17.8 t/d | +1.5 MW | +1.8 t/d | +11 %, 1–2 h |
10.2 Matrix of uses, ranked
| # | Use | H₂ it takes | Yields | In fence, no oxidation, not a product | Verdict |
|---|---|---|---|---|---|
| 1 | Refining depth: electricity for the RC3 finishing loads as the batch loads | the surplus and more | 1 t of surplus H₂ graphitises 4 to 7 t of pristine carbon to RC3 graphite, feeding the RC4 carbon products | yes | first call |
| 2 | Replenish the black-start reserve from the Module's own H₂ | 0.6 t once, top-ups | no external energy supply after commissioning | yes | do it; the first 0.6 t of any surplus |
| 3 | Derate the fuel cells: more frames at lower current density | 0.2–0.4 t/d | 62 → 64–65 % efficiency and longer frame life | yes | do it on the headroom |
| 4 | Extend the buffer to 4 h, two more tiered MEGC | 0.15–0.3 MW compression | deeper load-following, surge beyond the BESS, black start without the reserve | yes | do it; enables item 1 |
| 5 | H₂ as the Recyclotron bed carrier and sweep gas instead of N₂ | circulates | less tar, less N₂ make-up, cleaner vapour to the CRSRU | yes | adopt; a circulation, not a sink |
| 6 | H₂ as the CRSRU plasma gas instead of the N₂ loop (Gen 2) | circulates, joins the syngas | deletes the N₂ loop, the 27 % inert fraction, the N₂ generator and T75; electrode erosion in H₂ plasma is the risk | yes | Gen 2 test target alongside A2; does not reopen D-65-C |
| 7 | Direct H₂ reduction of Mineral Phase oxides as the front end of the MTL line | 0.1–0.3 t/d | metal from oxide in fence, water the only by-product; lifts MTL toward RC3 with less reagent | yes | a line in the hydromet frame |
| 8 | Raise throughput | all of it | about +3 TPD per 0.35 t/d; every tonne brings its own load | yes | not a use; the ratio is fixed |
| 9 | Catalytic hydrogen heaters | — | water only, but oxidation equipment; the fuel cell does it at twice the value | no | rejected |
| 10 | Ammonia, methane (Sabatier), hydrogenated products | — | hydrogen as a product in disguise; methanation returns captured CO₂ to a fuel | no | rejected |
| 11 | Pool across Modules through a facility H₂ header | pooled | four Modules at York feed one finishing hall; item 1 at facility scale | yes | the facility form of item 1 |
| 12 | Grid, sale, pipeline | — | — | no | never |
10.3 Graphitisation batch cycle schedule
Carbon route at 100 TPD, both Lines equal; 8.9 t/d of pristine carbon; one continuous vertical induction graphitiser sized at 2× average (750 kg/h, 2.6 to 3.8 MW); hot zone held at about 1,200 °C between blocks on 0.1 to 0.15 MW rather than cycled to cold, which would destroy the susceptor in months. The hold is the running state of a deferrable load, not a standby unit.
| Time | Block | Graphitiser | Other batch loads | Module balance | H₂ buffer |
|---|---|---|---|---|---|
| 22:00–06:00 | Production, first 8 h | 750 kg/h, 2.6–3.8 MW | shredder off, hydromet off, night fan duty | about −2.2 MW | discharging, 1.3 t over the block |
| 06:00–10:00 | Production, last 4 h or stop on the gate | as above | shredder on at 06:00 | about −2.8 MW | discharging to the 25 % gate |
| 10:00–18:00 | Hold | 1,200 °C hold, 0.1–0.15 MW; lot cooling and classification | shredder on; hydromet day shift; activation block on steam | about +0.8 MW | charging |
| 18:00–22:00 | Hold | hold; next lot staged | shredder on to 22:00 | about +1.4 MW | charging to the 60 % gate |
| Energy available for graphitisation | Block | Graphitised per day | Of 8.9 t/d |
|---|---|---|---|
| design-point surplus with the cascade alone, +0.3 MW | 3 h | 1.5–2 t | 20 %; the rest ships as carbon black at RC2 |
| plus 65 % fuel cells and the graphitiser's own heat recovery | 7–8 h | 5–6 t | 60–70 % |
| full 12 h block, all carbon to RC3 | 12 h | 8.9 t | 100 %; needs about 1 MW more than the Module makes at 100 TPD (the calorific floor on the feed) |
11. Downstream to RC3 — not included; what it would add
The Module definition and every table above stop at the Module boundary: carbon black and bed char, Mineral Phase, liquid CO₂, product water, hydrogen as internal fuel. The RC3 tier of the RevCon™ ladder (Optimized Circular Materials, 26 products, about 69.4 TPD per 100 TPD in the catalog after the four aromatics products (11.25 TPD) left it at Release 126) needs finishing trains that are not in the roster, the balances or the halls.
| Family | RC3 products | Module stream today | Finishing not yet rostered | Added load at 100 TPD |
|---|---|---|---|---|
| CRB carbon | 006, 007, 008 high-purity graphite, 019 | pristine carbon black 8.9 t/d (vapour-derived); bed char 9.4 t/d | graphitisation 2,800 °C, 3–5 kWh/kg (MAX-GRA); steam activation of char (MAX-ACT); classification and pelletising | 1.1 to 1.9 MW + 0.3–0.5 MW thermal |
| MTL metals and REE | 010, 012, 013, 014, 015, 033, 050 | Mineral Phase 10.2 t/d | doré, REE-oxide and minor-metal concentrates: leach, SX, precipitation; 2–3 frames, reagents, 20–40 t/d water | 0.3 to 0.5 MW |
| GLS glass | 005, 006, 007, 012 | in the Mineral Phase | optical and density sort, cullet wash, silica polish | 0.1 MW |
| GAS industrial gases | 006, 007, 008, 016, 017 | liquid CO₂ 51–140 t/d; loop N₂ only | air-separation products: an ASU frame, 100–300 Nm³/h class | 0.3 to 0.6 MW |
| WTR water | 004, 005, 006, FC-001 | 20–75 t/d surplus; UTL-WTR 125 t/d | membrane and resin polish inside UTL-WTR | 0.05 MW |
| MTL minerals (MIN merged) | 003, 004 | Mineral Phase bulk | grading and bagging; largely included | — |
| Total | 26 products | 6 to 9 frames, one hot | 2 to 3.5 MW electric |
11.1 Balances with RC3 finishing
| Carbon route | Mixed | Hydrogen-maximum | |
|---|---|---|---|
| Balance with the heat cascade | +0.3 MW | +1.1 MW | +1.7 MW |
| RC3 finishing load | −2.0 to −3.5 MW | −1.5 to −2.5 MW | −0.8 to −1.2 MW (no graphite: no carbon) |
| Balance with RC3 finishing | −1.7 to −3.2 MW | −0.4 to −1.4 MW | +0.5 to +0.9 MW, but no CRB products |
| With graphitisation as the deferrable load and its heat in the cascade | about −1 MW | ≈ 0 | — |
11.2 The conflict to rule on
Hydrogen-maximum sends the carbon to the fuel cells and reforms the aromatics, which removes the CRB family (34 % of catalog gross elemental value on the catalog of 2026-11-03, and the graphite that feeds the ~$85 M/yr RC4 carbon products at 400 TPD); the aromatics it also reformed (14 % on that catalog) have since left the catalog (R126). Ruled by the Architect, 2026-11-03: the carbon route W1 is the design point; hydrogen-maximum is the energy-emergency setting only. Amended the same day: aromatics are dropped from the Module's product scope; the CRSRU runs at full dissociation severity at every setting, no pass-through setting in the sweep, the trace condensate returns to feed through the separator. The carbon-route column is now the design column in every table above; fuel cells stay at target plus swing because the emergency setting still has to run; graphitisation is the deferrable load. If RC3 finishing is included: +6 to 9 frames (Module 42 to 55), a 15 m extension of Hall 2 or a fourth finishing hall on the spine, a reagent utility family, and finished-product storage on the pad.
11.3 Refining lines defined, by family, and the RC tier reached
| Family | Refining line defined | Product | RC tier reached | What RC3 needs |
|---|---|---|---|---|
| CRB carbon | MAX-CSP separation and bagging; MAX-ACT and MAX-GRA as placeholders | carbon black CRB-002; bed char CRB-001 | RC2 (RC1 char) | graphitisation sized (the deferrable load) → high-purity graphite CRB-008 RC3, feeding the RC4 graphene products; activation sized |
| MTL metals and minerals | PRE-SEP ferrous and eddy-current; MAX-CSP density and magnetic separation; grading and bagging | ferrous and non-ferrous MTL-001/002; mineral aggregate and SCM MIN-003/004 | RC1 metals; RC3 mineral aggregate | hydromet: leach, SX, precipitation, 2–3 frames → seven MTL RC3 products |
| GLS glass | none; glass stays in the Mineral Phase | glass feedstock GLS-001 | RC1 | optical and density sort, cullet wash, silica polish; 1 frame |
| GAS industrial gases | MAX-GAS liquefaction of the anode-outlet CO₂ by absorption refrigeration; loop N₂ only | liquid industrial CO₂, 51–140 t/d | RC2, industrial grade (tier to be confirmed) | ASU frame for the RC3 GAS products; CO₂ purification for a higher-grade CO₂ |
| WTR water | UTL-WTR 125 t/d polish of fuel-cell water and product water | fuel-cell water WTR-FC-001; product water | RC3 with the polish | nothing beyond the polish; semiconductor grade is a 97 % RC4 pull-in |
Refining reaches RC3 today for water and the mineral aggregate, RC2 for carbon black and CO₂, and RC1 for metals and glass. The carbon line is the one that matters: its RC3 step is already a placeholder on the roster, carries most of the catalog value, and is the deferrable load.
The catalog session owns product definitions and yields; the mapping to frame IDs is the Doc Portal's under D-FME-01. This section is the flag, not the ruling.
12. Product table: OmniCrude™ streams as floors, RevCon™ products in process order
The Circular Materials Catalog (RevCon™ RC1 to RC5): 54 manufactured materials at baseline (RC1–RC3), up to 103 with additional refining equipment (RC4–RC5), laid out with the OmniCrude™ streams as floors and refinement running left to right in process order; within a cell the products are the chain for that stream and tier. Colour is the stage at which this design delivers the product (Module file sections 23 and 24): Stage 1, the Day-1 Module, the ruled slate of 8; Stage 2, the Phase 2 graphitiser and carbon classification, 4; Stage 3, the four-Module facility with its shared finishing hall, 38; Stage 5, RC4 lines on the finishing hall, 34; Stage 6, RC5 lines in a cleanroom-class bay, 17; grey, 2 never delivered: the mixed gas and pure CO that are the Module's fuel. Hover a tile for the catalog basis and precursor. Tiers and chains are the catalog's; the stage flags are this package's, for the catalog session to confirm.
| OmniCrude™ stream | RC1 Circular Raw Material | RC2 Functional Conversion | RC3 Optimized Circular Materials | RC4 Specialized Circular Material | RC5 Premium Circular Product |
|---|---|---|---|---|---|
OmniCrude™ Vapor pristine carbon from the CRSRU (carbon black and the graphite line) | CRB-002Carbon Black CRB-005Standard Graphite | CRB-006Conductive Carbon CRB-007High-Grade Carbon Black CRB-008High-Purity Graphite | CRB-009Carbon Fiber Precursor CRB-010Graphene Oxide CRB-011Multi-Walled CNTs CRB-012Synthetic Graphite CRB-018Spheroidized Graphite CRB-021Mesoporous Templated Carbon | CRB-013Reduced Graphene Oxide CRB-014Multi-Layer Graphene CRB-015Single-Layer Graphene CRB-016Single-Walled CNTs CRB-017Fullerenes (C60/C70) | |
OmniCrude™ Gas (syngas) CO₂ at the fuel-cell anode outlet; CO and the mixed gas are internal fuel | GAS-001Mixed Gas | GAS-003Carbon Dioxide, Industrial | GAS-006High-Purity Nitrogen GAS-007High-Purity Oxygen GAS-016Pure Carbon Monoxide GAS-017Beverage-Grade CO₂ | ||
OmniCrude™ Solids (bed char) char and its activation line | CRB-001Raw Carbon Char | CRB-003Activated Carbon CRB-004Biochar | CRB-019Hard Carbon (Na-ion) | CRB-020Nanoporous Activated Carbon | |
OmniCrude™ Mineral Phase minerals, glass, ash-derived REE and heavy metals | GLS-001Mixed Glass Cullet GLS-002Glass Powder MIN-001Mineral Aggregate | GLS-003Color-Sorted Cullet GLS-004Glass Aggregate MIN-002Pozzolanic SCM Powder | GLS-005Recycled Container Glass GLS-006Glass Beads GLS-007Foam Glass GLS-012Foam Glass Cellular Block MIN-003Geopolymer Precursor MIN-004Precipitated Calcium Carbonate | GLS-008High-Quality Cullet GLS-009Specialty Glass Powder GLS-011Photocatalytic Silica-TiO₂ MIN-005Specialty Mineral Filler MTL-016Cerium (REE) MTL-017Lanthanum (REE) MTL-018Neodymium (REE) MTL-019Yttrium (REE) MTL-020Praseodymium (REE) MTL-021Gadolinium (REE) MTL-028Mercury MTL-029Cadmium MTL-030Arsenic MTL-031Antimony MTL-032Boron MTL-051Lead, Battery-Grade | GLS-010Ultra-Pure Silica MIN-006Low-Activation Aggregate |
Recovered metals (PRE-SEP) ferrous and non-ferrous from Pregenesis™ separation; refined metals through the hydromet frame | MTL-001Iron / Steel MTL-002Mixed Non-Ferrous | MTL-003Aluminum MTL-004Copper MTL-005Zinc MTL-006Lead MTL-007Nickel MTL-008Tin MTL-009Manganese MTL-045Black Mass Concentrate | MTL-010Chromium MTL-012Silver MTL-013Gold MTL-014Platinum MTL-015Palladium MTL-033Cobalt MTL-050Iron Oxide Pigments | MTL-044Lithium Carbonate MTL-046Cobalt Sulfate MTL-047Nickel Sulfate MTL-048Lithium Hydroxide | MTL-040Tungsten, Ultra-Pure MTL-041Bismuth, Ultra-Pure MTL-042Gallium, Semiconductor MTL-043Indium, Semiconductor |
Water fuel-cell water and product water | WTR-001Treated Wastewater WTR-002Gray Water | WTR-003Filtered Water | WTR-004Softened Water WTR-005Distilled Water WTR-006Purified Water (USP) WTR-FC-001FC Water — Industrial DI | WTR-007Deionized Water WTR-008Semiconductor Grade Water WTR-FC-002FC Water — Semiconductor | WTR-009Pharmaceutical Grade Water WTR-010Ultra-Pure Water WTR-FC-003FC Water — Ultra-Pure |
Air (ASU, not from feedstock) air-separation products; an ASU frame is part of the RC3 finishing set | GAS-004Nitrogen, Industrial GAS-005Oxygen, Industrial | GAS-008Argon | GAS-010Specialty Gas Mixtures GAS-011Neon | GAS-013Ultra-High Purity Nitrogen GAS-014Xenon GAS-015Krypton |
13. Roster, buildings and layout
13.1 Frames per Module, consolidated roster
| Protocol | Frames | Contents |
|---|---|---|
| Pregenesis™ | 7 | PRE-RCV, PRE-SHR, PRE-SEP (ferrous + eddy-current), PRE-DRY × 2, PRE-ADX, PRE-SIL dried-feed buffer (frame-or-silo OPEN) |
| Regenesis™ | 9 (locked roster, amended 13 → 9) | REG-FDS shared; per Line: REG-MCR × 2, REG-CRS hot frame (PCY, booster, CRSRU, two torches, chopper, N₂ loop), REG-QBR recovery frame (quench boiler, topping turbine, HRSG, candle filter) |
| Regenesis MAX™ | 3 + finishing | MAX-GAS A and B (acid-gas sorbent, CO₂ liquefaction by absorption), MAX-CSP solids; MAX-ACT and MAX-GRA placeholders; RC3 finishing adds 6 to 9 (graphitiser, activation, classification, hydromet × 3, glass sort, ASU, water polish) |
| Energy and utilities | 15 to 21 | PWR-FCM × 12 to 15, PWR-HRS (HRSG, turbine, absorption chiller, thermal store), PWR-ACC, PWR-BES, NXS-ELC (with the batch scheduler), NXS-THM (cascaded loops), UTL (APS, water treatment with the separator, N₂) |
| ISO tanks and bulk units | 4 MEGC at grade; 5 to 13 CO₂ T50 tiered; 1 N₂ T75; 2 water T11 and 2 condensate/DI T11 tiered; 3 to 4 solids bulk units | certified units, swapped as units; tiered two-high on ISO 1161 corners |
13.2 The three halls
| Hall | Contents | Size | Height |
|---|---|---|---|
| 1 Receiving + Pregenesis™ | drive-through receiving lane with doors on both long walls, 20 × 20 m feedstock receiving bay, PRE-RCV, two rows of Pregenesis frames; Hall 1 sump for the separator | 75 × 40 m | 7 m eave |
| 2 Main: Regenesis™ + MAX | FDS at the head; Lines A and B mirrored about the spine; MAX bays; frame-swap gable doors; H₂ detection and relief at the ridge | 75 × 50 m | 15 m ridge |
| 3 PowerBlock | fuel-cell frames in two rows, HRSG, switch frame, BESS, thermal, utilities; coolers outside the south wall | 50 × 40 m | 7 m eave |
| Gaps and crossings | 10 m fire gaps; the dried-feed bridge (Z4) across gap 1; the syngas header, 1,500 VDC bus and steam lines across gap 2; NEXUS spine on one rack line through all three | — | — |
| Tank pad | outside the PowerBlock gable, 18 × 50 m, tanks tiered two-high, H₂ MEGC at grade in a separation zone (distances OPEN) | — | — |
Drawings: frames, flows and balances v5 — lucid.app/lucidchart/eafcad99…; plot plan v6 — lucid.app/lucidchart/f4b0bfee…. Interfaces: the 20-family common set (8 NEW), standardised controllers on 48 VDC, every connection frame-to-frame or overhead, the feed bridge as a site-level Z4 item, a facility Z3 H₂ header at York.
14. Open items
| Item | Owner |
|---|---|
| Decision records for the 2026-11-02 form answers and the 2026-11-03 rulings: D-65-C, Q2 amendments (carbon route, aromatics), D-REG-SCOPE-02, PowerBlock re-basing, D-ACM-EMS-01 turndown envelope with the equal-dispatch and batch-load lines | Doc Portal |
| RC3 finishing frames under D-FME-01; MAX-GRA as a continuous vertical induction graphitiser with a hold state | Doc Portal |
| Catalog product-ID and tier mapping of the Module's streams, the tier of liquid industrial CO₂, and the removal of the aromatics from the dissociation-basis slate (done at Release 126) | catalog session; Corpus Zone |
| R1 frame envelope limits (the two merged frames at the assumed 30 t) | Doc Portal / ASI |
| Hydrogen separation distances; MEGC tiering; fire-code review of hydrogen and SOFC fuel cells under membrane roofs | site and code review |
| Closing the −1 MW on the design point with full RC3 finishing: 65-percent fuel cells or a calorific floor on the feed | Architect |
| Instrument and process air with the APS sizing; D-48V-01 controls bus; feed buffer frame-or-silo; hot FAT bay at the ASI; CO₂ off-take at York | Doc Portal / site |
| Simulator: CRSRU zone, moisture and EAF sweep (no severity dimension); hydrogen as plasma gas and A2 as Gen 2 test targets, electrode erosion in H₂ plasma to measure | simulator; Gen 2 programme |