Advanced Circular Manufacturing
Engineering Documentation Portal
OEM-grade engineering specifications, interface control documents, and operations procedures for the Carbotura ACM Modular Factory system.
Document Status Dashboard
OER Classification
Class 2
±15% accuracy — investor-bankable
ICD Status
0 TBD
All interfaces defined — Rev 1
Open Actions
7
Tracked to named OER gates
Terminology Firewall
Active
v1.0 — all documents enforced
RevCon™ Baseline
RevCon™ 3
$150M–$325M/yr revenue floor
ASI Model
Active
ASI (Authorized Systems Integrator) — Active
⬡
Design Zero · 100 TPD Module
5 documents · working design, unlocked
Module Definition
CBT-MOD-DEF-001
100 TPD Module — Frame and ISO Tank Definition (two Lines, failover), §1–24
Operating Envelope
CBT-MOD-ENV-001
Operating Envelope — throughput, power by tonnage, utilities, heat cascade, hydrogen, product table, stages
Drawings
CBT-MOD-DRW-001
Frames and Flows v5 · Plot Plan v6 (three sprung halls)
Technical Briefing
CBT-MOD-VID-001
100 TPD Module — Technical Briefing (3:00): floor, target, ceiling, failover
Rulings Register
CBT-MOD-DEC-001
Design Zero Register — rulings of 2 and 3 November 2026 and the records they unlock
⬡
Pregenesis™ Protocol
13 documents
Technical Design Specification
CBT-PRE-TDS-001
Pregenesis™ Protocol — Full Module Architecture
Technical Design Specification
CBT-PRE-TDS-002
Modules 0A, 0B & 0C — Truck Intake, Feedstock Ingest & Trough System
Technical Design Specification
CBT-PRE-TDS-003
Modules 1–4 — Primary Shredding, Hammermill, Ash Pulverizer & Rotational Mixer
Technical Design Specification
CBT-PRE-TDS-004
Module T2 Processing — Dewatering, Drying & Integrated Processing
Technical Design Specification
CBT-PRE-TDS-005
Liquifact™ Collection, Evaporation & Distillate Recovery
Interface Control Document
CBT-PRE-ICD-001
Pregenesis™ Protocol ICD — ASI Standardized Connectors, Spring Isolation & Cross-Protocol Thermal Interfaces
Engineering Design Package
CBT-EDP-SHRD-001
Shredder Train — ASI Procurement Package
Operations Procedure
CBT-PRE-OPS-001
Pregenesis™ Protocol — Master Operations
Operations Procedure
CBT-PRE-OPS-002
Feedstock & Liquid Station Operations — Truck Intake, Trough Feed, Bay Assignment
Operations Procedure
CBT-PRE-OPS-003
Shredder Train Operations — Primary Shredder, Hammermill, EAF Control
Operations Procedure
CBT-PRE-OPS-004
T2 Processing Operations — Dewatering, Drying, Pulverizing
FMEA Register
CBT-PRE-FMEA-001
Pregenesis™ Protocol — Failure Mode & Effects Analysis Register
CAPEX Summary
CBT-PRE-CAPEX-001
Pregenesis™ Protocol — Total Module CAPEX [Class 2 ±15%]
▷
Regenesis™ Protocol
Coming Soon
Regenesis™ Protocol documents are in preparation. Zone content will appear here when released.
▷
Zero-E PowerBlock™™
Coming Soon
Zero-E PowerBlock™ documents are in preparation.
▷
NEXUS Utilities
Coming Soon
NEXUS Utilities documents are in preparation.
▷
Atmospheric Processing
Coming Soon
Atmospheric Processing System documents are in preparation.
📖
Reference Documents
2 documents