Design Zero · 100 TPD Module — CRSRU heat-source design set

CRSRU Heat Source — Common Design Basis (Rev 1, dissociation basis)

Rev 1 working file of the CRSRU heat-source sub-session, rendered as written; linked from MOD-DEF-001 §4.2. File name kept as the page title: 00_DESIGN_BASIS_COMMON.md.

Doc No.CBT-MOD-CRSRU-001
RevisionDesign Zero
StatusDESIGN ZERO — WORKING DESIGN, UNLOCKED
ClassificationISC-2 Confidential
Baseline100 TPD Module · carbon route W1
Design Zero
DESIGN ZERO — WORKING DESIGN, UNLOCKED. Design Zero is unlocked; the Architect locks it when the time is right. Every earlier locked record this design touches is unlocked by CBT-TB-PORTAL-014, not amended. Provenance tags [RULED] [COMPUTED] [INFERRED] [OPEN] [PROPOSED] are kept; under Design Zero a [RULED] tag means ruled by the Architect for Design Zero, not locked. OPEN values are not filled.
Document Control
Document NumberCBT-MOD-CRSRU-001
DesignDesign Zero · 100 TPD Module
Document StatusDESIGN ZERO — WORKING DESIGN, UNLOCKED
OwnerCarbotura Inc. — Engineering; Allen Witters, Lead Systems Architect
ClassificationISC-2 Confidential
AuthorityCBT-TB-PORTAL-014 (Architect, 2026-11-04)
Source of recordCRSRU_HEAT_SOURCE_DESIGN/00_DESIGN_BASIS_COMMON.md on main
Sub-sessionCRSRU heat-source design (Doc Portal sub-session) ·
Date2026-11-02 (Rev 1, same day)
StatusDESIGN INPUT — not a ruling, not a released specification
Work orderCRSRU_HEAT_SOURCE_BRIEF.md (Doc Portal, 2026-11-02)
Working decision nameD-65-C

Sub-session: CRSRU heat-source design (Doc Portal sub-session) · Date: 2026-11-02 (Rev 1, same day) For: Allen Witters — Lead Systems Architect · Working decision name: D-65-C Classification: ISC-2 Confidential · Status: DESIGN INPUT — not a ruling, not a released specification Work order: CRSRU_HEAT_SOURCE_BRIEF.md (Doc Portal, 2026-11-02)

Rev 1 — what changed. The Architect directed in session on 2026-11-02 that the CRSRU dissociates every hydrocarbon in the vapour to carbon and hydrogen; the priority is hydrogen and carbon products. Rev 0 carried the CRSRU function as open (reforming vs tar-only) and sized duty on a steam-reforming central case. Rev 1 sizes everything on the dissociation basis and on the clean-sheet route in CLEAN_SHEET_H2_CARBON.md (feed dried to ~5 % moisture, no bed steam, dried-off water routed to the Water Gas Shift). Rev 0's P50 composition table also carried per-species kg/h values that mixed the 25 and 50 TPD-per-reactor runs; corrected here.

How to read this. Provenance tags as in RECYCLOTRON_DESCRIPTION.md: [RULED] Architect direction · [COMPUTED] derived and checkable, method stated · [INFERRED] sub-session reasoning, needs confirmation · [OPEN] not yet determined. The in-session direction of 2026-11-02 is tagged [RULED — direction, record pending] because no decision record has been written for it yet.

Simulator ceiling. Every number from C:\ACM-1\apps\mcr-sim carries its Class 4 Preliminary ceiling (release.ts KNOWN_LIMITATIONS LIM-PLASMA-01, LIM-FLOW-01, LIM-RESIDENCE-01, LIM-MORPHOLOGY-01). Rev 1 uses the model's feed characterisation and species split on an element basis; the three-zone kinetic runs of Rev 0 are retained as the range on in-reactor conversion.


1. Scope and the throughput envelope

The CRSRU — Carbon Recovery Syngas Reforming Unit (ISO Frame type CBT-ISOFRT-REG-CRS) takes the OmniCrude™ Vapor leaving the Primary Cyclone (CBT-ISOFRT-REG-PCY) at the Recyclotron™ outlet range, raises it to the CRSRU operating range, dissociates every hydrocarbon to solid carbon and H₂, and hands the stream to the Quench Boiler (CBT-ISOFRT-REG-QBR), which freezes the composition.

Item Value Provenance
Module 100 TPD = 2 Lines × 50 TPD, both duty, outputs combined [RULED] D-LINE-02
Recyclotrons 2 per Line, 4 per Module, all duty; 25 TPD target each at 50 % duty, 50 TPD capability; 600 kW at 915 MHz; bulk 550–650 °C; 0.5 atm [RULED] Architect 2026-11-01, D-65-A, D-MCR-*
Regenesis™ roster MCR×4 · FDS×1 · PCY×2 · CRS×2 · PTS×2 · QBR×2 = 13 serials per Module [RULED] D-REG-SCOPE-02 (LOCKED)
CRSRU per Line 1 reforming vessel (REG-CRS) + 1 Plasma Torch Skid (REG-PTS) [RULED] D-REG-SCOPE-02
CRSRU inlet Vapour only, downstream of Primary Cyclone [RULED] D-REG-SCOPE-02, Doctrine R35/R41
CRSRU function Dissociation of all hydrocarbons to C(s) + H₂; priority hydrogen and carbon products [RULED — direction, record pending] Architect 2026-11-02
CRSRU inlet temperature 550–650 °C; 600 °C used for duty arithmetic [RULED] range; [INFERRED] point
CRSRU operating range 1,300–1,800 °C; 1,300–1,400 °C is the working range for dissociation (§3) [RULED] range; [INFERRED] working point
CRSRU pressure 0.5 atm assumed (follows the Recyclotron™, no blower rostered); a hot-gas booster to ~1.2 atm after the PCY is an option [OPEN]
Boundary Quench boiler outlet; recombination window ~800–1,200 °C traversed fast [RULED] D-REG-SCOPE-02
Heat source today Plasma torch, N₂ plasma gas (D-65-B) [RULED] supersedes D-65
Facility DC bus 1,500 VDC per Module, 30 kVDC building bus (D-PWR-02, LOCKED); 800 VDC device links at ≤250 kW per position (ICD-NXS-Z1-PBK-001); both carried [RULED] D-PWR-02; Architect 2026-11-02
Feed moisture into the Recyclotron™ ≤5 % proposed (clean-sheet route; dried in Pregenesis™ on recovered steam) [OPEN] — target for the Architect
Bed steam injection None under the clean-sheet route [OPEN] — reopens D-MCR-FLOW-01
Recyclotron™ purge / injection gas Recycled H₂ proposed instead of N₂ [OPEN] — reopens D-46

The "0–100 TPD" envelope — interpretation used here. [INFERRED] A parametric range per Line across the 50 TPD roster point, not one Module-spanning unit. Four points, per Line:

Point Line throughput Recyclotron™ loading (2 per Line)
P0 0 TPD hot standby
P25 25 TPD 2 × 12.5 TPD at ~150 kW, or 1 × 25 TPD at 300 kW
P50 50 TPD 2 × 25 TPD at 300 kW — rostered design point
P100 100 TPD 2 × 50 TPD at 600 kW — Line capability (D-LINE-02 headroom)

If "0–100 TPD" was meant as one Module-spanning unit, every per-Line figure doubles and the roster changes.


2. The feed on an element basis [COMPUTED]

DEFAULT_MSW (URVS-TBM-001 Rev 4): 23.7 % moisture, 55.1 % volatile, 11.0 % fixed carbon, 10.2 % ash as received; DAF C 57.0 / H 7.8 / O 32.9 / N 1.3 / S 0.27 / Cl 0.76. Per Line at P50, 2,083 kg/h:

Element mol/s kg/h Disposition under the clean-sheet route
Carbon 18.15 785 bed char 4.50 mol/s; CO 1.51; CO₂ 0.76; hydrocarbon carbon to the CRSRU 11.38
Hydrogen (H₂-eq) 14.80 107 4.84 mol/s bound as reaction water; 9.96 in hydrocarbons
Oxygen (organic) 7.87 453 CO 1.51, CO₂ 0.76 (model split), reaction water 4.84
Moisture 7.61 494 6.1 mol/s dried off in Pregenesis™ → WGS steam; 1.5 residual enters the reactor
N / S / Cl 0.36 / 0.03 / 0.08 18 / 4 / 10.5 NH₃ / H₂S / HCl — heteroatom ledger
Mineral — 212 with the bed char

The oxygen disposition rule: 453 kg/h of oxygen must leave as CO, CO₂ or H₂O. Each mol of water that reacts with carbon in the CRSRU trades one carbon atom for two H₂ (after shift). That is the only dial on the carbon/hydrogen split; CLEAN_SHEET_H2_CARBON.md §2 works it.


3. Vapour stream at the CRSRU inlet — W1 route [COMPUTED]

3.1 Method

Element basis from mswToFeedMoles at the model's species split (volatile carbon 30 % CH₄, 10 % CO, 5 % CO₂, 55 % tar surrogates benzene/toluene/naphthalene/phenol; fixed carbon 85 % to bed char), with feed moisture reduced to 1.5 mol/s, no bed steam, and the model's fixed 5 mol/s N₂ placeholder removed. In-reactor conversion is not credited at this level; the Rev 0 kinetic runs (τ = 2–10 s) showed the model converting 0–40 % of the CH₄ and consuming part of the water inside the reactor, which is carried as the range in §4. Sensible heats use mean JANAF cp (@acm/core) per species over 873→1,573 K; reaction terms use Hf298.

3.2 Vapour fraction [OPEN], carried as a range

Devolatilisation limit on the dried feed: volatiles + 15 % of fixed carbon + residual moisture + reaction water = 1,290 kg/h of 1,690 kg/h dried feed (76 %); published Rev 0 balance basis 59 %. Carried range 59–76 % of dried feed.

3.3 Vapour at the four points, per Line, N₂-free

Point Mass Molar flow Volume (0 °C, 1 atm)
P0 0 0 0
P25 645 kg/h 7.9 mol/s 640 Nm³/h
P50 1,290 kg/h 15.8 mol/s 1,270 Nm³/h
P100 2,580 kg/h 31.6 mol/s 2,550 Nm³/h

Composition at P50 (feed-inventory basis; in-reactor conversion shifts CH₄ and tars toward H₂ and carbon, and consumes some water):

Species mol/s mol % kg/h Note
H₂O 6.35 40 412 4.84 reaction water + 1.5 residual moisture. Will react with carbon in the CRSRU
CH₄ 4.55 29 263
Tars (C₆H₆, C₇H₈, C₁₀H₈, C₆H₆O surrogates) 0.91 6 316 (24 wt %) 6.8 mol/s of carbon
CO 1.51 10 152
CO₂ 0.76 5 120 Boudouard with carbon at >1,000 °C
H₂ 1.5 9 11
HCl / NH₃ / H₂S 0.2 1 18 9 / 6 / 3 kg/h

Rev 0's wet vapour (feed at 23.7 % moisture, bed steam on) was 1,750–1,790 kg/h with 35–52 mol % H₂O; the clean-sheet route removes ~480 kg/h of water from the stream before it reaches hot carbon.

3.4 Streams not in the figures — [OPEN]

Purge and injection gas (N₂ today, recycled H₂ proposed; D-46 unsized); Primary Cyclone fines slip (d < 5–10 µm); Enhancement Admix fines.


4. CRSRU thermal duty on the dissociation basis [COMPUTED]

4.1 Components per Line at P50

Term Reaction / basis 1,300 °C 1,400 °C 1,800 °C
Sensible heat of the vapour from 600 °C JANAF cp, §3.3 composition 0.77 MW 0.88 MW 1.32 MW
CH₄ dissociation CH₄ → C + 2 H₂, +74.9 kJ/mol × 4.55 mol/s 0.34 MW 0.34 0.34
Tar dissociation CₓHᵧ → x C + y/2 H₂ (phenol → 5 C + CO + 3 H₂); net exothermic −0.085 MW −0.085 −0.085
Steam-carbon C + H₂O → CO + H₂, +131 kJ/mol × 6.35 mol/s 0.83 MW 0.83 0.83
Boudouard C + CO₂ → 2 CO, +172 kJ/mol × 0.76 mol/s 0.13 MW 0.13 0.13
Vessel loss refractory-lined +5 % +5 % +5 %
Total 2.09 MW 2.20 MW 2.66 MW

Steam-carbon is complete at these temperatures with excess fine carbon present (equilibrium far to CO + H₂ above ~1,000 K; nanometre carbon reacts in well under a second). It is the largest reaction term and the reason the water split is decided in Pregenesis™, not here.

4.2 Duty cases used by every option file — per Line

Case Definition P25 P50 P100
LOW 1,300 °C; in-reactor CH₄ conversion credited (2.75 mol/s left) 1.0 MW 1.95 MW 3.9 MW
CENTRAL 1,400 °C; full CH₄ load; all water reacts 1.1 MW 2.2 MW 4.4 MW
HIGH 1,800 °C; same chemistry 1.3 MW 2.65 MW 5.3 MW

Compared with Rev 0 (reforming central 2.0 MW): the dissociation basis is not cheaper, because the water that reaches the CRSRU still reacts with carbon and CH₄ dissociation is added. What changes is the product: carbon instead of CO, and no CH₄ left for a reforming stage. The Rev 0 LOW case (0.9 MW) assumed no water reaction and is withdrawn.

4.3 Conflict with recorded figures — flagged, not resolved

D-ACM-ENERGY-01 carries ~0.35 MW per Module for "CRSRU torch, WGS unit, auxiliaries". The dissociation duty is 3.9–5.3 MW thermal per Module. See CLEAN_SHEET_H2_CARBON.md §3 for the energy ledger.


5. CRSRU outlet and quench interface [COMPUTED / INFERRED]

Per Line at P50, CENTRAL, Option C heater (N₂ loop); A2 and B carry no N₂ term.

Stream at quench inlet (1,400 °C, ~0.5 atm) mol/s kg/h Note
H₂ 16.3 118 9.96 from hydrocarbons + 6.35 from steam-carbon
CO 9.4 945 1.51 + 6.35 + 1.52 (Boudouard)
N₂ (Option C only) 9.5 955 loop gas
HCl, H₂S, N₂ from NH₃ 0.2 18 NH₃ dissociates
CH₄, tars, CO₂, H₂O ~0 ~0 complete dissociation / reaction assumed
Solid carbon formed in the CRSRU 4.28 185 nanometre carbon black; carries the heater's fume

Quench [RULED] fast through 1,200→800 °C; [INFERRED] below ~700 °C fine carbon in H₂-rich gas methanates (C + 2 H₂ → CH₄) if given time, so the quench must be fast through that range too. Quench steam serves Pregenesis™ drying and the WGS. Quench medium (boiler tubes vs recycled-gas) [OPEN].

Downstream: HRSG → candle filter (carbon black product) → condenser (little water) → acid-gas removal → WGS on the 6.1 mol/s dried-off water (H₂ to 163 kg/h; full shift with 3.3 mol/s boiler water → 186 kg/h) → CO₂ removal (1,070–1,485 kg/h) → PSA → H₂ to the Zero-E PowerBlock™; N₂ (Option C) back to the loop.

Carbon products per Line: bed char 195 kg/h (with 212 kg/h mineral), Primary Cyclone fines (pristine, split OPEN), CRSRU carbon black 185 kg/h. Total 380 kg/h = 18 % of feed. Hydrogen to the PowerBlock 163–186 kg/h = 7.8–8.9 %.


6. Facility electrical balance — the Z1 basis, verified (unchanged from Rev 0)

Quantity Value Basis as published
Zero-E PowerBlock™ output 32 MW 400 TPD facility, 128 PEM × 250 kW; 8 MW per 100 TPD Module
Magnetron load 11.52 MW 16 reactors × 720 kW AC — the 600 kW point (50 TPD capability per reactor)
Available NXS-Z1 balance ≤20.48 MW per 400 TPD facility
Per Line 4 MW generated; 1.44 MW magnetrons at 600 kW, 0.72 MW at the 300 kW design point scaled

The PowerBlock is fed by Regenesis™ hydrogen (Island Mode); every MW of CRSRU load is a hydrogen draw. The energy ledger in CLEAN_SHEET_H2_CARBON.md §3 shows the Line does not close on this feed.


7. Plasma-gas thermodynamics (unchanged from Rev 0) [COMPUTED]

N₂ ideal-cp enthalpy above 300 K: 2.4 MJ/kg at 2,000 K; 5.1 at 3,000 K; 9.5 at 4,000 K; 16.2 at 5,000 K; 25.6 at 6,000 K (no dissociation). Retained at the CRSRU outlet: 1.6 MJ/kg at 1,400 °C, 2.1 at 1,800 °C. Useful transfer per kg = h(torch) − h(outlet). 1 mol/s = 80.7 Nm³/h; 1 Nm³ N₂ = 1.25 kg.


8. Open items carried from this basis (not resolved here)

  1. Pregenesis™ moisture target (≤5 % proposed) and the drying heat allocation.
  2. Bed steam injection — none under this route; D-MCR-FLOW-01 to be reopened by ruling.
  3. Purge/injection gas — recycled H₂ proposed; D-46 to be reopened.
  4. CRSRU temperature within 1,300–1,400 °C — CH₄ dissociation completeness at 1,300 °C needs the simulator's CRSRU zone.
  5. CRSRU pressure and the hot-gas booster option.
  6. In-reactor conversion credit (0–40 % of CH₄) — case matrix.
  7. The 0–100 TPD reading (per Line, parametric).
  8. D-ACM-ENERGY-01's ~0.35 MW allowance; the Z1 balance at 600 kW; the hydrogen balance.
  9. Vapour fraction, Secondary Cyclone role, steam grade allocation, R1 limits, Line tags — untouched.
  10. A decision record for the 2026-11-02 function direction (D-65-B A1 answer).