Carbotura®
Engineering Portal
ISC-2 Confidential
Design Zero · 100 TPD Module — CRSRU heat-source design set

Clean-Sheet Route for Maximum Hydrogen and Carbon from the Feedstock (Rev 1)

Rev 1 working file of the CRSRU heat-source sub-session, rendered as written; linked from MOD-DEF-001 §4.2. File name kept as the page title: CLEAN_SHEET_H2_CARBON.md.

Doc No.CBT-MOD-CRSRU-006
RevisionDesign Zero
StatusDESIGN ZERO — WORKING DESIGN, UNLOCKED
ClassificationISC-2 Confidential
Baseline100 TPD Module · carbon route W1
Design Zero
DESIGN ZERO — WORKING DESIGN, UNLOCKED. Design Zero is unlocked; the Architect locks it when the time is right. Every earlier locked record this design touches is unlocked by CBT-TB-PORTAL-014, not amended. Provenance tags [RULED] [COMPUTED] [INFERRED] [OPEN] [PROPOSED] are kept; under Design Zero a [RULED] tag means ruled by the Architect for Design Zero, not locked. OPEN values are not filled.
Document Control
Document NumberCBT-MOD-CRSRU-006
DesignDesign Zero · 100 TPD Module
Document StatusDESIGN ZERO — WORKING DESIGN, UNLOCKED
OwnerCarbotura Inc. — Engineering; Allen Witters, Lead Systems Architect
ClassificationISC-2 Confidential
AuthorityCBT-TB-PORTAL-014 (Architect, 2026-11-04)
Source of recordCRSRU_HEAT_SOURCE_DESIGN/CLEAN_SHEET_H2_CARBON.md on main
Sub-sessionCRSRU heat-source design ·
Date2026-11-02 (Rev 1 reconciles the duty and yields with
StatusDESIGN PROPOSAL — not a ruling. Written on the Architect's direction of 2026-11-02: *the CRSRU

Sub-session: CRSRU heat-source design · Date: 2026-11-02 (Rev 1 reconciles the duty and yields with 00_DESIGN_BASIS_COMMON.md Rev 1: Boudouard term added, full CH₄ load, carbon and H₂ figures restated) For: Allen Witters, Lead Systems Architect · Classification: ISC-2 Confidential Status: DESIGN PROPOSAL — not a ruling. Written on the Architect's direction of 2026-11-02: the CRSRU dissociates every hydrocarbon in the vapour to carbon and hydrogen; the priority is hydrogen and carbon products.

Provenance tags: [RULED] [COMPUTED] [INFERRED] [OPEN]. All figures per Line at 50 TPD on the model's reference feed, element basis, Class 4. Canon note: hydrogen is Island-Mode internal fuel, never a product (Doctrine); this file says "hydrogen to the PowerBlock" and "carbon products".


1. What the feed contains — the budget nothing can exceed [COMPUTED]

Per Line, 2,083 kg/h as received: moisture 23.7 %, mineral 10.2 %, dry-ash-free organic 1,377 kg/h. Carbon 18.15 mol/s (785 kg/h); hydrogen 14.8 mol/s H₂-equivalent (107 kg/h); organic oxygen 7.87 mol/s (453 kg/h); moisture 7.61 mol/s (494 kg/h). Full table in 00_DESIGN_BASIS_COMMON.md §2.

The oxygen disposition rule. 453 kg/h of oxygen must leave bound to something. As CO₂ it costs 0.5 C per O; as CO, 1 C per O; as H₂O, 2 H per O. Every mol of water that reacts with carbon trades one carbon atom for two H₂ (one in the CRSRU, one at the shift). That trade is the only dial.

2. The water split — three routes [COMPUTED]

The Recyclotron™ forms ~4.8 mol/s of reaction water from organic oxygen regardless of feed moisture; it reaches the CRSRU with the tars and reacts with carbon there. Feed moisture can be dried off in Pregenesis™ and re-used as WGS steam, where it cannot touch solid carbon.

Route Water reacting with carbon in the CRSRU Carbon product H₂ to PowerBlock CO₂ co-manufactured H₂ as electricity at 55 % PEM
W0 — theoretical ceiling, no water reacts (not reachable) 0 650 kg/h 85 kg/h 190 kg/h 1.6 MW
W1 — feed dried to ~5 %; reaction water and residual react; dried-off moisture to the WGS 6.35 mol/s 380 kg/h (18 % of feed) 163–186 kg/h (7.8–8.9 %) 1,070–1,485 kg/h 3.0–3.4 MW
W2 — no drying; all water through the CRSRU; WGS on boiler steam 12.5 mol/s 115 kg/h 275 kg/h 2,440 kg/h 5.0 MW

W1 keeps 3.3× the carbon of W2 and gives 60–70 % of its hydrogen. §3 shows why W2 does not buy what it appears to buy.

3. The energy ledger — the finding that frames everything [COMPUTED / INFERRED]

Electrical demand per Line, Option C heater at CENTRAL duty (1,400 °C), N₂ loop, candle filter:

Load W1 W2 Basis
Recyclotron™ magnetrons, 2 × 300 kW at 83 % 0.72 MW 0.72 MW published 720 kW per 600 kW
CRSRU heater (2.2 / 3.0 MW thermal ÷ ~0.58 incl. N₂ heating) 3.8 MW 5.2 MW C_DC_TORCH_BASELINE.md
N₂ loop, candle filter 0.1 MW 0.1 MW
GPU/WGS gas compression from 0.5 atm to ~8 bar (~2,900 Nm³/h) 0.9 MW 1.3 MW 0.3 kWh/Nm³
Pregenesis™ mechanical and drying auxiliaries (drying heat from recovered steam) 0.3 MW 0.2 MW [INFERRED]
APS, controls, misc. 0.2 MW 0.2 MW [INFERRED]
Demand 6.0 MW 7.7 MW
Supply from the Line's own hydrogen at 55 % PEM 3.0–3.4 MW 5.0 MW §2
Deficit 2.6–3.0 MW 2.7 MW

Converting carbon to hydrogen through an electrically heated CRSRU is almost energy-neutral. One mol of carbon reacted with steam yields 2 H₂ (484 kJ chemical, ~266 kJ electric at 55 % PEM) and costs 131 kJ of endotherm at ~58 % heater efficiency (~226 kJ electric). Net gain ~40 kJ per mol of carbon destroyed: ~0.04 MW per 100 kg/h of carbon. W2 destroys 265 kg/h of carbon per Line and the deficit does not move. Carbon is nearly free to keep.

Island-Mode self-sufficiency at 50 TPD per Line is not reachable from this feed at any carbon yield with a plasma-heated CRSRU. The feed carries 8.4 MW of chemical energy per Line; at 55 % PEM the ceiling is 4.6 MW electric with zero carbon product, below the 6 MW demand. This is D-ACM-ENERGY-01's calorific floor made concrete. The gap closes with the levers in §7, with a higher-LHV feed envelope, or with external power of ~2–3 MW per Line (16–24 MW per 400 TPD facility). Which, is a ruling.

4. The optimized route — "water around the carbon" (W1) [INFERRED design]

Pregenesis™ drying (recovered steam) ──dried-off moisture 6.1 mol/s──────────────┐ (as WGS steam)
      │ dry feed (~5 % moisture), 13 mm, admix                                   │
Recyclotron™ ×2 (dry, recycled-H₂ carrier, no bed steam, 550–650 °C, 0.5 atm)     │
      │ char 195 kg/h + mineral 212 kg/h → OmniCrude™ Solids → separation         │  carbon product 1
      │ vapour 1,290 kg/h: hydrocarbons + reaction water + CO/CO₂ + H₂             │
Primary Cyclone → REG-CCS-001                                                     │  carbon product 2 (pristine fines)
      │ [hot-gas booster 0.5 → 1.2 atm — option]                                  │
CRSRU dissociation reactor, 1,300–1,400 °C, 0.5–2 s, 2.0–2.2 MW thermal           │
      │ H₂ 16.3 + CO 9.4 mol/s (+ N₂ 9.5 if DC torch) + 185 kg/h carbon black      │
Quench boiler (fast through 1,200 → 700 °C) → steam to drying and WGS            │
HRSG → candle filter → CRSRU carbon black → metals separation                     │  carbon product 3
Condenser (little water) → acid-gas removal (HCl, H₂S)                            │
Water Gas Shift ◄──────────────────────────────────────────────────────────────────┘
CO₂ removal → PSA → H₂ 163–186 kg/h to Zero-E PowerBlock™ ; N₂ → loop ; CO₂ → buffer

4.1 Pregenesis™ — the carbon decision is made here

Dry to ≤5 % moisture on quench-boiler/HRSG steam: 0.36 MW thermal per Line to evaporate 494 kg/h; the recovery streams are 1–2 MW per Line. The Trough 2 paddle dryers already run on quench steam per Devin's acknowledgment. Target moisture is OPEN; the case matrix's moisture axis is the sweep that sets it. The dried-off water is the WGS steam supply.

4.2 Recyclotron™ — clean-sheet changes for downstream

Change Why Reopens
No bed steam injection 2.2 mol/s of steam per Line would react with carbon in the CRSRU: −95 kg/h carbon, +32 kg/h H₂, ~zero net energy D-MCR-FLOW-01
Recycled H₂ as purge, airlock and dense-phase injection gas instead of N₂ Non-dilutive; nothing new at the GPU; carbon methanation (C + 2 H₂ → CH₄) is slow and disfavoured at 550–650 °C and 0.5 atm D-46, the Dense-Phase N₂ Pneumatic Injection System name
Freeboard at the hot end (650 °C, 400 kW zone) More in-reactor tar dissociation onto admix surfaces; that carbon reaches the Primary Cyclone pristine none
Keep the char in the bed — fixed carbon 195 kg/h per Line leaves with the solids Without bed steam the char is not consumed; carbon product 1, mixed with 212 kg/h mineral solids carbon/mineral separation spec — OPEN
0.5 atm stays CH₄ → C + 2 H₂ is mole-increasing; low pressure favours it at the CRSRU too none
Hot-gas booster after the Primary Cyclone (option) 0.5 atm doubles every downstream volume and costs ~0.9 MW per Line in GPU compression; a 600 °C booster to 1.2 atm costs ~0.15 MW and roughly halves it CRSRU pressure (OPEN)

4.3 CRSRU — a dissociation reactor

  • Duty: 1.95–2.2 MW thermal per Line at 1,300–1,400 °C (sensible 0.77–0.88, CH₄ dissociation 0.21–0.34, tars −0.085, steam-carbon 0.83, Boudouard 0.13, loss 5 %). 1,300–1,400 °C is the working range; tars dissociate fully in 0.5–2 s there, CH₄ needs the upper end or the non-equilibrium of a plasma. Each 100 °C above 1,300 °C is ~0.1 MW thermal, ~0.17 MW electric.
  • Heater: the DC torch (Option C, 1,500 VDC long-arc, N₂ loop, 3.8 MW electric at CENTRAL) is the Gen 1 answer and the only MW-class unit in service. The electrodeless vapour-through-the-head microwave configuration (A2, 3.7 MW) is the clean-sheet target because under this function the electrode fume lands in the carbon product (Option C: Cu 10–50 ppm with a rotated anode, up to ~500 ppm at the literature high end; W 5–50 ppm) and A2 puts no metal in it. TRL 3–4; a test item.
  • Carbon formed: 185 kg/h per Line as nanometre carbon black (carbon product 3). Boudouard takes 33 kg/h and steam-carbon 275 kg/h of the hydrocarbon carbon; that is the cost of the oxygen and water that reach the vessel.

4.4 Quench, recovery, capture

Fast quench through 1,200→700 °C: boiler tubes or a recycled-H₂ gas quench keep the carbon dry (the carbon-black industry's water spray would reintroduce steam onto hot carbon). Quench steam → drying and WGS. Candle filter after the HRSG (110–260 m² per Line at 0.5 atm; ~half with the booster) collects the carbon black; no cyclone catches it. The Secondary Cyclone has no carbon duty — retire or keep as a coarse guard (D-REG-SCOPE-02). Three carbon streams kept apart until the CRSRU carbon has passed metals separation: REG-CCS-001 (pristine), bed char (with mineral), CRSRU carbon black.

4.5 Gas train

Acid-gas removal (10.5 kg/h HCl, 4 kg/h S) ahead of the shift catalyst and PEM; WGS on the 6.1 mol/s of dried-off water (shifts 6.1 of 9.4 mol/s CO → H₂ 163 kg/h), plus 3.3 mol/s boiler water to shift the rest (→ 186 kg/h) or send the residual CO to REG-BSC-001; CO₂ removal (1,070–1,485 kg/h per Line — the oxygen disposition); PSA; H₂ to the PowerBlock; N₂ to the torch loop (Option C) or none (A2).

5. Product makeup per Line and per Module (W1) [COMPUTED]

Stream Per Line (50 TPD) Per Module (100 TPD) % of feed
Carbon product 1 — bed char (in 407 kg/h of solids with mineral) 195 kg/h 390 kg/h 9.4 %
Carbon product 2 — Primary Cyclone fines (pristine) within product 1's accounting; split OPEN
Carbon product 3 — CRSRU carbon black 185 kg/h 370 kg/h 8.9 %
Carbon total 380 kg/h = 9.1 TPD 18.2 TPD 18.2 %
H₂ to PowerBlock 163–186 kg/h = 3.9–4.5 TPD 7.8–8.9 TPD 7.8–8.9 %
CO₂ (oxygen disposition) 1,070–1,485 kg/h 2.1–3.0 t/h 51–71 %
Mineral (ash + admix) 212 kg/h + admix 10.2 % +
Water: dried moisture 494 → WGS steam 395; residual
HCl / H₂S / NH₃-derived to acid-gas handling 10.5 / 4 / ~4 kg/h
N₂ in loop (Option C only) 765 Nm³/h circulating, 40–75 make-up

The published Rev 0 balance (gas 31 %, oil 13 %, water 16 %) has no carbon-black or CO₂ line; this route replaces the oil line almost entirely with carbon and CO₂. REG-BSO-001 shrinks to a trace.

6. Contamination under this route

Heater In the CRSRU carbon black (185 kg/h) Note
Option C, 1,500 V, rotated anode Cu 10–50 ppm, W 5–50 ppm (literature high end: Cu to ~500 ppm) Carbon-black grades tolerate tens of ppm; graphite precursor needs density separation (W) and the graphitization step (Cu)
A1 microwave, clean sheath gas Si 1–8 ppm, no metal
A2 microwave, vapour through heads Si 8–75 ppm, no metal window erosion in tar-laden gas; needs manufacturer data
B RF ICP Si 1–12 ppm, no metal
Any S and Cl adsorbed from H₂S/HCl — OPEN carbon-black practice <1 % S; spec-dependent

Carbon products 1 and 2 never see the heater.

7. Levers if the ~2.6–3 MW per Line deficit must close without external power

Lever Gain per Line Cost
CRSRU at 1,300 °C with in-reactor CH₄ credit (LOW case) 0.4 MW CH₄ dissociation completeness — simulate
A2 electrodeless heater (no N₂ to heat, ~61 % to gas) 0.1–0.3 MW TRL 3–4
Hot-gas booster after the Primary Cyclone 0.5–0.7 MW a 600 °C booster on carbon-laden vapour
PEM at 60 % rather than 55 % 0.3 MW PowerBlock specification
Feed envelope with higher LHV (tyres, plastics) 1–3 MW feedstock, not design — the calorific floor
All of the above ~2.3–4.5 MW closes the gap on paper, not with margin

Destroying carbon for hydrogen is not on the list.

8. What this route reopens (rulings, not for this sub-session)

  1. D-65-B function — closed as dissociation by direction; the record text still says reforming.
  2. D-MCR-FLOW-01 — bed steam injection is contrary to the carbon priority.
  3. D-46 and the Dense-Phase N₂ Pneumatic Injection System — carrier gas becomes recycled H₂.
  4. Pregenesis™ design basis Rev 3 — a moisture target (≤5 % proposed) becomes a hard output spec.
  5. D-REG-SCOPE-02 — Secondary Cyclone role; candle filter not rostered; PTS frame per heater.
  6. D-ACM-ENERGY-01 / PowerBlock / Island Mode — the ~0.35 MW allowance, the 8 MW per Module basis, external power or a calorific floor on the feed envelope.
  7. Hydrogen canon wording — "hydrogen and carbon products" vs "Island-Mode fuel, never a product".
  8. Solids carbon/mineral separation — carbon product 1 is 195 kg/h carbon in 407 kg/h of solids.
  9. CRSRU pressure — the booster option.
  10. The CO₂ stream at 1.1–1.5 t/h per Line as a near-zero-claim question for Corpus Zone.

9. Open items this proposal carries

Pregenesis™ moisture target; CRSRU temperature within 1,300–1,400 °C; heater (C now, A2 as test target); quench medium; carbon-black grade vs graphite-precursor route for product 3; S/Cl on the carbon; the simulator's CRSRU zone (the dissociation reactions exist in reactions.ts under the code identifier TAR_CRACKING); and every item in 00_DESIGN_BASIS_COMMON.md §8.