Recyclotron™ Operating Point and Admix Recipe under the Carbon Priority
Rev 1 working file of the CRSRU heat-source sub-session, rendered as written; linked from MOD-DEF-001 §4.2. File name kept as the page title: RECYCLOTRON_OPTIMIZATION.md.
| Document Number | CBT-MOD-CRSRU-007 |
| Design | Design Zero · 100 TPD Module |
| Document Status | DESIGN ZERO — WORKING DESIGN, UNLOCKED |
| Owner | Carbotura Inc. — Engineering; Allen Witters, Lead Systems Architect |
| Classification | ISC-2 Confidential |
| Authority | CBT-TB-PORTAL-014 (Architect, 2026-11-04) |
| Source of record | CRSRU_HEAT_SOURCE_DESIGN/RECYCLOTRON_OPTIMIZATION.md on main |
| Sub-session | CRSRU heat-source design · |
| Date | 2026-11-02 · |
| Status | DESIGN ASSESSMENT — not a ruling |
| Reads with | 00_DESIGN_BASIS_COMMON.md Rev 1, CLEAN_SHEET_H2_CARBON.md Rev 1, RECYCLOTRON_DESCRIPTION.md, |
- 1. The short answer
- 2. Where the microwave energy goes today [COMPUTED] — the parasitic…
- 3. Temperature [INFERRED on RULED bounds]
- 4. Recipe — the admix as a control variable, not a blend [INFERRED]
- 5. Feed preparation — three things beyond "1 cm hammermilled, ferro…
- 6. Carrier, purge and fluidising gas — recycled H₂ [INFERRED]
- 7. Optimisations — ranked by what they buy [INFERRED]
- 8. What this assessment reopens
- 9. Open
Sub-session: CRSRU heat-source design · Date: 2026-11-02 · For: Allen Witters, Lead Systems Architect
Classification: ISC-2 Confidential · Status: DESIGN ASSESSMENT — not a ruling
Question answered: What is the optimum temperature and recipe? Feed is 1 cm hammermilled Manufacturing
Feedstock (the municipal feedstock of the question) with ferrous removed, admixed with 0–25 % pulverised Recyclotron™ bottom
solids or WTE-derived Enhancement Admix. Is the MCR doing as much work as possible; what optimisations
can we achieve?
Reads with: 00_DESIGN_BASIS_COMMON.md Rev 1, CLEAN_SHEET_H2_CARBON.md Rev 1, RECYCLOTRON_DESCRIPTION.md,
SIM_CASE_MATRIX.md, D-MCR-DIM-01 / FLOW-01 / FLOW-02 / PSD-01 / EM-01 / MOD-01, D-ACM-ARCH-01
Provenance tags: [RULED] [COMPUTED] [INFERRED] [OPEN]. Per Line at 50 TPD (2 × 25 TPD reactors) unless stated. The simulator is Class 4; its parasitic-load model is crude (fixed cp, no heat loss) and is used here as the Architect's own record uses it — as corroboration, not proof.
1. The short answer
- Temperature: bed 550–600 °C, under the ruled 650 °C ceiling; freeboard bulk 800–850 °C, deliberately non-uniform, bounded by the Inconel 625 wall at 980 °C. The bed is cool because the destruction is done by microplasma events, not by bulk heat; the freeboard is hot because every tar dissociated inside the vessel becomes pristine carbon at the Primary Cyclone instead of fume-contaminated carbon black at the CRSRU filter.
- Recipe: under D-ACM-ARCH-01 there is no recipe, there is an envelope and a control variable. The susceptor should be char-rich recycled bottom solids, dosed by closed-loop control on reflected power (raise admix until reflected power stops falling), which lands at EAF 0.10–0.15 with char-rich solids and 0.20–0.25 with WTE-derived Enhancement Admix. WTE-derived admix is admitted as a feedstock within the elemental envelope, not chosen as the susceptor, because it carries reducible oxides and carbonates that consume carbon and add CO₂.
- Is the MCR doing as much work as possible? No. On as-received feed about 95 % of the applied microwave energy goes into water and inert mass, not into dissociation. Drying the feed in Pregenesis™ (already in the clean-sheet route) and dropping bed steam turn the Recyclotron™ from a dryer into a dissociation reactor; the binding limit then moves from energy to field intensity per particle and gas velocity, which the case matrix can map.
2. Where the microwave energy goes today [COMPUTED] — the parasitic ledger
Per kg of as-received feed, bed at 900 °C-equivalent as in the simulator's parasiticLoadKJPerKg,
mineral and admix at cp ≈ 1.0 kJ/kg·K:
| Term | As-received (23.7 % moisture), EAF 0.25 WTE-derived admix | Dried to 5 %, EAF 0.15 char-rich recycled solids |
|---|---|---|
| Moisture: heat, evaporate, superheat | 990 kJ/kg | 210 kJ/kg (per kg dried feed) |
| Feed mineral (10.2 %) to bed temperature | 90 | 90 |
| Admix to bed temperature | 220 (0.25 × 880 K) | 130 (0.15 × 880 K) |
| Net reaction (dissociation ≈ thermoneutral; no bed steam) | ~0 | ~0 |
| Total parasitic | ~1,300 kJ/kg | ~430 kJ/kg |
| Applied at 300 kW per reactor, 25 TPD | 1,037 kJ/kg | 1,037 kJ/kg (per kg as-received-equivalent) |
| Share of applied energy available for dissociation | ≈ 0 % — the reactor is energy-bound by water | ≈ 60 % |
The simulator's own check (SIM_CASE_MATRIX.md): at nominal moisture and 600 kW the parasitic model
alone gives 48.8 TPD per reactor against a 50 TPD nameplate. That agreement was read as "the feed pays
for its own dissociation". It also means the microwave is paying for the water. Dry the feed and
the same 300 kW per reactor carries roughly 2.5× the dissociation energy per kg, or 2.5× the throughput
on the parasitic bound.
What becomes binding once the water is gone [INFERRED]:
1. Events per particle. A 1 cm × 50 µm film needs ~36 event-layers in its ~2 s descent
(RECYCLOTRON_DESCRIPTION.md §4). Event density scales with peak field and susceptor site density,
not with average power. Throughput can rise only until events per flake fall below the number needed
to consume it in flight — then flakes reach the bed unconsumed and devolatilise there instead
(slower, but still inside the vessel).
2. Gas velocity. Vapour plus carrier gas against the ~0.14 mm entrainment cut; more throughput means
more fines carried to the Primary Cyclone, which is tolerable (that carbon is pristine) up to the
cyclone's loading.
3. Bed inventory and the airlock (D-MCR-EM-01: 7 in or choke).
4. The 650 °C bed ceiling at turndown mismatch — the self-regulating sink (endothermic reaction)
is smaller without bed steam, so the interlock on power-versus-feed is tighter under the dry route.
None of these is an energy limit. The case matrix with the moisture axis at 5 % and EAF as a swept axis is the tool; the 1,440-case map runs in ~82 s.
3. Temperature [INFERRED on RULED bounds]
| Zone | Recommended | Why | Bound |
|---|---|---|---|
| Bed | 550–600 °C | Complete devolatilisation of the chips that reach it (cellulose by ~400 °C, polyolefins 400–500 °C); 50–100 °C margin to the ceiling for turndown mismatch; keeps the char as carbon product 1 (no steam, so no steam-carbon loss at any bed temperature); stays clear of alkali sintering (850 °C default, per-feedstock ASTM D1857 OPEN) | < 650 °C [RULED] |
| Freeboard, bulk | 800–850 °C, non-uniform | In-vessel tar dissociation on hot admix surfaces (Ca, Fe catalysed) rises steeply above ~750 °C; every kg dissociated here is pristine carbon at the Primary Cyclone and 1 kg less fume-carrying carbon black at the CRSRU; sits above the 400–800 °C metal-dusting window for the wall | wall service 980 °C [RULED]; creep margin on 10 mm Inconel 625 |
| Microplasma events | 4,000–6,000 °C, µs | unchanged | [RULED] |
Energy cost of the hot freeboard [COMPUTED]: vapour 0.36 kg/s at ~2 kJ/kg·K: ~70 kW per Line per 100 °C, taken from the magnetrons at 83 % and given back to the CRSRU torch at 58 % — a net saving of ~30 kW electric per 100 °C, plus the product-quality gain. Raising the freeboard from 650 to 850 °C costs ~140 kW thermal of the Line's 600 kW, which the dried feed has freed.
Zone split. 200 bed / 0 mid / 400 top is ruled at the wet design point. With the bed's drying duty gone, the bed needs less; sweep the split toward 150 / 0 / 450 and 100 / 0 / 500 in the case matrix rather than assume. The bed still needs enough field for microplasma on the chips; the floor is a field-intensity question, not an energy one.
4. Recipe — the admix as a control variable, not a blend [INFERRED]
4.1 What the admix does in the physics
| Function | Mechanism | Best source |
|---|---|---|
| Microwave coupling | Susceptor loss; the model uses absorption = 0.3 + 0.7 × ash fraction (crude) | Char is the strongest 915 MHz absorber available; magnetite-rich mineral next; silica/alumina/lime are weak at 600 °C |
| Microplasma sites | Pulverised susceptor creates 10–25 µm gaps at the Paschen minimum at 0.5 atm | any pulverised solid at the right size; char and mineral both |
| Catalysis | CaO, Fe, K₂O surfaces for tar dissociation and shift | WTE-derived admix is richer in CaO; recycled solids carry reduced Fe |
| Alkali getter / sintering | Ca/Si raise the eutectic; Na/K lower it | [OPEN] per feedstock |
| Inert mass to heat | parasitic 880 kJ per kg of admix | less is better |
4.2 Recycled bottom solids vs WTE-derived Enhancement Admix under the carbon priority
| Recycled bottom solids (char 195 + mineral 212 kg/h per Line, dry route) | WTE-derived Enhancement Admix | |
|---|---|---|
| Coupling | strong (char) | weak-to-moderate (CaO/SiO₂/Al₂O₃; Fe₂O₃ helps) |
| Oxygen carried in | none — already reduced | reducible oxides: Fe₂O₃ (5–10 %) consumes carbon, Fe₂O₃ + 3 C → 2 Fe + 3 CO; carbonates (5–20 %) calcine to CO₂; sulfates reduce to sulfide and leave as H₂S |
| Carbon cost at EAF 0.25, per Line | 0 — a dry bed does not consume recycled char; it circulates | ~8 kg/h carbon to Fe₂O₃ reduction, ~25–60 kg/h CO₂ from carbonates, S to the gas |
| New mass into the plant | none; mineral purge = mineral input (212 kg/h) | 422 kg/h per Line at EAF 0.25, all of it to the mineral line |
| Doctrine | admix is Pregenesis™'s to prepare; recycled solids need a return path Regenesis™ → Pregenesis™ (pulveriser, mixer) — exists for WTE-derived Enhancement Admix | the ruled susceptor to date |
| Verdict | susceptor of choice under the carbon priority | admit as feedstock within the elemental envelope; not the susceptor by default |
Why the recycled char costs nothing. Carbon product 1 is the fixed carbon leaving the bed. Under the dry route the bed consumes no carbon, so char sent round again leaves again; the net carbon product is the feed's fixed carbon whatever the recycle ratio. Its only costs are bed inventory and the sensible heat of the loop (~50 kW per Line at 195 kg/h, recoverable by admix preheat against the hot solids). With bed steam, recycled char would be consumed — one more reason the carbon priority and bed steam do not coexist.
4.3 Dosing — closed loop on reflected power
The Recyclotron™ has 3–5 sensors per microwave output and reflected power as the source-protection channel [RULED]. Reflected power is also the coupling signal: raise EAF until reflected power stops falling, then hold. That makes EAF the dependent output of the coupling physics, which is what D-ACM-ARCH-01 asks for. Expected operating band [INFERRED]: 0.10–0.15 with char-rich solids, 0.20–0.25 with WTE-derived admix. The matrix axis "EAF, 3 levels around 0.25" should be re-centred on 0.15 for the recycled-solids case.
4.4 Mineral balance
Mineral in = 212 kg/h per Line (feed) + whatever WTE-derived admix is admitted. Mineral out must equal mineral in, so the bottom-solids split is: recycle the char-rich fraction as susceptor, purge mineral at the input rate. That needs a carbon/mineral separation on the solids line (already OPEN in the clean-sheet route) — density or magnetic, before the pulveriser.
5. Feed preparation — three things beyond "1 cm hammermilled, ferrous removed" [INFERRED]
| Item | Why | Action |
|---|---|---|
| Non-ferrous removal (eddy current) | Aluminium foil and cans are field concentrators (arcing in a 915 MHz cavity with carbon dust) and Al melts at 660 °C — 10 °C above the bed ceiling. Molten Al at a bed hot spot is an agglomeration seed and a wall-wetting risk on Inconel | Add eddy-current separation after ferrous removal; the Al is an element to Metals Refining anyway |
| Thickness, not nominal size | Events needed to consume a flake scale with thickness ÷ 0.71 µm per event; a 1 cm × 50 µm film is consumed in flight, a 2 mm chip reaches the bed. Hammermilling sets nominal size; thickness is set by the material | Accept: films and paper vaporise in flight, chips devolatilise in the bed. No preparation change; the 13 mm top size (D-MCR-PSD-01) stands |
| Moisture ≤5 % | §2 | Clean-sheet route; the paddle dryers on quench steam |
6. Carrier, purge and fluidising gas — recycled H₂ [INFERRED]
Replacing N₂ and bed steam with recycled H₂ does four things at once: no inert at the GPU; no
steam-carbon loss in the bed; no CN/HCN formed from purge N₂ inside 4,000–6,000 °C events (the
heteroatom flag in RECYCLOTRON_DESCRIPTION.md §6 closes); and the cone aeration of D-MCR-FLOW-01/02 is
kept — H₂ is 9× lighter than steam, so the same superficial velocity needs one ninth of the mass.
Carbon methanation at 550–650 °C and 0.5 atm is slow and disfavoured. Hydrogen handling in the feed
train (airlocks, dense-phase injection) is the cost. Reopens D-MCR-FLOW-01 and D-46.
7. Optimisations — ranked by what they buy [INFERRED]
| # | Optimisation | What it buys per Line | Cost / reopens |
|---|---|---|---|
| 1 | Dry the feed to ≤5 % in Pregenesis™ | ~0.49 MW thermal of microwave parasitic load freed (≈ 0.35 MW electric, or ~2.5× dissociation capacity at the same power); +265 kg/h carbon vs the wet route | 0.36 MW recovered steam; Pregenesis™ moisture spec |
| 2 | No bed steam; recycled H₂ as carrier, purge and cone aeration | +95 kg/h carbon; no N₂ at GPU; no HCN from purge | D-MCR-FLOW-01, D-46; H₂ in the feed train |
| 3 | Char-rich recycled bottom solids as susceptor, EAF by reflected-power loop | strongest coupling; zero carbon cost; ~90 kJ/kg less parasitic than EAF 0.25 WTE-derived | solids carbon/mineral separation; return path to the Pregenesis™ mixer |
| 4 | Freeboard 800–850 °C bulk | more pristine carbon at the Primary Cyclone, less fume-carrying carbon black; ~30 kW net electric per 100 °C | wall creep margin; split sweep |
| 5 | Eddy-current non-ferrous removal | removes an arcing and agglomeration source (Al at 660 °C) | one Pregenesis™ unit |
| 6 | Pulse modulation (Gen 1) / phase control and frequency agility (Gen 2) | peak field ∝ 1/√duty — more microplasma events per average kW; the only lever on events-per-flake once the water is gone | LIM-PULSE-01: the model cannot evaluate it; Gen 2 per D-MCR-MOD-01 |
| 7 | Zone split sweep 150/0/450 and 100/0/500 | puts the freed bed power where the hot freeboard needs it | case-matrix run, no hardware |
| 8 | 60° bottom cone and 7 in airlock (already recommended) | mass flow, EAF uniformity at discharge, no leakage path | +0.475 m height |
| 9 | Admix preheat against hot bottom solids | ~50–80 kW thermal recovered | one solids heat exchanger |
| 10 | Hot-gas booster after the Primary Cyclone | halves downstream volumes, −0.5–0.7 MW GPU compression | a 600 °C booster on carbon-laden vapour |
Items 1–3 are the large ones and they are one decision: dry, no steam, char susceptor. Together they move the Recyclotron™ from ~0 % to ~60 % of its applied energy going into dissociation and keep ~360 kg/h more carbon per Line than the wet, steam-fed basis.
8. What this assessment reopens
D-MCR-FLOW-01 (bed steam), D-46 (carrier gas), the EAF 0.25 target and the WTE-ash-as-susceptor
assumption in CBT-PRE-TDS-003 (SHRD-MXR, Enhancement Admix Pulverizer), the 200/0/400 split as a
design point, the Pregenesis™ separation train (eddy current), and the case-matrix axes (moisture at 5 %,
EAF re-centred, split levels). None is ruled here.
9. Open
Ash sintering onset per feedstock (ASTM D1857); Jenike shear-cell data for the discharge; events-per-flake versus throughput (needs the microplasma sub-grid term, LIM-PLASMA-01); char/mineral separation method; H₂ handling in the feed train; freeboard wall creep margin at 850 °C bulk with hot spots; whether the Line rating is re-based once the parasitic bound is removed (a Module-level commercial question, not an engineering one).