CRSRU Heat Source — Common Design Basis (Rev 1, dissociation basis)
Rev 1 working file of the CRSRU heat-source sub-session, rendered as written; linked from MOD-DEF-001 §4.2. File name kept as the page title: 00_DESIGN_BASIS_COMMON.md.
| Document Number | CBT-MOD-CRSRU-001 |
| Design | Design Zero · 100 TPD Module |
| Document Status | DESIGN ZERO — WORKING DESIGN, UNLOCKED |
| Owner | Carbotura Inc. — Engineering; Allen Witters, Lead Systems Architect |
| Classification | ISC-2 Confidential |
| Authority | CBT-TB-PORTAL-014 (Architect, 2026-11-04) |
| Source of record | CRSRU_HEAT_SOURCE_DESIGN/00_DESIGN_BASIS_COMMON.md on main |
| Sub-session | CRSRU heat-source design (Doc Portal sub-session) · |
| Date | 2026-11-02 (Rev 1, same day) |
| Status | DESIGN INPUT — not a ruling, not a released specification |
| Work order | CRSRU_HEAT_SOURCE_BRIEF.md (Doc Portal, 2026-11-02) |
| Working decision name | D-65-C |
- 1. Scope and the throughput envelope
- 2. The feed on an element basis [COMPUTED]
- 3. Vapour stream at the CRSRU inlet — W1 route [COMPUTED]
- 4. CRSRU thermal duty on the dissociation basis [COMPUTED]
- 5. CRSRU outlet and quench interface [COMPUTED / INFERRED]
- 6. Facility electrical balance — the Z1 basis, verified (unchanged …
- 7. Plasma-gas thermodynamics (unchanged from Rev 0) [COMPUTED]
- 8. Open items carried from this basis (not resolved here)
Sub-session: CRSRU heat-source design (Doc Portal sub-session) · Date: 2026-11-02 (Rev 1, same day)
For: Allen Witters — Lead Systems Architect · Working decision name: D-65-C
Classification: ISC-2 Confidential · Status: DESIGN INPUT — not a ruling, not a released specification
Work order: CRSRU_HEAT_SOURCE_BRIEF.md (Doc Portal, 2026-11-02)
Rev 1 — what changed. The Architect directed in session on 2026-11-02 that the CRSRU dissociates
every hydrocarbon in the vapour to carbon and hydrogen; the priority is hydrogen and carbon products.
Rev 0 carried the CRSRU function as open (reforming vs tar-only) and sized duty on a steam-reforming
central case. Rev 1 sizes everything on the dissociation basis and on the clean-sheet route in
CLEAN_SHEET_H2_CARBON.md (feed dried to ~5 % moisture, no bed steam, dried-off water routed to the
Water Gas Shift). Rev 0's P50 composition table also carried per-species kg/h values that mixed the
25 and 50 TPD-per-reactor runs; corrected here.
How to read this. Provenance tags as in RECYCLOTRON_DESCRIPTION.md: [RULED] Architect
direction · [COMPUTED] derived and checkable, method stated · [INFERRED] sub-session reasoning,
needs confirmation · [OPEN] not yet determined. The in-session direction of 2026-11-02 is tagged
[RULED — direction, record pending] because no decision record has been written for it yet.
Simulator ceiling. Every number from C:\ACM-1\apps\mcr-sim carries its Class 4 Preliminary
ceiling (release.ts KNOWN_LIMITATIONS LIM-PLASMA-01, LIM-FLOW-01, LIM-RESIDENCE-01,
LIM-MORPHOLOGY-01). Rev 1 uses the model's feed characterisation and species split on an element
basis; the three-zone kinetic runs of Rev 0 are retained as the range on in-reactor conversion.
1. Scope and the throughput envelope
The CRSRU — Carbon Recovery Syngas Reforming Unit (ISO Frame type CBT-ISOFRT-REG-CRS) takes the
OmniCrude™ Vapor leaving the Primary Cyclone (CBT-ISOFRT-REG-PCY) at the Recyclotron™ outlet range,
raises it to the CRSRU operating range, dissociates every hydrocarbon to solid carbon and H₂, and
hands the stream to the Quench Boiler (CBT-ISOFRT-REG-QBR), which freezes the composition.
| Item | Value | Provenance |
|---|---|---|
| Module | 100 TPD = 2 Lines × 50 TPD, both duty, outputs combined | [RULED] D-LINE-02 |
| Recyclotrons | 2 per Line, 4 per Module, all duty; 25 TPD target each at 50 % duty, 50 TPD capability; 600 kW at 915 MHz; bulk 550–650 °C; 0.5 atm | [RULED] Architect 2026-11-01, D-65-A, D-MCR-* |
| Regenesis™ roster | MCR×4 · FDS×1 · PCY×2 · CRS×2 · PTS×2 · QBR×2 = 13 serials per Module | [RULED] D-REG-SCOPE-02 (LOCKED) |
| CRSRU per Line | 1 reforming vessel (REG-CRS) + 1 Plasma Torch Skid (REG-PTS) |
[RULED] D-REG-SCOPE-02 |
| CRSRU inlet | Vapour only, downstream of Primary Cyclone | [RULED] D-REG-SCOPE-02, Doctrine R35/R41 |
| CRSRU function | Dissociation of all hydrocarbons to C(s) + H₂; priority hydrogen and carbon products | [RULED — direction, record pending] Architect 2026-11-02 |
| CRSRU inlet temperature | 550–650 °C; 600 °C used for duty arithmetic | [RULED] range; [INFERRED] point |
| CRSRU operating range | 1,300–1,800 °C; 1,300–1,400 °C is the working range for dissociation (§3) | [RULED] range; [INFERRED] working point |
| CRSRU pressure | 0.5 atm assumed (follows the Recyclotron™, no blower rostered); a hot-gas booster to ~1.2 atm after the PCY is an option | [OPEN] |
| Boundary | Quench boiler outlet; recombination window ~800–1,200 °C traversed fast | [RULED] D-REG-SCOPE-02 |
| Heat source today | Plasma torch, N₂ plasma gas (D-65-B) | [RULED] supersedes D-65 |
| Facility DC bus | 1,500 VDC per Module, 30 kVDC building bus (D-PWR-02, LOCKED); 800 VDC device links at ≤250 kW per position (ICD-NXS-Z1-PBK-001); both carried |
[RULED] D-PWR-02; Architect 2026-11-02 |
| Feed moisture into the Recyclotron™ | ≤5 % proposed (clean-sheet route; dried in Pregenesis™ on recovered steam) | [OPEN] — target for the Architect |
| Bed steam injection | None under the clean-sheet route | [OPEN] — reopens D-MCR-FLOW-01 |
| Recyclotron™ purge / injection gas | Recycled H₂ proposed instead of N₂ | [OPEN] — reopens D-46 |
The "0–100 TPD" envelope — interpretation used here. [INFERRED] A parametric range per Line across the 50 TPD roster point, not one Module-spanning unit. Four points, per Line:
| Point | Line throughput | Recyclotron™ loading (2 per Line) |
|---|---|---|
| P0 | 0 TPD | hot standby |
| P25 | 25 TPD | 2 × 12.5 TPD at ~150 kW, or 1 × 25 TPD at 300 kW |
| P50 | 50 TPD | 2 × 25 TPD at 300 kW — rostered design point |
| P100 | 100 TPD | 2 × 50 TPD at 600 kW — Line capability (D-LINE-02 headroom) |
If "0–100 TPD" was meant as one Module-spanning unit, every per-Line figure doubles and the roster changes.
2. The feed on an element basis [COMPUTED]
DEFAULT_MSW (URVS-TBM-001 Rev 4): 23.7 % moisture, 55.1 % volatile, 11.0 % fixed carbon, 10.2 % ash
as received; DAF C 57.0 / H 7.8 / O 32.9 / N 1.3 / S 0.27 / Cl 0.76. Per Line at P50, 2,083 kg/h:
| Element | mol/s | kg/h | Disposition under the clean-sheet route |
|---|---|---|---|
| Carbon | 18.15 | 785 | bed char 4.50 mol/s; CO 1.51; CO₂ 0.76; hydrocarbon carbon to the CRSRU 11.38 |
| Hydrogen (H₂-eq) | 14.80 | 107 | 4.84 mol/s bound as reaction water; 9.96 in hydrocarbons |
| Oxygen (organic) | 7.87 | 453 | CO 1.51, CO₂ 0.76 (model split), reaction water 4.84 |
| Moisture | 7.61 | 494 | 6.1 mol/s dried off in Pregenesis™ → WGS steam; 1.5 residual enters the reactor |
| N / S / Cl | 0.36 / 0.03 / 0.08 | 18 / 4 / 10.5 | NH₃ / H₂S / HCl — heteroatom ledger |
| Mineral | — | 212 | with the bed char |
The oxygen disposition rule: 453 kg/h of oxygen must leave as CO, CO₂ or H₂O. Each mol of water that
reacts with carbon in the CRSRU trades one carbon atom for two H₂ (after shift). That is the only dial
on the carbon/hydrogen split; CLEAN_SHEET_H2_CARBON.md §2 works it.
3. Vapour stream at the CRSRU inlet — W1 route [COMPUTED]
3.1 Method
Element basis from mswToFeedMoles at the model's species split (volatile carbon 30 % CH₄, 10 % CO,
5 % CO₂, 55 % tar surrogates benzene/toluene/naphthalene/phenol; fixed carbon 85 % to bed char), with
feed moisture reduced to 1.5 mol/s, no bed steam, and the model's fixed 5 mol/s N₂ placeholder removed.
In-reactor conversion is not credited at this level; the Rev 0 kinetic runs (τ = 2–10 s) showed the
model converting 0–40 % of the CH₄ and consuming part of the water inside the reactor, which is carried
as the range in §4. Sensible heats use mean JANAF cp (@acm/core) per species over 873→1,573 K;
reaction terms use Hf298.
3.2 Vapour fraction [OPEN], carried as a range
Devolatilisation limit on the dried feed: volatiles + 15 % of fixed carbon + residual moisture + reaction water = 1,290 kg/h of 1,690 kg/h dried feed (76 %); published Rev 0 balance basis 59 %. Carried range 59–76 % of dried feed.
3.3 Vapour at the four points, per Line, N₂-free
| Point | Mass | Molar flow | Volume (0 °C, 1 atm) |
|---|---|---|---|
| P0 | 0 | 0 | 0 |
| P25 | 645 kg/h | 7.9 mol/s | 640 Nm³/h |
| P50 | 1,290 kg/h | 15.8 mol/s | 1,270 Nm³/h |
| P100 | 2,580 kg/h | 31.6 mol/s | 2,550 Nm³/h |
Composition at P50 (feed-inventory basis; in-reactor conversion shifts CH₄ and tars toward H₂ and carbon, and consumes some water):
| Species | mol/s | mol % | kg/h | Note |
|---|---|---|---|---|
| H₂O | 6.35 | 40 | 412 | 4.84 reaction water + 1.5 residual moisture. Will react with carbon in the CRSRU |
| CH₄ | 4.55 | 29 | 263 | |
| Tars (C₆H₆, C₇H₈, C₁₀H₈, C₆H₆O surrogates) | 0.91 | 6 | 316 (24 wt %) | 6.8 mol/s of carbon |
| CO | 1.51 | 10 | 152 | |
| CO₂ | 0.76 | 5 | 120 | Boudouard with carbon at >1,000 °C |
| H₂ | 1.5 | 9 | 11 | |
| HCl / NH₃ / H₂S | 0.2 | 1 | 18 | 9 / 6 / 3 kg/h |
Rev 0's wet vapour (feed at 23.7 % moisture, bed steam on) was 1,750–1,790 kg/h with 35–52 mol % H₂O; the clean-sheet route removes ~480 kg/h of water from the stream before it reaches hot carbon.
3.4 Streams not in the figures — [OPEN]
Purge and injection gas (N₂ today, recycled H₂ proposed; D-46 unsized); Primary Cyclone fines slip (d < 5–10 µm); Enhancement Admix fines.
4. CRSRU thermal duty on the dissociation basis [COMPUTED]
4.1 Components per Line at P50
| Term | Reaction / basis | 1,300 °C | 1,400 °C | 1,800 °C |
|---|---|---|---|---|
| Sensible heat of the vapour from 600 °C | JANAF cp, §3.3 composition | 0.77 MW | 0.88 MW | 1.32 MW |
| CH₄ dissociation | CH₄ → C + 2 H₂, +74.9 kJ/mol × 4.55 mol/s | 0.34 MW | 0.34 | 0.34 |
| Tar dissociation | CₓHᵧ → x C + y/2 H₂ (phenol → 5 C + CO + 3 H₂); net exothermic | −0.085 MW | −0.085 | −0.085 |
| Steam-carbon | C + H₂O → CO + H₂, +131 kJ/mol × 6.35 mol/s | 0.83 MW | 0.83 | 0.83 |
| Boudouard | C + CO₂ → 2 CO, +172 kJ/mol × 0.76 mol/s | 0.13 MW | 0.13 | 0.13 |
| Vessel loss | refractory-lined | +5 % | +5 % | +5 % |
| Total | 2.09 MW | 2.20 MW | 2.66 MW |
Steam-carbon is complete at these temperatures with excess fine carbon present (equilibrium far to CO + H₂ above ~1,000 K; nanometre carbon reacts in well under a second). It is the largest reaction term and the reason the water split is decided in Pregenesis™, not here.
4.2 Duty cases used by every option file — per Line
| Case | Definition | P25 | P50 | P100 |
|---|---|---|---|---|
| LOW | 1,300 °C; in-reactor CH₄ conversion credited (2.75 mol/s left) | 1.0 MW | 1.95 MW | 3.9 MW |
| CENTRAL | 1,400 °C; full CH₄ load; all water reacts | 1.1 MW | 2.2 MW | 4.4 MW |
| HIGH | 1,800 °C; same chemistry | 1.3 MW | 2.65 MW | 5.3 MW |
Compared with Rev 0 (reforming central 2.0 MW): the dissociation basis is not cheaper, because the water that reaches the CRSRU still reacts with carbon and CH₄ dissociation is added. What changes is the product: carbon instead of CO, and no CH₄ left for a reforming stage. The Rev 0 LOW case (0.9 MW) assumed no water reaction and is withdrawn.
4.3 Conflict with recorded figures — flagged, not resolved
D-ACM-ENERGY-01 carries ~0.35 MW per Module for "CRSRU torch, WGS unit, auxiliaries". The dissociation
duty is 3.9–5.3 MW thermal per Module. See CLEAN_SHEET_H2_CARBON.md §3 for the energy ledger.
5. CRSRU outlet and quench interface [COMPUTED / INFERRED]
Per Line at P50, CENTRAL, Option C heater (N₂ loop); A2 and B carry no N₂ term.
| Stream at quench inlet (1,400 °C, ~0.5 atm) | mol/s | kg/h | Note |
|---|---|---|---|
| H₂ | 16.3 | 118 | 9.96 from hydrocarbons + 6.35 from steam-carbon |
| CO | 9.4 | 945 | 1.51 + 6.35 + 1.52 (Boudouard) |
| N₂ (Option C only) | 9.5 | 955 | loop gas |
| HCl, H₂S, N₂ from NH₃ | 0.2 | 18 | NH₃ dissociates |
| CH₄, tars, CO₂, H₂O | ~0 | ~0 | complete dissociation / reaction assumed |
| Solid carbon formed in the CRSRU | 4.28 | 185 | nanometre carbon black; carries the heater's fume |
Quench [RULED] fast through 1,200→800 °C; [INFERRED] below ~700 °C fine carbon in H₂-rich gas methanates (C + 2 H₂ → CH₄) if given time, so the quench must be fast through that range too. Quench steam serves Pregenesis™ drying and the WGS. Quench medium (boiler tubes vs recycled-gas) [OPEN].
Downstream: HRSG → candle filter (carbon black product) → condenser (little water) → acid-gas removal → WGS on the 6.1 mol/s dried-off water (H₂ to 163 kg/h; full shift with 3.3 mol/s boiler water → 186 kg/h) → CO₂ removal (1,070–1,485 kg/h) → PSA → H₂ to the Zero-E PowerBlock™; N₂ (Option C) back to the loop.
Carbon products per Line: bed char 195 kg/h (with 212 kg/h mineral), Primary Cyclone fines (pristine, split OPEN), CRSRU carbon black 185 kg/h. Total 380 kg/h = 18 % of feed. Hydrogen to the PowerBlock 163–186 kg/h = 7.8–8.9 %.
6. Facility electrical balance — the Z1 basis, verified (unchanged from Rev 0)
| Quantity | Value | Basis as published |
|---|---|---|
| Zero-E PowerBlock™ output | 32 MW | 400 TPD facility, 128 PEM × 250 kW; 8 MW per 100 TPD Module |
| Magnetron load | 11.52 MW | 16 reactors × 720 kW AC — the 600 kW point (50 TPD capability per reactor) |
| Available NXS-Z1 balance | ≤20.48 MW | per 400 TPD facility |
| Per Line | 4 MW generated; 1.44 MW magnetrons at 600 kW, 0.72 MW at the 300 kW design point | scaled |
The PowerBlock is fed by Regenesis™ hydrogen (Island Mode); every MW of CRSRU load is a hydrogen draw.
The energy ledger in CLEAN_SHEET_H2_CARBON.md §3 shows the Line does not close on this feed.
7. Plasma-gas thermodynamics (unchanged from Rev 0) [COMPUTED]
N₂ ideal-cp enthalpy above 300 K: 2.4 MJ/kg at 2,000 K; 5.1 at 3,000 K; 9.5 at 4,000 K; 16.2 at 5,000 K; 25.6 at 6,000 K (no dissociation). Retained at the CRSRU outlet: 1.6 MJ/kg at 1,400 °C, 2.1 at 1,800 °C. Useful transfer per kg = h(torch) − h(outlet). 1 mol/s = 80.7 Nm³/h; 1 Nm³ N₂ = 1.25 kg.
8. Open items carried from this basis (not resolved here)
- Pregenesis™ moisture target (≤5 % proposed) and the drying heat allocation.
- Bed steam injection — none under this route; D-MCR-FLOW-01 to be reopened by ruling.
- Purge/injection gas — recycled H₂ proposed; D-46 to be reopened.
- CRSRU temperature within 1,300–1,400 °C — CH₄ dissociation completeness at 1,300 °C needs the simulator's CRSRU zone.
- CRSRU pressure and the hot-gas booster option.
- In-reactor conversion credit (0–40 % of CH₄) — case matrix.
- The 0–100 TPD reading (per Line, parametric).
- D-ACM-ENERGY-01's ~0.35 MW allowance; the Z1 balance at 600 kW; the hydrogen balance.
- Vapour fraction, Secondary Cyclone role, steam grade allocation, R1 limits, Line tags — untouched.
- A decision record for the 2026-11-02 function direction (D-65-B A1 answer).